Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 1849:02

Date User Activity Issue Comment Hours Status Author Project Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Severity
10/08/2026 Jiban Munda Testing Task #3410: Envelop Analysis Added Envelope Analysis 32:00 Closed Jiban Munda VAS Product Release 2.0 10/08/2026 07:04 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 33 19/03/2026 01/12/2025 Mohan 100% 1 Actions
10/08/2026 Jiban Munda Testing Task #3412: GMF and Sidebands Added GMF Analysis 32:00 Resolved Jiban Munda VAS Product Release 2.0 10/08/2026 07:02 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 33 19/03/2026 01/12/2025 Mohan 100% 1 Actions
06/08/2026 Thomas Joseph Design Task #3749: rpm capture Design and meeting 1:30 In Progress Thomas Joseph VAS Product Release 2.0 06/08/2026 07:00 PM VAS Product Release 2.0 - Future Task 32 19/03/2026 01/12/2025 Mohan 100% 1 Actions
20/07/2026 Thomas Joseph Development Task #3524: Delivery and Installation Installation Report Review 2:00 In Progress Thomas Joseph VAS Product Release 2.0 02/08/2026 05:32 PM VAS Product Release 2.0 - BSH Task 30 19/03/2026 01/12/2025 Mohan 100% 1 Actions
20/07/2026 Thomas Joseph Development Task #3741: Post Installation Service Project Completion Report 4:00 In Progress Thomas Joseph VAS Product Release 2.0 02/08/2026 05:30 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 30 19/03/2026 01/12/2025 Mohan 100% 1 Actions
17/07/2026 Thomas Joseph Meeting Task #3524: Delivery and Installation Installation and Demo - Online support 5:00 In Progress Thomas Joseph VAS Product Release 2.0 02/08/2026 05:25 PM VAS Product Release 2.0 - BSH Task 29 19/03/2026 01/12/2025 Mohan 100% 1 Actions
16/07/2026 Thomas Joseph SW Release Task #3741: Post Installation Service Onsite Visit 9:00 In Progress Thomas Joseph VAS Product Release 2.0 02/08/2026 05:21 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 29 19/03/2026 01/12/2025 Mohan 100% 1 Actions
15/07/2026 Thomas Joseph Development Task #3412: GMF and Sidebands Review (with VK) 1:30 Resolved Thomas Joseph VAS Product Release 2.0 15/07/2026 12:15 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 29 19/03/2026 01/12/2025 Mohan 100% 1 Actions
15/07/2026 Thomas Joseph Development Task #3412: GMF and Sidebands GMF Calculation 1:00 Resolved Thomas Joseph VAS Product Release 2.0 15/07/2026 05:11 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 29 19/03/2026 01/12/2025 Mohan 100% 1 Actions
14/07/2026 Thomas Joseph Development Task #3412: GMF and Sidebands GMF Study 3:00 Resolved Thomas Joseph VAS Product Release 2.0 15/07/2026 05:11 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 29 19/03/2026 01/12/2025 Mohan 100% 1 Actions
13/07/2026 Thomas Joseph Development Task #3412: GMF and Sidebands GMF Study 3:00 Resolved Thomas Joseph VAS Product Release 2.0 15/07/2026 05:12 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 29 19/03/2026 01/12/2025 Mohan 100% 1 Actions
07/07/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Teams meeting - Review 0:45 In Progress Thomas Joseph VAS Product Release 2.0 07/07/2026 12:25 PM VAS Product Release 2.0 - BSH Task 28 19/03/2026 01/12/2025 Mohan 100% 1 Actions
07/07/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Teams discussion and doc update, email update 2:00 In Progress Thomas Joseph VAS Product Release 2.0 07/07/2026 07:40 AM VAS Product Release 2.0 - BSH Task 28 19/03/2026 01/12/2025 Mohan 100% 1 Actions
06/07/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing LED test support and paenl review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 06/07/2026 04:46 PM VAS Product Release 2.0 - BSH Task 28 19/03/2026 01/12/2025 Mohan 100% 1 Actions
06/07/2026 Thomas Joseph Development Task #3410: Envelop Analysis Teams Discussion 1:00 Closed Thomas Joseph VAS Product Release 2.0 06/07/2026 04:44 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 28 19/03/2026 01/12/2025 Mohan 100% 1 Actions
06/07/2026 Thomas Joseph Development Task #3410: Envelop Analysis GUI rendering discussion 1:00 Closed Thomas Joseph VAS Product Release 2.0 06/07/2026 08:10 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 28 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/07/2026 Thomas Joseph Development Task #3700: ES Documentation Review with SL plan for D2 migration 0:45 In Progress Thomas Joseph VAS Product Release 2.0 03/07/2026 03:05 PM VAS Product Release 2.0 - Future Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/07/2026 Thomas Joseph Development Task #3410: Envelop Analysis Python integration, Architecture finalization and GUI design inputs 0:45 Closed Thomas Joseph VAS Product Release 2.0 03/07/2026 03:04 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/07/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing LED Circuit Design 2:30 In Progress Thomas Joseph VAS Product Release 2.0 03/07/2026 02:54 PM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
