Sumanth D
- Login: Sumanth
- Registered on: 31/01/2024
- Last sign in: 01/07/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 29 | 0 | 29 |
| Reported issues | 1 | 0 | 1 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| Ad-Hoc Design and Development | Hardware Engr. | 07/07/2026 |
| Flipkart CRM | HW_Lead | 30/07/2026 |
| Kardib | Hardware Engr. | 04/06/2026 |
| mDAQ4-1(Mid Range mDAQ)-Pilot | HW_Lead | 06/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Production | Developer | 21/01/2026 |
| mTracker(Mid Range GW)-Pilot | Developer | 21/01/2026 |
| mTracker(Mid Range GW)-Production | Developer | 21/01/2026 |
| SAMA5D4 Platform | HW_Lead | 27/03/2026 |
| SAMA5D4 Hardware Development | Developer | 23/12/2025 |
| TPMS 2-Wheeler | Manager, Developer | 23/12/2025 |
| TPMS 4 Wheeler | Manager, Developer | 29/12/2025 |
Activity
20/07/2026
-
01:49 PM Common Engineering Support #3727: KT Telematics Faulty Device From Customer
- Device from KT telematics has been rectified and tested RS485 and RS232.
The ESD diode was damaged due to some wrong connections at client side.
The Diode is replaced and tested and verified with Dock light and Dashboard. The Temp ... -
01:47 PM Common Engineering Support #3727 (New): KT Telematics Faulty Device From Customer
-
06:03 AM Ad-Hoc Design and Development 16:00 hours (Task #3726 (Analysis Started): Mumbai-Expo-July-2026)
- Expo
-
06:03 AM Ad-Hoc Design and Development Task #3726: Mumbai-Expo-July-2026
- Arranged Demo units
1. 8 DI
2. 4 AI
3. Edge Gateway
4. VAS(mDAQ3)
5. mTracker lite(Dummy Piece)
15/07/2026
-
04:39 AM Ad-Hoc Design and Development 6:00 hours (Task #3726 (Analysis Started): Mumbai-Expo-July-2026)
- Mechanical
-
04:39 AM Ad-Hoc Design and Development Task #3726: Mumbai-Expo-July-2026
- Arranged Motor setup for Vibration analyzer for expo
10/07/2026
-
12:26 PM Ad-Hoc Design and Development 1:00 hour (Task #3706 (In Progress): Flipkart - Cold room monitoring)
- Block diagram for new design
-
12:26 PM Ad-Hoc Design and Development Task #3706: Flipkart - Cold room monitoring
- https://elpisit.sharepoint.com/:x:/s/EmbeddedFiles/IQBarbil0XJ_Qaa9KI8PQDdrAfs2WWaxD4G4buXHVc2jiJ8?e=8rrkwq - Block diagram
https://elpisit.sharepoint.com/:w:/s/EmbeddedFiles/IQBK3Fho9fO6QqC6hxm2wwChAeCF7z5nuwSG6E4VxrCOe9w?e=Ya9UxF - PR...
08/07/2026
-
11:04 AM Ad-Hoc Design and Development 6:00 hours (Task #3706 (In Progress): Flipkart - Cold room monitoring)
- Rework
-
11:04 AM Ad-Hoc Design and Development Task #3706: Flipkart - Cold room monitoring
- <img style="width: 1249px;" src="clipboard-202607081630-hj7zo.png"><br>
In Tracker V3 rework was completed for 4 channels as shown in the attached rework image.
https://elpisit.sharepoint.com/:x:/s/EmbeddedFiles/IQAtap3e-GFlRre3FdsXj...