Hours: 1283:53

Project Date User Activity Issue Comment Hours Status Author Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Milestone Reference Critical Path Severity
TPMS 4 Wheeler 10/03/2026 Resmi K.V Design Task #2893: Detailed Design PCB design 3:00 In Progress Resmi K.V 10/03/2026 12:32 PM Task 11 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
Gateway 3.0 06/03/2026 Gowri G Development Task #3336: Phase 0A Developement of the mtracker v2p1 RS485 and rs232 with wifi and Developement of Tracker V3 RS485 and RS232 with 4G 8:00 Analysis Started Gowri G 11/03/2026 06:53 AM Gateway 3.0 - KT Task 10 21/03/2026 25/02/2026 Venumadhav 50%, Bhavani 50%, 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 05/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V 05/03/2026 12:37 PM Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 04/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 8:00 Analysis Started Jagatheswaran J 06/03/2026 07:18 AM Task 10 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Production 03/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 6:00 In Progress Resmi K.V 03/03/2026 11:19 AM Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 02/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V 02/03/2026 01:21 PM Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
Gateway 3.0 02/03/2026 Surendra Naik PCB assembly Task #3337: TV2.1 Hardware Readiness rs232 module placement 2:00 Resolved Surendra Naik 02/03/2026 12:03 PM Task 10 21/03/2026 25/02/2026 Venumadhav 50%, Bhavani 50%, 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 27/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V 27/02/2026 01:56 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 27/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB testing 8:00 In Progress Bhavani M 27/02/2026 07:13 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Gateway 3.0 27/02/2026 Dhanasekar T Procurement Task #3313: N58 Open CPU EVK Quotation received and PR created 0:30 In Progress Dhanasekar T 27/02/2026 06:02 AM Task 9 21/03/2026 25/02/2026 Venumadhav 50%, Bhavani 50%, 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 26/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V 26/02/2026 02:14 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 26/02/2026 Surendra Naik cable assembly Task #3261: RTU Cable for DI, DO, AI cable assembly for RTU 8:00 In Progress Surendra Naik 26/02/2026 12:24 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 25/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 6:00 In Progress Resmi K.V 25/02/2026 11:57 AM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 Sumanth D Testing Task #3035: DO Module DO testing 1:00 Resolved Sumanth D 25/02/2026 11:55 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 Sumanth D Testing Task #3033: AI Module AI testing 1:00 Resolved Sumanth D 25/02/2026 11:53 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 1:00 Resolved Sumanth D 25/02/2026 06:01 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 1:00 Resolved Sumanth D 25/02/2026 05:59 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 24/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 7:00 In Progress Resmi K.V 24/02/2026 02:15 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 24/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 8:00 Resolved Sumanth D 24/02/2026 02:04 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 24/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testing 4:00 In Progress Jagatheswaran J 24/02/2026 12:57 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 24/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 4:00 Analysis Started Jagatheswaran J 24/02/2026 12:38 PM Task 9 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mDAQ4-1(Mid Range mDAQ)-Production 23/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 In Progress Resmi K.V 23/02/2026 01:38 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 20/02/2026 Thomas Joseph Development Task #3248: PCB Design Design review and Support (RKV) 2:00 In Progress Thomas Joseph 20/02/2026 04:05 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Thomas Joseph Development Task #3039: Project Planning and Review Planning and Review(Discussion with Bhavani) 1:00 In Progress Thomas Joseph 20/02/2026 04:03 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Thomas Joseph Development Task #3034: DI Module Discussion on plan & review 0:30 Resolved Thomas Joseph 20/02/2026 04:01 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB Testing 8:00 In Progress Bhavani M 20/02/2026 02:18 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing Visual Inspection 4:00 