02/07/2026 Thomas Joseph Design Task #3410: Envelop Analysis Design of Python integration 1:00 Closed Thomas Joseph VAS Product Release 2.0 02/07/2026 03:45 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
01/07/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Display heating - testing, issue resolution 2:00 In Progress Thomas Joseph VAS Product Release 2.0 02/07/2026 03:49 PM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
01/07/2026 Jagatheswaran J Testing Task #3707: Post Delivery bug fixing Device tested with new display -touch screen is working fine. 8:00 In Progress Jagatheswaran J VAS Product Release 2.0 01/07/2026 05:49 AM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
30/06/2026 Jagatheswaran J Testing Task #3707: Post Delivery bug fixing thermal test done with new display 8:00 In Progress Jagatheswaran J VAS Product Release 2.0 01/07/2026 05:50 AM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
30/06/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Discussion issue / resolution 1:00 In Progress Thomas Joseph VAS Product Release 2.0 30/06/2026 07:00 AM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
29/06/2026 Jagatheswaran J Testing Task #3707: Post Delivery bug fixing Thermal test done 9:00 In Progress Jagatheswaran J VAS Product Release 2.0 30/06/2026 05:29 AM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
29/06/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Issue discussion and test report analysis 2:00 In Progress Thomas Joseph VAS Product Release 2.0 29/06/2026 04:28 PM VAS Product Release 2.0 - BSH Task 27 19/03/2026 01/12/2025 Mohan 100% 1 Actions
27/06/2026 Jagatheswaran J Testing Task #3707: Post Delivery bug fixing Thermal test done 9:00 In Progress Jagatheswaran J VAS Product Release 2.0 29/06/2026 07:28 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
27/06/2026 Thomas Joseph Bug fixes Task #3707: Post Delivery bug fixing BSH email reply 1:00 In Progress Thomas Joseph VAS Product Release 2.0 27/06/2026 05:55 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
27/06/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Consolidating issues and action items 2:30 In Progress Thomas Joseph VAS Product Release 2.0 27/06/2026 05:07 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
26/06/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Review of testing 1:30 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:48 PM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
26/06/2026 Thomas Joseph Development Task #3700: ES Documentation Review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:47 PM VAS Product Release 2.0 - Future Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
26/06/2026 Thomas Joseph Development Task #3410: Envelop Analysis Design and Review 2:00 Closed Thomas Joseph VAS Product Release 2.0 26/06/2026 06:46 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
26/06/2026 Jagatheswaran J Testing Task #3707: Post Delivery bug fixing bsh post delivery testing 9:00 In Progress Jagatheswaran J VAS Product Release 2.0 26/06/2026 09:49 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
24/06/2026 Thomas Joseph Development Task #3701: Communication reliability testing Review 0:30 Hold Thomas Joseph VAS Product Release 2.0 25/06/2026 05:56 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
24/06/2026 Thomas Joseph Development Task #3410: Envelop Analysis Review 1:00 Closed Thomas Joseph VAS Product Release 2.0 25/06/2026 05:55 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
24/06/2026 Thomas Joseph Development Task #3700: ES Documentation mDAQ3 ES Doc. Review (Mohan, Shivaleela) 1:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 05:53 AM VAS Product Release 2.0 - Future Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
24/06/2026 Thomas Joseph Development Task #3707: Post Delivery bug fixing Review of issues and action plan 2:30 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 05:48 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
24/06/2026 Thomas Joseph Development Task #3524: Delivery and Installation Review of installation issues 1:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 05:47 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
