mDAQ4-1(Mid Range mDAQ)-Pilot 03/02/2026 Dhilip Kumar R Testing Task #3052: Test Setup Test Setup of 100mA,200mA,500mA. 1:00 Resolved Dhilip Kumar R 03/02/2026 02:01 PM Task 6 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 02/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 10:00 In Progress Thomas Joseph 05/02/2026 08:10 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 02/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testing 8:00 Analysis Started Jagatheswaran J 03/02/2026 06:21 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 01/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 8:00 Analysis Started Jagatheswaran J 02/02/2026 07:45 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 30/01/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 12:00 In Progress Thomas Joseph 05/02/2026 08:11 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 30/01/2026 Dhilip Kumar R Testing Task #2975: IO PCB Electrical Testing IO PCB testing with AI and DI after software update. 1:00 Resolved Dhilip Kumar R 30/01/2026 02:03 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 30/01/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J 30/01/2026 01:32 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 30/01/2026 Resmi K.V Design Task #2850: Detailed Design Layout updation 7:00 In Progress Resmi K.V 30/01/2026 10:36 AM Task 5 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 30/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Fabrication done 0:06 Resolved Dhanasekar T 30/01/2026 10:27 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 30/01/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing GW2.0 PCB Testing 8:00 In Progress Bhavani M 30/01/2026 05:35 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 29/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Fabricator made cutout wrongly 0:06 Resolved Dhanasekar T 29/01/2026 02:04 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 29/01/2026 Resmi K.V Design Task #2850: Detailed Design PCB updation 8:00 In Progress Resmi K.V 29/01/2026 01:50 PM Task 5 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mTracker(Mid Range GW)-Pilot 29/01/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J 29/01/2026 01:08 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 29/01/2026 Thomas Joseph Documentation Task #2958: Product Requirements Product Spec. document update 0:30 Resolved Thomas Joseph 29/01/2026 05:24 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 Thomas Joseph Development Task #3039: Project Planning and Review Status meeting discussion on action items(VM) 1:30 In Progress Thomas Joseph 28/01/2026 02:40 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:30 In Progress Thomas Joseph 28/01/2026 02:39 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 28/01/2026 Thomas Joseph Development Task #2850: Detailed Design PCB Design Review 2:15 In Progress Thomas Joseph 28/01/2026 02:37 PM Task 5 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Tomorrow It will complete 0:30 Resolved Dhanasekar T 28/01/2026 02:02 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 28/01/2026 Dhanasekar T Procurement Task #2942: Procurement Done 0:06 Resolved Dhanasekar T 28/01/2026 06:34 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Done 0:06 Resolved Dhanasekar T 28/01/2026 06:30 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 28/01/2026 Dhanasekar T Dispatch Task #2916: Proto 1 Delivery to Chola Device Delivered to customer 0:06 Resolved Dhanasekar T 28/01/2026 06:29 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 Sumanth D Mechanical Assembly Task #3158: D-Sub 25 Cable Preparation cable preparation 3:00 Resolved Sumanth D 28/01/2026 04:38 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 27/01/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB testing 8:00 In Progress Bhavani M 27/01/2026 02:57 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 27/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement Discussion on plan & review 1:30 In Progress Thomas Joseph 27/01/2026 12:29 PM Task 5 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 27/01/2026 Thomas Joseph Development Task #3120: Project Planning and Review Discussion on plan & review 0:30 In Progress Thomas Joseph 27/01/2026 07:10 AM Task 5 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 27/01/2026 Thomas Joseph Development Task #3037: Project Planning and Review review 0:15 In Progress Thomas Joseph 27/01/2026 07:09 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 