In Progress Bhavani M 20/02/2026 02:11 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 20/02/2026 Bhavani M Design Task #3248: PCB Design Ref des sorting 1:00 In Progress Bhavani M 20/02/2026 01:55 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Sumanth D Testing Task #3033: AI Module test report 1:00 Resolved Sumanth D 20/02/2026 09:06 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Sumanth D Testing Task #3034: DI Module testing 5:00 Resolved Sumanth D 20/02/2026 06:56 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 Sumanth D Testing Task #3033: AI Module testing 3:00 Resolved Sumanth D 20/02/2026 06:53 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 19/02/2026 Thomas Joseph Development Task #3033: AI Module Result Analysis 1:00 Resolved Thomas Joseph 20/02/2026 04:00 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 Thomas Joseph Design Task #3191: PCB Design Design review and Support (RKV) 4:00 In Progress Thomas Joseph 19/02/2026 03:31 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 In Progress Resmi K.V 19/02/2026 02:27 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 19/02/2026 Surendra Naik PCB assembly Task #2979: Hardware Readiness GW mcu board testing & rework 4:00 In Progress Surendra Naik 19/02/2026 08:03 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 18/02/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Critical Project Update call 1:10 In Progress Thomas Joseph 19/02/2026 03:40 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 18/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 In Progress Resmi K.V 18/02/2026 01:51 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 18/02/2026 Surendra Naik cable assembly Task #3159: PLCIO Interface Cable PLCIO Interface Cable 2:00 Resolved Surendra Naik 18/02/2026 12:07 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 17/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure debuggibng the code 8:00 In Progress Gowri G 23/02/2026 06:43 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 17/02/2026 Thomas Joseph Design Task #3191: PCB Design Design review and Support (RKV) 5:00 In Progress Thomas Joseph 19/02/2026 03:49 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 17/02/2026 Thomas Joseph Bug fixes Bug #3260: GW2.0 boards issue Board Issues Troubleshooting 2:00 Resolved Thomas Joseph 19/02/2026 03:42 PM Bug 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
mDAQ4-1(Mid Range mDAQ)-Production 17/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V 17/02/2026 02:25 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 17/02/2026 DEVI PRIYAA Testing Task #3254: Modbus RTU Multiple slave id's is working 6:00 Resolved DEVI PRIYAA 17/02/2026 11:16 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 16/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure Debugging the code for the sd not inialized properly 8:00 In Progress Gowri G 23/02/2026 06:38 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 Resmi K.V Design Task #3191: PCB Design Assigning footprint and component placement. 8:00 In Progress Resmi K.V 17/02/2026 02:26 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 16/02/2026 Thomas Joseph Testing Fix Bug #3260: GW2.0 boards issue Analysis and troubleshoot plan 0:45 Resolved Thomas Joseph 16/02/2026 06:35 PM Bug 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
mTracker(Mid Range GW)-Production 16/02/2026 Thomas Joseph Design Task #3164: PCB Design review 1:00 In Progress Thomas Joseph 16/02/2026 06:31 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 Thomas Joseph O3 discussion Task #3222: Project Planning and Review Status meeting discussion on action items (VM) 0:30 In Progress Thomas Joseph 16/02/2026 06:30 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 Thomas Joseph Design Task #3191: PCB Design Design of PLCIO PCB 6:00 In Progress Thomas Joseph 16/02/2026 06:28 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 Jagatheswaran J Testing Task #3223: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J 16/02/2026 12:10 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 16/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Enquiry BoM costing quotation 0:30 In Progress Dhanasekar T 16/02/2026 06:59 AM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Customer RMA, AMC & SERVICE 16/02/2026 Dhanasekar T Testing Task #3180: PREFECT EIDOS - 3 Units OCCK 1 unit testing completed 0:06 Testing started Dhanasekar T 16/02/2026 06:56 AM Task 8 31/12/2026 21/01/2026 10% 1 Actions