23/06/2026 Thomas Joseph Development Task #3524: Delivery and Installation Installation Support 4:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 05:49 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
22/06/2026 Thomas Joseph Development Task #3410: Envelop Analysis Architecture plan 2:00 Closed Thomas Joseph VAS Product Release 2.0 25/06/2026 05:55 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
22/06/2026 Thomas Joseph Development Task #3524: Delivery and Installation Installation Support 6:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 05:49 AM VAS Product Release 2.0 - BSH Task 26 19/03/2026 01/12/2025 Mohan 100% 1 Actions
21/06/2026 Thomas Joseph Development Task #3523: System Testing Integration and Testing support 5:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 06:09 AM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
20/06/2026 Thomas Joseph Development Task #3523: System Testing BSH Integration and Testing Support 10:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 06:10 AM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
19/06/2026 Thomas Joseph Development Task #3523: System Testing Testing Review 2:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 06:11 AM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
19/06/2026 Jagatheswaran J Testing Task #3658: Testcase document preparation BSH testcase document 10:00 Resolved Jagatheswaran J VAS Product Release 2.0 19/06/2026 11:06 AM Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
18/06/2026 Thomas Joseph Development Task #3523: System Testing Testing Review 2:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:35 PM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
18/06/2026 Thomas Joseph Development Task #3524: Delivery and Installation System Delivery planning 2:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 06:12 AM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
17/06/2026 Thomas Joseph Development Task #3523: System Testing System Testing 6:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:25 PM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
15/06/2026 Thomas Joseph Development Task #3663: Testing of mini PC performance miniPC issue , testing 3:00 Resolved Thomas Joseph VAS Product Release 2.0 26/06/2026 06:23 PM VAS Product Release 2.0 - BSH Task 25 19/03/2026 01/12/2025 Mohan 100% 1 Actions
12/06/2026 Thomas Joseph Development Task #3519: Mechanical Design Design review (3 times) and release for fabrication 3:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:10 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
12/06/2026 Thomas Joseph Development Task #3662: Project Planning and Review Hardwrare Readiness review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:08 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
12/06/2026 Thomas Joseph Development Task #3523: System Testing BSH Testing complete and review of TR 2:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:34 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
11/06/2026 Thomas Joseph Development Task #3523: System Testing Test Review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:07 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
11/06/2026 Thomas Joseph Development Task #3662: Project Planning and Review Delivery Plan review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:06 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
11/06/2026 Thomas Joseph Development Task #3519: Mechanical Design Mechanical review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 06:00 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
11/06/2026 Thomas Joseph Development Task #3523: System Testing BSH Testing Review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:33 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
10/06/2026 Thomas Joseph Development Task #3519: Mechanical Design Mechanical review and update 1:30 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:56 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
10/06/2026 Thomas Joseph Development Task #3519: Mechanical Design Mechanical Design Review 1:30 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:53 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
10/06/2026 Chetan Hugar Testing Task #3523: System Testing Device Testing Update 8:00 In Progress Chetan Hugar VAS Product Release 2.0 10/06/2026 12:28 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
10/06/2026 Jiban Munda Testing Task #3421: Temperture - VAS Application Integration Please Find Attached Config File 12:00 Resolved Jiban Munda VAS Product Release 2.0 10/06/2026 10:23 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