27/01/2026 Thomas Joseph Development Task #3038: Project Planning and Review Discussion on plan & review 0:45 In Progress Thomas Joseph 27/01/2026 07:08 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 27/01/2026 Thomas Joseph Development Task #3039: Project Planning and Review Discussion on plan & review 0:45 In Progress Thomas Joseph 27/01/2026 07:08 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Assembled board received 0:06 Resolved Dhanasekar T 23/01/2026 03:10 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 23/01/2026 Dhilip Kumar R Testing Task #2977: DI Performance Testing Testing of DI with IO PCB. 1:00 Resolved Dhilip Kumar R 23/01/2026 02:18 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 23/01/2026 Dhilip Kumar R Testing Task #2976: AI Performance Testing Testing of AI with IO PCB. 1:00 Resolved Dhilip Kumar R 23/01/2026 02:02 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 23/01/2026 Dhilip Kumar R Testing Task #2975: IO PCB Electrical Testing Complete test setup of electrical testing is done. 1:00 Resolved Dhilip Kumar R 23/01/2026 01:57 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 23/01/2026 Bhavani M Design Task #3163: Schematic Design schematic update 4:00 In Progress Bhavani M 23/01/2026 01:54 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals Test case Document update 8:00 In Progress Jagatheswaran J 23/01/2026 12:31 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 23/01/2026 DEVI PRIYAA Development Task #3030: AI Module AI module tested with the setup 2:00 Resolved DEVI PRIYAA 23/01/2026 06:44 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 23/01/2026 Dhilip Kumar R Testing Task #2975: IO PCB Electrical Testing Testing setup of AI and DI. 1:00 Resolved Dhilip Kumar R 23/01/2026 06:42 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 23/01/2026 DEVI PRIYAA Development Task #3029: DI Module DI testing done with the setup 2:00 Resolved DEVI PRIYAA 23/01/2026 06:35 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Assembly is completed 0:06 Resolved Dhanasekar T 23/01/2026 05:46 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 DEVI PRIYAA Development Task #3033: AI Module AI module code integrated 3:00 Resolved DEVI PRIYAA 23/01/2026 05:27 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 22/01/2026 Thomas Joseph Design Task #3189: Design and Development of PLCIO PCB Study - Mechanical , Schematic, Layout plan 3:30 In Progress Thomas Joseph 22/01/2026 06:06 PM Task 4 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 22/01/2026 Bhavani M Design Task #3164: PCB Design N58 footprint created 4:00 In Progress Bhavani M 22/01/2026 03:34 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 22/01/2026 VenuMadhav S Design Task #3163: Schematic Design RS-485 schematic design added 4:00 In Progress VenuMadhav S 22/01/2026 03:31 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 22/01/2026 DEVI PRIYAA Development Task #3030: AI Module I2C Communication working fine. 4:00 Resolved DEVI PRIYAA 22/01/2026 02:28 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 22/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement BoM Analysis 1:00 In Progress Thomas Joseph 22/01/2026 01:59 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 22/01/2026 Dhanasekar T Documentation Task #2970: Parts List(Mech. Assembly) Done 0:06 Resolved Dhanasekar T 22/01/2026 01:19 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 22/01/2026 Dhanasekar T Documentation Task #2955: Parts List(Mech. Assembly) Done 0:30 Resolved Dhanasekar T 22/01/2026 01:07 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 22/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup Data posting -side development is in process(linux platform) 8:00 In Progress Prakash M 22/01/2026 01:04 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Pilot 22/01/2026 Surendra Naik Mechanical Assembly Task #2973: Mechanical Assembly led pcb asembly & Mechanical assembly and integrate 4:00 Resolved Surendra Naik 22/01/2026 12:56 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals testcase document 4:00 In Progress Jagatheswaran J 22/01/2026 12:55 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 22/01/2026 Surendra Naik Mechanical Assembly Task #2973: Mechanical Assembly usb pcb asembly & Mechanical assembly and integrate 4:00 Resolved Surendra Naik 22/01/2026 12:53 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 4 Wheeler 22/01/2026 Resmi K.V Design Task #2893: Detailed Design DXF creation 2:00 In Progress Resmi K.V 22/01/2026 11:31 AM Task 4 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
