VenuMadhav S
- Login: VenuMadhav
- Registered on: 31/01/2024
- Last sign in: 02/07/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 87 | 6 | 93 |
| Reported issues | 12 | 0 | 12 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| Ad-Hoc Design and Development | Hardware Engr. | 07/07/2026 |
| Flipkart CRM | Hardware Engr. | 30/07/2026 |
| Gateway 3.0 | HW_Lead | 25/02/2026 |
| SAM E54 Platform | Hardware Engr. | 06/08/2026 |
| Chola Turbo | HW_Lead | 02/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Pilot | Manager, Hardware Engr. | 06/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Production | Manager, Hardware Engr. | 09/01/2026 |
| mTracker(Mid Range GW)-Pilot | Manager, Hardware Engr. | 06/01/2026 |
| mTracker(Mid Range GW)-Production | Manager, Hardware Engr. | 09/01/2026 |
| Gateway V2 | Manager | 24/12/2025 |
| Gateway V2.1 | Manager | 24/12/2025 |
| GW 2.2 | Hardware Engr. | 02/06/2026 |
| SAMA5D4 Hardware Development | HW_Lead | 27/03/2026 |
| VAS Product Release 2.0 | Manager | 09/12/2025 |
Activity
01/07/2026
-
06:20 AM VAS Product Release 2.0 Task #3692: Onsite Installation
- On 22/06/2026 @VenuMadhav and @Surendra Visit:
1. I have given training about previous data loading and analyse.
2. Temperature transmitter's calibrated(Now it is showing correct value 31 degree and 34 degree).
3. Taken the log file...
02/06/2026
-
09:27 AM VAS Product Release 2.0 1:00 hour (Task #3664 (Closed): mDAQ3 I/F schematic revision)
- schematic update
-
09:27 AM VAS Product Release 2.0 Task #3664 (Closed): mDAQ3 I/F schematic revision
- https://elpisit.sharepoint.com/:u:/s/EmbeddedFiles/IQD-Z8vizN_LRLYpVYK_GziFAS9TZKFPOwA7VakyyoLcN2k?e=a1HWQe
Updated with V1.1
Rework completed as per the rework sheet.
https://elpisit.sharepoint.com/:f:/s/EmbeddedFiles/IgDpukDJ0ASJR...
08/05/2026
-
05:48 AM VAS Product Release 2.0 Task #3419: Analog Input - Hardware Integration
- mDAQ3 unit was integrated with ADS1115 module. Handed over to Software development.
20/04/2026
-
11:02 AM VAS Product Release 2.0 Task #3392: Project Planning and Review
- 1. Face Plate Design.
2. Panel Assembly.
3. mDAQ3(V1.1) PCB Testing.
08/04/2026
-
06:22 AM VAS Product Release 2.0 Task #3436 (Analysis Done): Pre-Installation Visit
- https://elpisit-my.sharepoint.com/:w:/g/personal/satish_sl_elpisitsolutions_com/IQDLLyN_get9QLdW1aWUPyCxAb-tO7y27yhZIEB14KaYzX4?e=FTiNn1
-
05:26 AM VAS Product Release 2.0 Task #3413 (Closed): PCB Revision and Gerber release
-
05:26 AM VAS Product Release 2.0 Task #3413: PCB Revision and Gerber release
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQCmcouK5DTnTaavtwoXS1WVAR8uL5ztz3TbT1eEHDT6Llw?e=WARlyY
Gerber File -
05:21 AM VAS Product Release 2.0 Task #3409: Performance check with LAN
- Switch Provided to do Performance check with LAN.
27/03/2026
-
02:09 PM VAS Product Release 2.0 Task #3413 (Analysis Done): PCB Revision and Gerber release
- https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQAYa463aQmvRov_X2jOW3whAYDpzmS0Qq5xebsJFpNuNE4?e=EcJ7LG
Updated Rework sheet.