mTracker(Mid Range GW)-Pilot 16/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure Done with the read and write of SD card- Data was stored in the SD card 16:00 In Progress Gowri G 16/02/2026 05:05 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 14/02/2026 Thomas Joseph Bug fixes Bug #3259: Atmel ICE Debugger not detecting Atmel ICE Debugger troubleshooting 7:30 Resolved Thomas Joseph 14/02/2026 04:06 PM Bug 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
mTracker(Mid Range GW)-Production 14/02/2026 Bhavani M Design Task #3248: PCB Design connector PCB routing 6:00 In Progress Bhavani M 14/02/2026 01:29 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 13/02/2026 Bhavani M Design Task #3248: PCB Design PCB Routing 4:00 In Progress Bhavani M 13/02/2026 02:13 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 13/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J 13/02/2026 12:59 PM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Customer RMA, AMC & SERVICE 12/02/2026 Dhanasekar T Procurement Task #3180: PREFECT EIDOS - 3 Units payment initiate 2:00 Testing started Dhanasekar T 17/02/2026 06:39 AM Task 7 31/12/2026 21/01/2026 10% 1 Actions
mTracker(Mid Range GW)-Production 12/02/2026 Bhavani M Design Task #3247: Schematic Design Schematic Design 2:00 In Progress Bhavani M 12/02/2026 01:25 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 11/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement BoM verification and costing preparation 4:00 In Progress Dhanasekar T 17/02/2026 06:37 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Pilot 11/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J 13/02/2026 06:43 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 11/02/2026 Resmi K.V Design Task #3164: PCB Design PCB design 8:00 In Progress Resmi K.V 11/02/2026 02:21 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 11/02/2026 Thomas Joseph Meeting Task #3222: Project Planning and Review Discussion on Resource Allocation ( SV, VK, TJ) 2:00 In Progress Thomas Joseph 11/02/2026 02:10 PM Task 7 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:10 In Progress Thomas Joseph 11/02/2026 10:30 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 Thomas Joseph Development Task #2982: Customer Requirements Finalisation requirement analysis 0:30 In Progress Thomas Joseph 11/02/2026 04:00 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 10/02/2026 Thomas Joseph Support Task #3239: Installation Support TIA Software Uninstallation 0:30 In Progress Thomas Joseph 11/02/2026 04:15 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
TPMS 2-Wheeler 10/02/2026 Thomas Joseph Meeting Task #2860: Board Bring up Reset Issue discussion (VK) 0:15 In Progress Thomas Joseph 11/02/2026 04:11 AM Task 7 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mTracker(Mid Range GW)-Production 10/02/2026 Thomas Joseph Development Task #3154: Design and Development of Controller+4G(N58) PCB Design review and Support (RKV) 2:00 In Progress Thomas Joseph 11/02/2026 04:06 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 10/02/2026 Thomas Joseph Meeting Task #2983: Product Requirements Customer meeting 0:30 Resolved Thomas Joseph 11/02/2026 04:04 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 10/02/2026 Thomas Joseph Meeting Task #3222: Project Planning and Review production plan review - PCB design (VK, SV, RKV, DT) 0:45 In Progress Thomas Joseph 11/02/2026 04:04 AM Task 7 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 10/02/2026 Resmi K.V Documentation Task #3246: Interface PCB BoM BoM creation 1:00 Resolved Resmi K.V 10/02/2026 10:30 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 10/02/2026 Resmi K.V Documentation Task #3247: Schematic Design Schematic PDF creation 0:30 In Progress Resmi K.V 10/02/2026 10:29 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 10/02/2026 Thomas Joseph redmine review/ update Task #3120: Project Planning and Review Planning and Review 1:00 In Progress Thomas Joseph 10/02/2026 09:56 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 10/02/2026 Resmi K.V Documentation Task #3126: Controller PCB BoM BoM creation 1:00 Resolved Resmi K.V 10/02/2026 09:14 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 4 Wheeler 10/02/2026 Resmi K.V Design Task #2893: Detailed Design PCB updation 4:00 In Progress Resmi K.V 10/02/2026 08:41 AM Task 7 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 10/02/2026 DEVI PRIYAA Development Task #3244: E-REMOS Configuration for mDAQ Functional Testing Configured the dashboard as per the requirement. 