10/06/2026 Jiban Munda Testing Task #3522: Report Generation Please find the attached Report File 40:00 Closed Jiban Munda VAS Product Release 2.0 10/06/2026 10:21 AM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
09/06/2026 Thomas Joseph Development Task #3391: Temperature measurement Temperature Calibration 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:51 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
09/06/2026 Thomas Joseph Development Task #3662: Project Planning and Review Product readiness review 1:30 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:40 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
08/06/2026 Thomas Joseph Development Task #3523: System Testing BSH Testing Review 2:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:33 PM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
08/06/2026 Thomas Joseph Development Task #3692: Onsite Installation Installation Preparation and Status update 3:00 Resolved Thomas Joseph VAS Product Release 2.0 26/06/2026 05:30 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
08/06/2026 Chetan Hugar Testing Task #3523: System Testing Testing Summary – Vibration Analyzer GUI 8:00 In Progress Chetan Hugar VAS Product Release 2.0 08/06/2026 11:16 AM VAS Product Release 2.0 - BSH Task 24 19/03/2026 01/12/2025 Mohan 100% 1 Actions
05/06/2026 Thomas Joseph Development Task #3692: Onsite Installation Installation plan review 1:00 Resolved Thomas Joseph VAS Product Release 2.0 26/06/2026 05:14 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
05/06/2026 Chetan Hugar Testing Task #3523: System Testing Monitor current consumption during startup and normal operation for 30 minutes. Record readings at 5-minute intervals. 30:00 In Progress Chetan Hugar VAS Product Release 2.0 05/06/2026 12:08 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
05/06/2026 Chetan Hugar Testing Task #3663: Testing of mini PC performance Monitor current consumption during startup and normal operation for 30 minutes. Record readings at 5-minute intervals. 30:00 Resolved Chetan Hugar VAS Product Release 2.0 05/06/2026 12:06 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
05/06/2026 Chetan Hugar Testing Task #3523: System Testing Mini-PC Extended Endurance and Thermal Stability Test – 41 Hours Continuous Operation 8:00 In Progress Chetan Hugar VAS Product Release 2.0 05/06/2026 05:58 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Thomas Joseph Development Task #3440: Device Calibration AFE / Temperature Calibration 3:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 05:08 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3523: System Testing I monitored the mini CPU status for 30 minutes with a VAS load of 3D graph. Screenshots were taken every 5 minutes, resulting in one screenshot for each 5-minute interval 8:00 In Progress Chetan Hugar VAS Product Release 2.0 04/06/2026 12:00 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3663: Testing of mini PC performance I monitored the mini CPU status for 30 minutes with a VAS load of 3D. Screenshots were taken every 5 minutes, resulting in one screenshot for each 5-minute interval 1:00 Resolved Chetan Hugar VAS Product Release 2.0 04/06/2026 11:59 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3523: System Testing mini cpu testing 8:00 In Progress Chetan Hugar VAS Product Release 2.0 04/06/2026 08:31 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3523: System Testing mini cpu testing 8:00 In Progress Chetan Hugar VAS Product Release 2.0 04/06/2026 08:30 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3523: System Testing System Testing 8:00 In Progress Chetan Hugar VAS Product Release 2.0 04/06/2026 08:29 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3663: Testing of mini PC performance mini cpu testing 32:00 Resolved Chetan Hugar VAS Product Release 2.0 04/06/2026 08:28 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
04/06/2026 Chetan Hugar Testing Task #3663: Testing of mini PC performance Mini-PC Continuous Runtime Validation (Since Yesterday 09:30 AM) 4:00 Resolved Chetan Hugar VAS Product Release 2.0 04/06/2026 08:17 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/06/2026 Thomas Joseph Development Task #3663: Testing of mini PC performance miniPC Test review 1:30 Resolved Thomas Joseph VAS Product Release 2.0 26/06/2026 04:51 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/06/2026 Thomas Joseph Development Task #3519: Mechanical Design Carrycase Clamp design 1:30 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 04:41 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/06/2026 Thomas Joseph Development Task #3520: Mechanical Fabrication Clamp design 1:30 In Progress Thomas Joseph VAS Product Release 2.0 03/06/2026 06:44 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/06/2026 Chetan Hugar Testing Task #3663: Testing of mini PC performance Mini-PC was kept running continuously from 6:00 PM on the previous day until 9:30 AM the following day (~15.5 hours) 1:00 Resolved Chetan Hugar VAS Product Release 2.0 03/06/2026 04:35 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