TPMS 4 Wheeler 22/01/2026 Thomas Joseph Design Task #2897: PCB Design Review PCB Design Review 1:00 In Progress Thomas Joseph 22/01/2026 11:27 AM Task 4 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
Customer RMA, AMC & SERVICE 22/01/2026 Dhanasekar T Testing Task #3180: PREFECT EIDOS - 3 Units Kindly update 0:06 Testing started Dhanasekar T 22/01/2026 11:22 AM Task 4 31/12/2026 21/01/2026 10% 1 Actions
Customer RMA, AMC & SERVICE 22/01/2026 Dhanasekar T Testing Task #3180: PREFECT EIDOS - 3 Units Please update 0:06 Testing started Dhanasekar T 22/01/2026 11:19 AM Task 4 31/12/2026 21/01/2026 10% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 Thomas Joseph Design Task #3179: Design of Enclosure Graphics(Sticker/Screenprint) review 1:00 Resolved Thomas Joseph 22/01/2026 10:47 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 DEVI PRIYAA Development Task #3034: DI Module DI module code integrated 2:00 Resolved DEVI PRIYAA 22/01/2026 09:51 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 22/01/2026 Dhanasekar T Procurement Task #2870: Component Procurement Done 0:06 Analysis Started Dhanasekar T 22/01/2026 09:36 AM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 Dhanasekar T Documentation Task #2999: Parts List(Mech. Assembly) Document review 1:00 In Progress Dhanasekar T 22/01/2026 07:42 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 22/01/2026 Resmi K.V Review document Task #2850: Detailed Design Review of PCB design 4:00 In Progress Resmi K.V 22/01/2026 07:32 AM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Status 0:06 Resolved Dhanasekar T 22/01/2026 05:46 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 21/01/2026 Thomas Joseph Design Task #3120: Project Planning and Review Design planning 2:00 In Progress Thomas Joseph 21/01/2026 05:58 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 21/01/2026 Thomas Joseph redmine review/ update Task #3038: Project Planning and Review Planning and Review 1:00 In Progress Thomas Joseph 21/01/2026 05:53 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts review 0:30 Resolved Thomas Joseph 21/01/2026 05:52 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Thomas Joseph Design Task #3179: Design of Enclosure Graphics(Sticker/Screenprint) review 0:30 Resolved Thomas Joseph 21/01/2026 05:51 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph 21/01/2026 05:51 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:30 In Progress Thomas Joseph 21/01/2026 05:07 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 4 Wheeler 21/01/2026 Dhanasekar T Procurement Task #2894: Component Procurement BoM components received 0:06 In Progress Dhanasekar T 21/01/2026 03:53 PM Task 4 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
TPMS 2-Wheeler 21/01/2026 Dhanasekar T Procurement Task #2858: Component Procurement Stencil payment done yet to receive 0:06 Feedback Dhanasekar T 21/01/2026 03:52 PM Task 4 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Dhanasekar T Procurement Task #3178: Enclosure Procurement Done 0:06 Resolved Dhanasekar T 21/01/2026 03:51 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Enclosure moved to fabricator 0:30 Resolved Dhanasekar T 21/01/2026 03:29 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 21/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup Config packet verification is in process on device side. 7:00 In Progress Prakash M 21/01/2026 01:15 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
SAMA5D4 Hardware Development 21/01/2026 Resmi K.V Design Task #2850: Detailed Design layout and schematic updation 6:00 In Progress Resmi K.V 21/01/2026 12:55 PM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Dhanasekar T Procurement Task #3178: Enclosure Procurement Done 0:06 Resolved Dhanasekar T 21/01/2026 11:43 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Sumanth D Mechanical Assembly Task #3158: D-Sub 25 Cable Preparation Cabeling 3:00 Resolved Sumanth D 21/01/2026 11:36 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 21/01/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals Test case Document update 8:00 In Progress Jagatheswaran J 21/01/2026 10:19 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