2:00 In Progress DEVI PRIYAA 10/02/2026 07:59 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 10/02/2026 Thomas Joseph Development Task #2915: EREMOS Development Data update 0:30 In Progress Thomas Joseph 10/02/2026 05:39 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 09/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testcase document update 8:00 Analysis Started Jagatheswaran J 10/02/2026 10:11 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 09/02/2026 Thomas Joseph Support Task #3239: Installation Support TIA Installation 3:00 In Progress Thomas Joseph 09/02/2026 05:11 PM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 09/02/2026 Resmi K.V Design Task #3164: PCB Design PCB design 7:00 In Progress Resmi K.V 09/02/2026 01:55 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 09/02/2026 Thomas Joseph Meeting Task #3164: PCB Design Team review meeting 1:00 In Progress Thomas Joseph 09/02/2026 08:36 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 09/02/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:00 In Progress Thomas Joseph 09/02/2026 08:34 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 09/02/2026 Thomas Joseph Development Task #3243: ConfigPacket (Split, Delay) Discussion on plan & review 0:30 In Progress Thomas Joseph 09/02/2026 08:32 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 09/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation Report Generation 1:00 In Progress Thomas Joseph 09/02/2026 08:32 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
Chola Turbo Machinery Pvt Ltd 07/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 8:00 In Progress Thomas Joseph 08/02/2026 08:11 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 06/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement PCB power enquiry for assembly regarding 1:00 In Progress Dhanasekar T 11/02/2026 06:21 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 06/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 10:00 In Progress Thomas Joseph 08/02/2026 08:11 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 05/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Wurth electronics connectors enquiry 2:00 In Progress Dhanasekar T 11/02/2026 06:20 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
Chola Turbo Machinery Pvt Ltd 05/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testing 6:00 Analysis Started Jagatheswaran J 05/02/2026 12:48 PM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
TPMS 4 Wheeler 05/02/2026 Resmi K.V Design Task #2893: Detailed Design Updating PCB design 6:00 In Progress Resmi K.V 05/02/2026 10:24 AM Task 6 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
mTracker(Mid Range GW)-Production 05/02/2026 Bhavani M Design Task #3164: PCB Design Placement components in microcontroller Pcb 8:00 In Progress Bhavani M 05/02/2026 07:29 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 2-Wheeler 05/02/2026 Dhanasekar T PCB assembly Task #2859: PCB Assembly 6 nos PCB assembly completed 0:30 Feedback Dhanasekar T 05/02/2026 06:07 AM Task 6 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
Chola Turbo Machinery Pvt Ltd 05/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testing 4:00 Analysis Started Jagatheswaran J 05/02/2026 05:44 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
mTracker(Mid Range GW)-Production 04/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement 3 sets of board shortage components order 1:00 In Progress Dhanasekar T 11/02/2026 06:19 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mTracker(Mid Range GW)-Production 04/02/2026 Dhanasekar T PCB assembly Task #3125: GW BoM Component Procurement 3 sets of board kitting and quote initiate,PR creation 6:00 In Progress Dhanasekar T 11/02/2026 06:18 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Pilot 04/02/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J 05/02/2026 05:45 AM Task 6 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
mDAQ4-1(Mid Range mDAQ)-Production 04/02/2026 Dhanasekar T Procurement Task #3220: PLCIO BoM Component Procurement N58 received 0:06 In Progress Dhanasekar T 04/02/2026 02:25 PM Task 6 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
TPMS 2-Wheeler 04/02/2026 Sumanth D Testing Task #2860: Board Bring up testing 3:00 In Progress Sumanth D 04/02/2026 07:12 AM Task 6 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
TPMS 4 Wheeler 03/02/2026 Dhanasekar T Procurement Task #2894: Component Procurement Coin cell batteries procurement initiate 1:00 In Progress Dhanasekar T 11/02/2026 06:13 AM Task 6 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
TPMS 4 Wheeler 03/02/2026 Dhanasekar T PCB assembly Task #2894: Component Procurement PCB assembly quote initate 3:00 In Progress Dhanasekar T 11/02/2026 06:12 AM Task 6 31/03/2026 15/10/2025 Sumanth 30% Resmi 30%, Bhavani 10%, Dhansekar 20%, Surendra 20% 1 Actions
(1-100/402)