RK Resmi K.V
- Login: Resmi
- Registered on: 31/01/2024
- Last sign in: 10/03/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 7 | 0 | 7 |
| Reported issues | 0 | 0 | 0 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| Core4 | HW_Lead | 19/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Pilot | Hardware Engr. | 13/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Production | HW_Lead | 19/01/2026 |
| mTracker(Mid Range GW)-Pilot | HW_Lead | 19/01/2026 |
| mTracker(Mid Range GW)-Production | HW_Lead | 19/01/2026 |
| Gateway 3.0 | Hardware Engr. | 25/02/2026 |
| SAMA5D4 Hardware Development | Developer | 23/12/2025 |
| TPMS 2-Wheeler | Developer | 23/12/2025 |
| TPMS 4 Wheeler | Developer | 29/12/2025 |
Activity
10/03/2026
- RK 12:32 PM TPMS 4 Wheeler 3:00 hours (Task #2893 (In Progress): Detailed Design)
- PCB design
- RK 12:31 PM TPMS 4 Wheeler Task #2893: Detailed Design
- Updated SSB,SST and created the panel for 4W. need to review by Sumanth and Thomas sir.
updated design uploaded in onedrive: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQA7LrVpxnA0Q74mFc6GOz20AcbTU...
05/03/2026
- RK 12:37 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3191 (In Progress): PCB Design)
- PCB design
- RK 12:24 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
- Updated the board file (smoothening of traces and GND plane extended). please review this latest board file which is uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAxeTsjlfYdToa...
03/03/2026
- RK 11:19 AM mDAQ4-1(Mid Range mDAQ)-Production 6:00 hours (Task #3191 (In Progress): PCB Design)
- PCB design
- RK 11:19 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
- Routing completed. need to be discussed with Thomas sir. GND plane to be created for AI,DI and DO.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQB2rlrAbqQHSJJD-Dfu_IhLAeaijft6fn91TBIm5Q4545Q?e=vCPh18
02/03/2026
- RK 01:21 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3191 (In Progress): PCB Design)
- PCB design
- RK 01:21 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
- Routing is in progress. ADC inputs only pending.Ground planes to be discussed.
Updated design uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAFP53aw7DVQZ2CN769xhP-AdLjqLlA5Dy...
27/02/2026
- RK 01:56 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3191 (In Progress): PCB Design)
- PCB design
- RK 01:56 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
- PCB routing is in progress. Gnd Plane to be discussed with thomas sir.
Updated design uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQCEj3jCUe_wS4lCTlGiNN5zAa13Rh3HOtX7F5vSi4tD4...