SAMA5D4 Hardware Development 21/01/2026 Resmi K.V Design Task #2850: Detailed Design Schematic updation 2:00 In Progress Resmi K.V 21/01/2026 08:45 AM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Sumanth D Documentation Task #3162: Programming Model Update Program. model 0:30 Resolved Sumanth D 21/01/2026 07:35 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 2-Wheeler 21/01/2026 Dhilip Kumar R PCB assembly Task #2859: PCB Assembly TPMS 2- Wheeler BOM Kitting. 1:00 Feedback Dhilip Kumar R 21/01/2026 07:33 AM Task 4 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Dhilip Kumar R Mechanical Assembly Task #3156: Hardware Setup readiness for software development Hardware Test setup for Interface GW2.0 with PLCIO. 1:00 Resolved Dhilip Kumar R 21/01/2026 07:28 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Customer RMA, AMC & SERVICE 21/01/2026 Jagatheswaran J Testing Task #3181: OCCK-019 unit update Eidos testing 2:00 In Progress Jagatheswaran J 21/01/2026 06:47 AM Task 4 31/12/2026 21/01/2026 10% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 Dhanasekar T Procurement Task #3178: Enclosure Procurement PI received and payment also done 0:30 Resolved Dhanasekar T 21/01/2026 06:39 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 21/01/2026 Dhilip Kumar R PCB assembly Task #2975: IO PCB Electrical Testing IO PCB assembly 1:00 Resolved Dhilip Kumar R 21/01/2026 05:55 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 21/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement Review 0:30 In Progress Thomas Joseph 21/01/2026 05:40 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 20/01/2026 Thomas Joseph redmine review/ update Task #3037: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph 20/01/2026 04:00 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 20/01/2026 Bhavani M Design Task #3163: Schematic Design N58 Circuit added 5:00 In Progress Bhavani M 20/01/2026 02:22 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
SAMA5D4 Hardware Development 20/01/2026 Resmi K.V Design Task #2850: Detailed Design PCB design completed 8:00 In Progress Resmi K.V 20/01/2026 01:51 PM Task 4 31/03/2026 01/06/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mTracker(Mid Range GW)-Pilot 20/01/2026 Jagatheswaran J Documentation Task #3041: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J 20/01/2026 01:09 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 20/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J 20/01/2026 01:04 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 Sumanth D Documentation Task #3158: D-Sub 25 Cable Preparation Wiring diagram 5:00 Resolved Sumanth D 20/01/2026 11:26 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 20/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement Discussion on merging issue/resolution 0:30 In Progress Thomas Joseph 20/01/2026 11:23 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 20/01/2026 Dhanasekar T Mechanical Assembly Task #2973: Mechanical Assembly LED PCB assembly and integrate with enclosure 0:06 Resolved Dhanasekar T 20/01/2026 09:20 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 20/01/2026 Dhanasekar T Procurement Task #2938: Enclosure fabrication Document updated 0:30 Resolved Dhanasekar T 20/01/2026 09:05 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 20/01/2026 Dhanasekar T PCB assembly Task #3125: GW BoM Component Procurement PCB assembly 0:06 In Progress Dhanasekar T 20/01/2026 08:50 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 20/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup The Modbus parameter names were corrected after updating the placeholders(limits) on the UI. 3:00 In Progress Prakash M 20/01/2026 08:24 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 20/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement BoM Analysis 0:45 In Progress Thomas Joseph 20/01/2026 08:14 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Enclosure design review 0:40 Resolved Thomas Joseph 20/01/2026 07:24 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 Surendra Naik cable assembly Task #3158: D-Sub 25 Cable Preparation d -sub 25 connector wiring 4:00 Resolved Surendra Naik 20/01/2026 06:17 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 Surendra Naik cable assembly Task #3159: PLCIO Interface Cable plcio cable preparation 4:00 Resolved Surendra Naik 20/01/2026 05:45 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts review of enclosure design 1:30 Resolved Thomas Joseph 20/01/2026 04:02 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 19/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement BoM Analysis 2:00 In Progress Thomas Joseph 20/01/2026 03:12 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions