  • Login: VenuMadhav
  • Registered on: 31/01/2024
  • Last sign in: 02/07/2026

Issues

open closed Total
Assigned issues 87 6 93
Reported issues 12 0 12

Projects

Project Roles Registered on
Ad-Hoc Design and Development Hardware Engr. 07/07/2026
Flipkart CRM Hardware Engr. 30/07/2026
Gateway 3.0 HW_Lead 25/02/2026
SAM E54 Platform Hardware Engr. 06/08/2026
Chola Turbo HW_Lead 02/01/2026
mDAQ4-1(Mid Range mDAQ)-Pilot Manager, Hardware Engr. 06/01/2026
mDAQ4-1(Mid Range mDAQ)-Production Manager, Hardware Engr. 09/01/2026
mTracker(Mid Range GW)-Pilot Manager, Hardware Engr. 06/01/2026
mTracker(Mid Range GW)-Production Manager, Hardware Engr. 09/01/2026
Gateway V2 Manager 24/12/2025
Gateway V2.1 Manager 24/12/2025
GW 2.2 Hardware Engr. 02/06/2026
SAMA5D4 Hardware Development HW_Lead 27/03/2026
VAS Product Release 2.0 Manager 09/12/2025

Activity

01/07/2026

06:20 AM VAS Product Release 2.0 Task #3692: Onsite Installation
On 22/06/2026 @VenuMadhav and @Surendra Visit:
1. I have given training about previous data loading and analyse.
2. Temperature transmitter's calibrated(Now it is showing correct value 31 degree and 34 degree).
3. Taken the log file...
VenuMadhav S

02/06/2026

09:27 AM VAS Product Release 2.0 1:00 hour (Task #3664 (Closed): mDAQ3 I/F schematic revision)
schematic update VenuMadhav S
09:27 AM VAS Product Release 2.0 Task #3664 (Closed): mDAQ3 I/F schematic revision
https://elpisit.sharepoint.com/:u:/s/EmbeddedFiles/IQD-Z8vizN_LRLYpVYK_GziFAS9TZKFPOwA7VakyyoLcN2k?e=a1HWQe
Updated with V1.1
Rework completed as per the rework sheet.
https://elpisit.sharepoint.com/:f:/s/EmbeddedFiles/IgDpukDJ0ASJR...
VenuMadhav S

08/05/2026

05:48 AM VAS Product Release 2.0 Task #3419: Analog Input - Hardware Integration
mDAQ3 unit was integrated with ADS1115 module. Handed over to Software development. VenuMadhav S

20/04/2026

11:02 AM VAS Product Release 2.0 Task #3392: Project Planning and Review
1. Face Plate Design.
2. Panel Assembly.
3. mDAQ3(V1.1) PCB Testing.
VenuMadhav S

08/04/2026

06:22 AM VAS Product Release 2.0 Task #3436 (Analysis Done): Pre-Installation Visit
https://elpisit-my.sharepoint.com/:w:/g/personal/satish_sl_elpisitsolutions_com/IQDLLyN_get9QLdW1aWUPyCxAb-tO7y27yhZIEB14KaYzX4?e=FTiNn1 VenuMadhav S
05:26 AM VAS Product Release 2.0 Task #3413 (Closed): PCB Revision and Gerber release
VenuMadhav S
05:26 AM VAS Product Release 2.0 Task #3413: PCB Revision and Gerber release
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQCmcouK5DTnTaavtwoXS1WVAR8uL5ztz3TbT1eEHDT6Llw?e=WARlyY
Gerber File
VenuMadhav S
05:21 AM VAS Product Release 2.0 Task #3409: Performance check with LAN
Switch Provided to do Performance check with LAN. VenuMadhav S

27/03/2026

02:09 PM VAS Product Release 2.0 Task #3413 (Analysis Done): PCB Revision and Gerber release
https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQAYa463aQmvRov_X2jOW3whAYDpzmS0Qq5xebsJFpNuNE4?e=EcJ7LG
Updated Rework sheet.
VenuMadhav S