Resmi K.V
- Login: Resmi
- Registered on: 31/01/2024
- Last sign in: 21/07/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 12 | 0 | 12 |
| Reported issues | 0 | 0 | 0 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| Ad-Hoc Design and Development | Hardware Engr. | 05/05/2026 |
| L21 Platform | HW_Lead | 03/07/2026 |
| N58 Open CPU Platform | Developer | 27/03/2026 |
| Gateway 3.0 | Hardware Engr. | 25/02/2026 |
| SAM E54 Platform | Hardware Engr. | 06/08/2026 |
| mDAQ4-1(Mid Range mDAQ)-Pilot | Hardware Engr. | 13/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Production | HW_Lead | 19/01/2026 |
| mTracker(Mid Range GW)-Pilot | HW_Lead | 19/01/2026 |
| mTracker(Mid Range GW)-Production | HW_Lead | 19/01/2026 |
| GW 2.2 | Hardware Engr. | 06/08/2026 |
| SAMA5D2_XPLD | HW_Lead | 19/05/2026 |
| SAMA5D4 Platform | HW_Lead | 27/03/2026 |
| SAMA5D4 Hardware Development | Developer | 23/12/2025 |
| TPMS 2-Wheeler | Developer | 23/12/2025 |
| TPMS 4 Wheeler | Developer | 29/12/2025 |
Activity
24/06/2026
-
07:31 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3208: PLCIO PCB Assembly
- Board sent for assembly will receive on 24/06/2024
-
07:28 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3199: PLCIO PCB Fabrication
- Fabrication completed and board received on 12/06/2026.
28/05/2026
-
05:36 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3195: Design of Enclosure Cutouts
- Connector PCB design need to be completed. according to that, need to make the cutouts. Step file created for the stacked PCBs.
Review comments documents has been uploaded in onedrive : https://elpisit-my.sharepoint.com/:x:/g/personal/s... -
05:32 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3191 (Resolved): PCB Design
-
05:32 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3192 (Resolved): Schematic Design
- Schematic completed
Design folder: https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgDSWT87l0VAQLoJXh_GAGg8AYuJ01Kqv-kSRP5glSghVRQ?e=8FutNd -
05:31 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3192: Schematic Design
- Schematic completed
Design folder: https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgDSWT87l0VAQLoJXh_GAGg8AYuJ01Kqv-kSRP5glSghVRQ?e=8FutNd
27/05/2026
-
05:30 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
- PLCIO V2P0 PCB design completed and Gerber released on 26/05/2026.
Design folder is uploaded in onedrive: https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgDSWT87l0VAQLoJXh_GAGg8AYuJ01Kqv-kSRP5glSghVRQ?e=...
26/05/2026
-
01:34 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3195 (In Progress): Design of Enclosure Cutouts)
- Created Stepfile for Enclosure with stacked PCBs and relaeased Gerber for PCB fabrication.
21/05/2026
-
09:48 AM mDAQ4-1(Mid Range mDAQ)-Production 4:00 hours (Task #3195 (In Progress): Design of Enclosure Cutouts)
- Mechanical design
-
09:48 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3195 (In Progress): Design of Enclosure Cutouts
- As per the discussion suggested points are updated and created the step file
1. Connector changed to PLCIO PCB
2. Connector PCB moved 1.2mm inward direction for the enclosure to make it inflush with the Enclosure wall
3. Cutout has be...