03/06/2026 Chetan Hugar Testing Task #3663: Testing of mini PC performance Mini PC Testing 7:00 Resolved Chetan Hugar VAS Product Release 2.0 03/06/2026 04:23 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
02/06/2026 Thomas Joseph Development Task #3692: Onsite Installation Installation preparation review 1:30 Resolved Thomas Joseph VAS Product Release 2.0 26/06/2026 04:23 PM VAS Product Release 2.0 - RHMS-ISTRAC Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
02/06/2026 Dhanasekar T Design Task #3519: Mechanical Design Mounting clamp design updated 2:00 In Progress Dhanasekar T VAS Product Release 2.0 02/06/2026 12:16 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
02/06/2026 VenuMadhav S Design Task #3664: mDAQ3 I/F schematic revision schematic update 1:00 Closed VenuMadhav S VAS Product Release 2.0 02/06/2026 09:27 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
02/06/2026 Jiban Munda Testing Task #3547: VAS integration and rendering Data gathering from device and preccing then ploting 2D Graph and 3D graph been done 30:00 Closed Jiban Munda VAS Product Release 2.0 02/06/2026 05:50 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
01/06/2026 Thomas Joseph Development Task #3517: Procurement Procurement review 1:00 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 04:15 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
01/06/2026 Thomas Joseph Development Task #3519: Mechanical Design Top Plate Design and Review 1:30 In Progress Thomas Joseph VAS Product Release 2.0 26/06/2026 04:09 PM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
01/06/2026 Thomas Joseph Development Task #3662: Project Planning and Review Project status and planned activities 2:00 In Progress Thomas Joseph VAS Product Release 2.0 02/06/2026 01:48 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
01/06/2026 Dhanasekar T Documentation Task #3516: Parts list Parts list updated 1:00 In Progress Dhanasekar T VAS Product Release 2.0 01/06/2026 07:17 AM VAS Product Release 2.0 - BSH Task 23 19/03/2026 01/12/2025 Mohan 100% 1 Actions
29/05/2026 Thomas Joseph Development Task #3516: Parts list Parts List review 0:45 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:41 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
29/05/2026 Thomas Joseph Design Task #3659: Testing of mini UPS performance TPP Design - Mini UPS 2:00 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:21 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
29/05/2026 Thomas Joseph Design Task #3660: Testing of GEMSD241205 (24V to 12V Buck module) TPP Design - Buck module 1:30 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:19 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
29/05/2026 Thomas Joseph Development Task #3662: Project Planning and Review Review and action plan (VM, DT) 2:00 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:18 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
28/05/2026 Thomas Joseph Design Task #3519: Mechanical Design BSH Panel for V300 Carry case 2:00 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:34 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
28/05/2026 Thomas Joseph Design Task #3518: Preliminary Design BSH Architecture updated with flashing and Debugging facility 2:00 Resolved Thomas Joseph VAS Product Release 2.0 29/05/2026 03:32 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
28/05/2026 Thomas Joseph Design Task #3519: Mechanical Design BSH Panel for 1450 Carrycase 3:00 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:31 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
27/05/2026 Thomas Joseph Development Task #3440: Device Calibration Temperature calibration : Design and team training 4:00 In Progress Thomas Joseph VAS Product Release 2.0 25/06/2026 05:37 AM VAS Product Release 2.0 - RHMS-ISTRAC Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
27/05/2026 Thomas Joseph Development Task #3519: Mechanical Design Selection of panel mount BNC 1:00 In Progress Thomas Joseph VAS Product Release 2.0 29/05/2026 03:30 PM VAS Product Release 2.0 - BSH Task 22 19/03/2026 01/12/2025 Mohan 100% 1 Actions
(1-100/244)

Also available in: CSV Atom