Hours: 1283:53

Project Date User Activity Issue Comment Hours Status Author Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Milestone Reference Critical Path Severity
mTracker(Mid Range GW)-Production 19/01/2026 Bhavani M Design Task #3163: Schematic Design N58 schematic creation 4:00 In Progress Bhavani M 19/01/2026 02:39 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 19/01/2026 Resmi K.V Design Task #2850: Detailed Design Layout Design 5:00 In Progress Resmi K.V 19/01/2026 01:47 PM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
Chola Turbo Machinery Pvt Ltd 19/01/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J 19/01/2026 01:06 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J 19/01/2026 01:04 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Dhanasekar T Design Task #2986: Design of Enclosure Cutouts Design uploaded 0:06 Resolved Dhanasekar T 19/01/2026 11:54 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 19/01/2026 Dhanasekar T Documentation Task #2970: Parts List(Mech. Assembly) Updated 0:30 Resolved Dhanasekar T 19/01/2026 11:41 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 19/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Critical Project Update call 1:00 In Progress Thomas Joseph 19/01/2026 11:22 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 19/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 1:00 In Progress Thomas Joseph 19/01/2026 11:21 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
SAMA5D4 Hardware Development 19/01/2026 Resmi K.V Design Task #2850: Detailed Design Layout Design 3:00 In Progress Resmi K.V 19/01/2026 09:46 AM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mTracker(Mid Range GW)-Pilot 19/01/2026 DEVI PRIYAA Development Task #2968: SW-Development Software Development 2:00 In Progress DEVI PRIYAA 19/01/2026 09:37 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Sumanth D Documentation Task #3162: Programming Model Update Programming model 0:30 Resolved Sumanth D 19/01/2026 07:00 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Sumanth D Documentation Task #3156: Hardware Setup readiness for software development Interface arch 1:00 Resolved Sumanth D 19/01/2026 06:50 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Gateway V2.1 19/01/2026 Bhavani M Design Task #3057: Schematic Design Modification WiFi_4G PCB GWV2_1 Board file 1:00 In Progress Bhavani M 19/01/2026 05:48 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Yoganand D Testing Task #2930: Test PLCIO with CTB application Completed Testing 0:00 Resolved Yoganand D 19/01/2026 05:47 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Gateway V2.1 19/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Controller board dsn file 1:00 In Progress Bhavani M 19/01/2026 05:44 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 19/01/2026 Bhavani M Design Task #2887: New Enclosure - Complete Design and Development Gateway v2_1 Step file 1:00 In Progress Bhavani M 19/01/2026 05:42 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 19/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Wifi-4G Schematic Pdf 1:00 In Progress Bhavani M 19/01/2026 05:39 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 19/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB GWV2_1 Schematic 1:00 In Progress Bhavani M 19/01/2026 05:37 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Chola Turbo Machinery Pvt Ltd 19/01/2026 Dhanasekar T Procurement Task #2938: Enclosure fabrication Machining and laser marking completed 0:06 Resolved Dhanasekar T 19/01/2026 05:32 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Process started 0:06 Resolved Dhanasekar T 19/01/2026 05:29 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph 19/01/2026 05:26 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Thomas Joseph Design Task #2984: Preliminary Design Architecture (Prelim design) update 0:30 In Progress Thomas Joseph 19/01/2026 05:25 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Mech. Design Feasibility-Enclosure cutouts plan 1:30 Resolved Thomas Joseph 19/01/2026 05:24 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Resmi K.V Documentation Task #2928: Testing of PLCIO Stacked boards with CTB platform TA Sheet 0:15 Resolved Resmi K.V 19/01/2026 05:23 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 2-Wheeler 19/01/2026 Sumanth D Design Task #2857: Detailed Design PCB Fab 1:00 Feedback Sumanth D 19/01/2026 04:12 AM Task 4 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 Yoganand D Testing Task #2930: Test PLCIO with