TJ Thomas Joseph
- Login: thomas.j@elpisitsolutions.com
- Registered on: 31/01/2024
- Last sign in: 04/03/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 19 | 0 | 19 |
| Reported issues | 282 | 10 | 292 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| CABS-VPX SBC | Manager, HW_Lead | 16/01/2026 |
| Chola Turbo Machinery Pvt Ltd | Manager | 06/01/2026 |
| Core4 | Manager | 19/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Production | Manager | 19/01/2026 |
| mTracker(Mid Range GW)-Pilot | Manager | 19/01/2026 |
| mTracker(Mid Range GW)-Production | Manager | 19/01/2026 |
| SAMA5D4 Hardware Development | HW_Lead | 05/01/2026 |
| TPMS 2-Wheeler | Manager | 05/01/2026 |
| TPMS 4 Wheeler | Manager | 05/01/2026 |
Activity
10/03/2026
- TJ 05:18 PM TPMS 4 Wheeler Task #2893: Detailed Design
- 1. keep only one dsn file in the design folder
2. schematic revision history not updated in .dsn(many times reviewed by consultant)
3. .brd => create views ( like V_Top: sst, pad, via) and analyse
4. SS at pcb edge, pad, via to be avoid...
09/03/2026
- TJ 03:46 AM Gateway 3.0 Task #3355 (Resolved): TV3.0 Hardware Readiness
- TJ 03:41 AM Gateway 3.0 Task #3355 (Resolved): TV3.0 Hardware Readiness
- Use a TTL to RS232 module with L21 and terminate the RS232 signal at the Terminal block
- TJ 03:45 AM Gateway 3.0 Task #3359 (New): Data posting over 4G
- TJ 03:41 AM Gateway 3.0 Task #3354 (New): Phase 0B
- TV3.0 with RS232 , RS485, 4G cor K T Telematics demo
- TJ 03:41 AM Gateway 3.0 Task #3356 (New): Embedded SW-Development
06/03/2026
- TJ 04:16 AM Chola Turbo Machinery Pvt Ltd Task #3239: Installation Support
- Regarding LED/Dashboard
What is the indication when modbus TCP fail (TCP connection or read timeout)
What is the indication for a successful Modbus read
What is the indication when data is posting
What is the indication when 4G ... - TJ 04:15 AM Chola Turbo Machinery Pvt Ltd Task #3239: Installation Support
> 7. Feedback, Alarm, Trips not updating in dashboard => https://teams.microsoft.com/l/message/19:meeting_ZDEyMGJkNzEtMTkxZC00N2UyLWI1ZTUtOWViMjg4NGIyYTY2@thread.v2/1772625859560?context=%7B%22contextType%22%3A%22chat%22%7D
> ...
Issue ...- TJ 04:12 AM Chola Turbo Machinery Pvt Ltd Task #3239: Installation Support
- Issues with Trend Graph
1. The graph is plotted as a sample series but required as many parameters vs one parameter => https://teams.microsoft.com/l/message/19:meeting_ZDEyMGJkNzEtMTkxZC00N2UyLWI1ZTUtOWViMjg4NGIyYTY2@thread.v2/1772728...
04/03/2026
- TJ 05:38 PM Chola Turbo Machinery Pvt Ltd Task #3239: Installation Support
- 04/03/2026
1. Wireshark debug tried but due to the presence of switcth (ORing IES-C1050 5FE Unmanaged Ethernet Switch) connecting device and PLC, traffic not reaching in the port connected to laptop => Verify in Lab setup
> > Google :
...