Project

General

Profile

Active 2025-26 Projects

Active 2025-26 Projects

Apply Clear

Name Project_Lead Team_Size Engr, %effort Start Date Finish Date Description
21/03/2026 1 Collapse all/Expand all
Gateway 3.0 Venumadhav 3 Venumadhav 50%, Bhavani 50%, 25/02/2026 21/03/2026

Design and Development of N58 Open CPU platform
N58 as controller. Features - 4G, GPS, RS232, RS485

31/03/2026 8 Collapse all/Expand all
Chola Turbo Machinery Pvt Ltd Venu Madhav 4 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 24/12/2025 31/03/2026

Lead : Venu M

mDAQ4-1(Mid Range mDAQ)-Production Thomas Joseph 3 Thomas(40%), Venumadhav(100%),Dhilip(20%) 02/01/2026 31/03/2026

Design and Development of Data Acquisition Unit based on E54 platform to meet the requirements of RTU in Water Supply System for Core4Energy - Production

mTracker(Mid Range GW)-Production Thomas Joseph 3 Thomas(30%), Venumadhav(100%),Dhilip(20%) 02/01/2026 31/03/2026

Design and Development of mTracker based on E54 platform to meet the requirements of Water Supply System for Core4Energy - Production

Gateway V2 Venu, Malli 2 Channa 100%, VenuM 30%, Greeshma 30%, Gowri 20%, Bhavani 50% 18/06/2025 31/03/2026

Lead: Venu M, Mallikarjun

Gateway V2.1 Venu M 1 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 14/08/2025 31/03/2026

Lead Venu M

SAMA5D4 Hardware Development Sumanth 1 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 01/06/2025 31/03/2026

Lead: Sumanth

TPMS 2-Wheeler Sumanth 1 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 15/10/2025 31/03/2026

Lead: Sumanth

TPMS 4 Wheeler Sumanth 1 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 15/10/2025 31/03/2026

Lead: Sumanth

30/04/2026 5 Collapse all/Expand all
CABS-VPX SBC Thomas Joseph 1 100% 05/09/2025 30/04/2026
Core4 Thomas 2 Thomas 30%, VenuM 50%, Resmi 50% 31/12/2025 30/04/2026

Lead: Thomas

mDAQ4-1(Mid Range mDAQ)-Pilot Thomas Joseph 3 Thomas(20%), Venumadhav(100%),Dhilip(20%) 02/01/2026 30/04/2026

Design and Development of Data Acquisition Unit based on E54 platform to meet the requirements of RTU in Water Supply System for Core4Energy

Project folder: https://elpisit-my.sharepoint.com/personal/satish_sl_elpisitsolutions_com/Documents/Elpis%20Projects%20Folder/Core4%20Energy/RTU...

mTracker(Mid Range GW)-Pilot Thomas Joseph 3 Thomas(20%), Venumadhav(100%),Dhilip(20%) 02/01/2026 30/04/2026

Design and Development of mTracker based on E54 platform to meet the requirements of Water Supply System for Core4Energy

USB Config Tool 2.0 - Common Mohan K 3 Mohan, Rajenda, Gowri, YogeshGowda, Girishma, DeviPriyaa 01/02/2026 30/04/2026

USB Config Tool 2.0 - Common

31/12/2026 1 Collapse all/Expand all
Customer RMA, AMC & SERVICE Dhanasekar 1 10% 21/01/2026 31/12/2026

Track all repairs-post Delivery

    (1-15/15)