CTB application Completed Testing 4:00 Resolved Yoganand D 19/01/2026 05:43 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 16/01/2026 Thomas Joseph Mechanical Assembly Task #2947: Mechanical Assembly Review of assembly issues and resolution 1:00 Resolved Thomas Joseph 16/01/2026 03:01 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 16/01/2026 Thomas Joseph redmine review/ update Task #3038: Project Planning and Review Review and Planning 0:30 In Progress Thomas Joseph 16/01/2026 03:00 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 16/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 0:45 In Progress Thomas Joseph 16/01/2026 02:58 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 Thomas Joseph Design Task #2984: Preliminary Design System Study and architecture Design 1:30 In Progress Thomas Joseph 16/01/2026 02:57 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 16/01/2026 Thomas Joseph Testing Task #2948: USB PCB Testing Assembly and test review and support 1:00 Resolved Thomas Joseph 16/01/2026 02:55 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 Thomas Joseph Testing Task #2930: Test PLCIO with CTB application Review of test results 0:45 Resolved Thomas Joseph 16/01/2026 02:52 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
CABS-VPX SBC 16/01/2026 Thomas Joseph Meeting Task #3160: Project Planning and Review Review Meeting. Action Plan 0:40 Analysis Started Thomas Joseph 16/01/2026 02:51 PM Task 3 30/04/2026 05/09/2025 100% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Status update and Plan revision 2:00 In Progress Thomas Joseph 16/01/2026 02:44 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 Resmi K.V Documentation Task #2928: Testing of PLCIO Stacked boards with CTB platform TR creation 2:00 Resolved Resmi K.V 16/01/2026 02:27 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 Resmi K.V Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Testing of PLC#01 and PLC#02 6:00 Resolved Resmi K.V 16/01/2026 02:26 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 16/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup Config packet list verification is in process. 1:00 In Progress Prakash M 16/01/2026 02:14 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 16/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup All Modbus parameters (real data type and alarm-based bit fields) have been added to the dashboard 4:00 In Progress Prakash M 16/01/2026 06:34 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 Thomas Joseph Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Review of test results 0:45 Resolved Thomas Joseph 14/01/2026 07:14 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 14/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review PCB Integration Issues/E54 Shortage mitigation 1:00 In Progress Thomas Joseph 14/01/2026 07:13 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 14/01/2026 Thomas Joseph Documentation Task #2966: Wiring Diagram Wiring diagram 1:00 In Progress Thomas Joseph 14/01/2026 07:11 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 Resmi K.V Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Testing of PLC#01 and PLC#02 6:00 Resolved Resmi K.V 14/01/2026 02:53 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 Yoganand D Testing Task #2930: Test PLCIO with CTB application Tested PLCIO 4:00 Resolved Yoganand D 14/01/2026 02:42 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 2:00 In Progress Thomas Joseph 14/01/2026 11:08 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 Resmi K.V Documentation Task #2928: Testing of PLCIO Stacked boards with CTB platform Document preparation 2:00 Resolved Resmi K.V 14/01/2026 08:17 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 Thomas Joseph Testing Task #2930: Test PLCIO with CTB application Status Review and Debug support for PLCIO 0:45 Resolved Thomas Joseph 14/01/2026 08:03 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Thomas Joseph Review document Task #2913: Test Plan Development and Approvals Test case doc. review 0:30 In Progress Thomas Joseph 14/01/2026 08:00 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals Test case Document 8:00 In Progress Jagatheswaran J 14/01/2026 07:19 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 14/01/2026 Thomas Joseph Design Task #3017: Design of Enclosure Graphics(Sticker/Screenprint) Discussion on issue/resolution 0:15 Resolved Thomas Joseph 14/01/2026 07:07 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Thomas Joseph Testing Task #2947: Mechanical Assembly Review of Assembly Issues 0:45 Resolved Thomas Joseph 14/01/2026 07:05 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Status meeting discussion on action items 0:30 In Progress Thomas Joseph 14/01/2026 07:04 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Dhanasekar T Mechanical Assembly Task #2947: Mechanical Assembly Mechanical assembly report 1:00 Resolved Dhanasekar T 14/01/2026 06:36 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 Resmi K.V O3 discussion Task #2928: Testing of PLCIO Stacked boards with CTB platform Status meeting with Thomas sir 0:30 Resolved Resmi K.V 14/01/2026 06:32 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 14/01/2026 Thomas Joseph Documentation Task #2956: Preliminary Design Prelim. Design Documentation 0:45 Resolved Thomas Joseph 14/01/2026 05:30 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 13/01/2026 Thomas Joseph redmine review/ update Task #3120: Project Planning and Review Project Planning 1:00 In Progress Thomas Joseph 15/01/2026 05:34 AM Task 3 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 13/01/2026 Surendra Naik PCB assembly Task #2946: USB PCB Assembly Usb pcb assembly 6:00 Resolved Surendra Naik 13/01/2026 05:03 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 13/01/2026 Thomas Joseph Testing Task #2940: Enclosure fabrication Sample enclosure cutout - quality checking 0:30 Resolved Thomas Joseph 13/01/2026 04:48 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 13/01/2026 Thomas Joseph redmine review/ update Task #3037: Project Planning and Review Plan revision 0:45 In Progress Thomas Joseph 13/01/2026 02:25 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 Thomas Joseph Development Task #2997: GW 2.0 PCB Assembly Support for X-Y data preparation for Panel 0:30 Resolved Thomas Joseph 13/01/2026 02:06 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 Thomas Joseph Documentation Task #2983: Product Requirements Core4 mDAQ Product Spec. Updation 0:20 Resolved Thomas Joseph 13/01/2026 02:04 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly 2 sets of board sent to uV for assembly 0:30 Resolved Dhanasekar T 13/01/2026 02:03 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 Dhanasekar T PCB assembly Task #3051: GW2.0 PCB Assembly 2 sets of board sent to uV for assembly 0:30 Closed Dhanasekar T 13/01/2026 01:29 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 13/01/2026 Dhanasekar T Procurement Task #3071: Enclosure Screen Printing Screen printing file sent to fabricator 0:30 Resolved Dhanasekar T 13/01/2026 01:26 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 13/01/2026 Dhanasekar T Procurement Task #2940: Enclosure fabrication Enclosure moved to saritvat (nexams) 1:00 Resolved Dhanasekar T 13/01/2026 01:25 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 13/01/2026 Dhanasekar T Procurement Task #2962: IO PCB Fabrication PCB received 0:30 Resolved Dhanasekar T 13/01/2026 01:22 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 13/01/2026 Dhanasekar T Procurement Task #3070: Enclosure Screen Printing Screen printing file sent to fabricator 1:00 Resolved Dhanasekar T 13/01/2026 01:18 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 13/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup A real (floating-point) data type Modbus parameter has been added to E-REMOS. 5:00 In Progress Prakash M 13/01/2026 12:47 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
TPMS 2-Wheeler 13/01/2026 Dhanasekar T Procurement Task #2858: Component Procurement Enquiry to stencil fabrication 1:00 Feedback Dhanasekar T 13/01/2026 07:50 AM Task 3 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Design Discussion 0:15 Resolved Thomas Joseph 13/01/2026 07:39 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 Thomas Joseph Meeting Task #2928: Testing of PLCIO Stacked boards with CTB platform Status meeting discussion on action items 0:45 Resolved Thomas Joseph 13/01/2026 07:39 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 13/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Team review meeting - Resource/Timeline 0:45 In Progress Thomas Joseph 13/01/2026 05:53 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 12/01/2026 Thomas Joseph Design Task #3069: Preliminary Design System Study and Design Plan 1:00 In Progress Thomas Joseph 13/01/2026 04:25 AM Task 3 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Thomas Joseph Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform PLCIO Debug Support 0:30 Resolved Thomas Joseph 13/01/2026 03:37 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Mechanical Design Plan 1:30 Resolved Thomas Joseph 13/01/2026 03:36 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Planning and Review 0:45 In Progress Thomas Joseph 13/01/2026 03:35 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 12/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Planning and Review 0:20 In Progress Thomas Joseph 13/01/2026 03:34 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 12/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Planning and Review 0:20 In Progress Thomas Joseph 13/01/2026 03:33 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 12/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 1:00 In Progress Thomas Joseph 13/01/2026 03:32 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 12/01/2026 Channamallikarjuna Mattihalli Development Task #2953: Modbus-TCP Modbus TCP reading data from Server i.e PLC we used software MODBUS SIM 8:00 In Progress Channamallikarjuna Mattihalli 12/01/2026 01:04 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 12/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals testcase document update 6:00 In Progress Jagatheswaran J 12/01/2026 11:37 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 12/01/2026 Dhanasekar T Documentation Task #3019: IO PCB BoM Updated 1:00 Resolved Dhanasekar T 12/01/2026 11:12 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Dhanasekar T PCB assembly Task #3051: GW2.0 PCB Assembly Components sent to uV for assembly 0:06 Closed Dhanasekar T 12/01/2026 10:13 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Dhanasekar T Procurement Task #3051: GW2.0 PCB Assembly Components sent to uV for assembly 0:30 Closed Dhanasekar T 12/01/2026 10:12 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Dhanasekar T Procurement Task #2996: GW 2.0 PCB Fabrication 5 sets of Panel PCB received 0:30 Resolved Dhanasekar T 12/01/2026 10:11 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 Sumanth D Testing Task #2930: Test PLCIO with CTB application Testing 3:00 Resolved Sumanth D 12/01/2026 04:45 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 12/01/2026 Channamallikarjuna Mattihalli Development Task #2953: Modbus-TCP Modbus TCP on SAME54 controller to read PLC data 8:00 In Progress Channamallikarjuna Mattihalli 12/01/2026 03:55 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 12/01/2026 Thomas Joseph Documentation Task #2957: Customer Requirements Finalisation customer requirement documentation 1:30 Resolved Thomas Joseph 11/01/2026 02:46 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 Thomas Joseph Design Task #2984: Preliminary Design Design planning 1:00 In Progress Thomas Joseph 10/01/2026 05:04 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 09/01/2026 Thomas Joseph Design Task #2966: Wiring Diagram Wiring diagram planning 1:00 In Progress Thomas Joseph 10/01/2026 05:03 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 09/01/2026 Thomas Joseph Design Task #2960: Wiring Diagram Wiring diagram planning 1:00 Resolved Thomas Joseph 10/01/2026 05:03 PM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 Thomas Joseph Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform PLCIO Debug Support 0:45 Resolved Thomas Joseph 10/01/2026 04:40 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Controller Pcb routing 16:00 In Progress Bhavani M 09/01/2026 02:06 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3062: Connector PCB Routing Rear side Connector 8:00 Resolved Bhavani M 09/01/2026 02:04 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3061: WiFi_4G PCB Routing WiFi_4G PCB Routing 8:00 In Progress Bhavani M 09/01/2026 02:01 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3061: WiFi_4G PCB Routing WiFi pcb Routing. 8:00 In Progress Bhavani M 09/01/2026 01:59 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Controller PCB Routing- SPI lan 8:00 In Progress Bhavani M 09/01/2026 01:43 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing On chip lan routing 8:00 In Progress Bhavani M 09/01/2026 01:39 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Routing- RS 485 and Rs-232 8:00 In Progress Bhavani M 09/01/2026 01:38 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Power section routing 8:00 In Progress Bhavani M 09/01/2026 01:37 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
Gateway V2.1 09/01/2026 Bhavani M Design Task #3064: Placement Review WiFi_4G PCB Placement Review WiFi_4G PCB 8:00 New Bhavani M 09/01/2026 01:26 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions