General

Profile

VS VenuMadhav S

  • Login: VenuMadhav
  • Registered on: 31/01/2024
  • Last sign in: 11/03/2026

Issues

open closed Total
Assigned issues 75 2 77
Reported issues 12 0 12

Projects

Project Roles Registered on
Chola Turbo Machinery Pvt Ltd HW_Lead 02/01/2026
Core4 Manager, Hardware Engr. 05/01/2026
mDAQ4-1(Mid Range mDAQ)-Pilot Manager, Hardware Engr. 06/01/2026
mDAQ4-1(Mid Range mDAQ)-Production Manager, Hardware Engr. 09/01/2026
mTracker(Mid Range GW)-Pilot Manager, Hardware Engr. 06/01/2026
mTracker(Mid Range GW)-Production Manager, Hardware Engr. 09/01/2026
Gateway 3.0 HW_Lead 25/02/2026
Gateway V2 Manager 24/12/2025
Gateway V2.1 Manager 24/12/2025

Activity

17/02/2026

VS 11:32 AM mTracker(Mid Range GW)-Production Task #3164: PCB Design
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQB2Bey1QOAmQqPvCE4tc0Q3AYajYUPbMRwrmLzCZWcnEjE?e=dL5GKF VenuMadhav S

06/02/2026

VS 03:38 PM mTracker(Mid Range GW)-Production Task #3164: PCB Design
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQBkF3KrFibuRrDO8zS_kA0bAY3OGyz4Je1RELxlA-UrDUM?e=t4zxtB VenuMadhav S

29/01/2026

VS 04:50 AM mTracker(Mid Range GW)-Pilot Task #2933: Design of Enclosure Cutouts
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAARDBjtR0ETqFPNZss_vv0ASqApsiV6jKOXXnHDfVbysw?e=bwdiTt
Design Stepfile
VenuMadhav S

25/01/2026

VS 01:24 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
We received the GW V2.0 assembled PCB's from uV.
Started the testing. We identified the components wrong placement at the I/P protection section and sub sequent sections.
Due to that it testing got delayed.
VenuMadhav S

23/01/2026

VS 10:14 AM mTracker(Mid Range GW)-Pilot Task #3232 (Resolved): Rework Sheet
https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQAxYIVVNhMpRrGEVi1yzmiTARuMVsDtVURJAZtOiMzEHRQ?e=nvhgIk
Rework sheet updated
VenuMadhav S
VS 02:35 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3000: Assembly Manual (Documentation)
PLCIO integration Assembly completed and document needs to be prepare. VenuMadhav S
VS 02:35 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3000 (In Progress): Assembly Manual (Documentation)
VenuMadhav S
VS 02:34 AM mTracker(Mid Range GW)-Pilot Task #3047 (In Progress): Review/Update of GW2.0 Test Plan and Procedure
Pls refer the TPP.
https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQDsXzRdE9FqQrbdlyXI_cYZAep7doTl9zUdInK22y74CHA?e=9owtJj
VenuMadhav S

22/01/2026

VS 03:31 PM mTracker(Mid Range GW)-Production Task #3163: Schematic Design
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAEuoXpF0gpSpNnMW_XGwgBATYoZf1mJFcUr4f-XUExl14?e=4ee4z5--
RS485- Added- sercom7-PD08-TX
PD09-RX
SPI Lan circuit deleted.
...
VenuMadhav S
VS 03:31 PM mTracker(Mid Range GW)-Production 4:00 hours (Task #3163 (In Progress): Schematic Design)
RS-485 schematic design added VenuMadhav S

Also available in: Atom