Project

General

Profile

Actions

Issues

Filters

Apply Clear

Estimated time: 60:00 Spent time: 1329:01

# Subject Status Assignee % Done Start date Due date Target version
3748 Power Board Customisation and Testing In Progress

31/07/2026 07/08/2026 Zarro Integrated - mDAQ Lite Actions
3714 System Testing New Chetan Hugar

23/07/2026 24/07/2026 Zarro Integrated - mDAQ Lite Actions
3713 RPM and TAH Analysis Started Channamallikarjuna Mattihalli

08/07/2026 10/07/2026 Zarro Integrated - mDAQ Lite Actions
3686 N58 Module - B28 New Dhanasekar T

02/06/2026 12/06/2026 Zarro Integrated - mDAQ Lite Actions
3685 Procurement In Progress Dhanasekar T

02/06/2026 14/07/2026 Zarro Integrated - mDAQ Lite Actions
3684 Battery Charger Load-Dump Rev. Pol Protection - Design New Thomas Joseph

03/06/2026 15/07/2026 Zarro Integrated - mDAQ Lite Actions
3683 Integrated testing with Sensors New Channamallikarjuna Mattihalli

20/07/2026 23/07/2026 Zarro Integrated - mDAQ Lite Actions
3682 ISO Documentation New VenuMadhav S

25/05/2026 03/06/2026 Actions
3681 ISO Documentation New VenuMadhav S

25/05/2026 03/06/2026 Actions
3680 Project Planning and Review In Progress Thomas Joseph

02/06/2026 10/07/2026 Zarro Integrated - mDAQ Lite Actions
3679 Preliminary Design In Progress Thomas Joseph

02/06/2026 03/06/2026 Zarro Integrated - mDAQ Lite Actions
3678 Customer requirements In Progress Thomas Joseph

02/06/2026 03/06/2026 Zarro Integrated - mDAQ Lite Actions
3677 Product Specification New Thomas Joseph

02/06/2026 02/06/2026 Zarro Integrated - mDAQ Lite Actions
3676 Device Readiness New Dhanasekar T

17/07/2026 17/07/2026 Zarro Integrated - mDAQ Lite Actions
3675 Panel Assembly New Dhanasekar T

15/07/2026 17/07/2026 Zarro Integrated - mDAQ Lite Actions
3674 Panel Design In Progress Dhanasekar T

02/06/2026 23/06/2026 Zarro Integrated - mDAQ Lite Actions
3673 Parts list In Progress Dhanasekar T

02/06/2026 23/06/2026 Zarro Integrated - mDAQ Lite Actions
3528 RTU data is not updating on the dashboard. New Greeshma Rayani

01/04/2026 Actions
3408 Internal Demo Analysis Started Jagatheswaran J

27/02/2026 20/03/2026 Actions
3407 Internal Demo Analysis Started Jagatheswaran J

27/02/2026 20/03/2026 Actions
3399 Sensor Testing New

13/03/2026 Actions
3379 On the graph the values and labels are overlapping In Progress Bhanusri Pasupuleti

13/03/2026 18/03/2026 Actions
3366 Training videos for Chola Analysis Started Prakash M

12/03/2026 Actions
3365 Alarm Parameter naming convention per customer inputs Resolved Prakash M

12/03/2026 31/03/2026 Actions
3364 Alarm Feedback trips : Test and validation Resolved Prakash M

11/03/2026 12/03/2026 Actions
3363 GPS Not Implemented-GPS functionality is not implemented in the current firmware. New Jagatheswaran J

11/03/2026 Actions
3361 LED not functioning as per the requirements In Progress Jagatheswaran J

09/03/2026 18/03/2026 Actions
3360 USB Config Tool : when the protocol is changed from RTU to TCP in the Modbus Config section No response In Progress Jagatheswaran J

09/03/2026 18/03/2026 Actions
3351 USB Configuration Tool –Not working In Progress Jagatheswaran J

04/03/2026 18/03/2026 Actions
3349 Trends Graph Showing Incorrect Data on Dashboard. In Progress Bhanusri Pasupuleti

13/03/2026 18/03/2026 Actions
3348 Temperature Group Graph Not Updating on Dashboard. In Progress Bhanusri Pasupuleti

13/03/2026 18/03/2026 Actions
3345 4G Network Reconnection Issue In Progress Jagatheswaran J

20/03/2026 07/04/2026 Actions
3344 USB LED (Green) is not meeting the specified requirement In Progress Jagatheswaran J

20/03/2026 07/04/2026 Actions
3341 4G does not reconnect after SIM removal and reinsertion. Feedback Channamallikarjuna Mattihalli

27/02/2026 18/03/2026 Actions
3261 RTU Cable for DI, DO, AI In Progress Surendra Naik

18/02/2026 25/02/2026 Actions
3257 Modbus RTU In Progress Channamallikarjuna Mattihalli

20/03/2026 26/03/2026 Actions
3256 Data Storage on 4G Failure In Progress Gowri G

11/02/2026 13/02/2026 Actions
3255 Modbus TCP Resolved Channamallikarjuna Mattihalli

20/03/2026 24/03/2026 Actions
3254 Modbus RTU Resolved Channamallikarjuna Mattihalli

10/02/2026 12/02/2026 Actions
3253 BoM Resolved Resmi K.V

11/02/2026 12/02/2026 GW 2.2 - GW 2.2 Design Actions
3249 Controller PCB Assembly New Dhanasekar T

23/02/2026 28/02/2026 Actions
3248 PCB Design In Progress Bhavani M

02/02/2026 14/02/2026 Actions
3247 Schematic Design In Progress Bhavani M

02/02/2026 06/02/2026 Actions
3246 Interface PCB BoM Resolved Resmi K.V

09/02/2026 11/02/2026 Actions
3245 Interface PCB Fabrication New Dhanasekar T

16/02/2026 22/02/2026 Actions
3244 E-REMOS Configuration for mDAQ Functional Testing In Progress Channamallikarjuna Mattihalli

23/03/2026 23/03/2026 Actions
3243 ConfigPacket (Split, Delay) In Progress DEVI PRIYAA

26/01/2026 06/02/2026 Actions
3240 Panel Assembly Manual (for Customer ) In Progress Sumanth D

26/01/2026 30/01/2026 Actions
3239 Installation Support In Progress Channamallikarjuna Mattihalli

30/01/2026 31/03/2026 Actions
3232 Rework Sheet Resolved VenuMadhav S

21/01/2026 23/01/2026 Actions
3228 Preliminary Design New Thomas Joseph

12/01/2026 23/01/2026 Actions
3227 Enclosure Screen Printing New Dhanasekar T

20/02/2026 28/02/2026 GW 2.2 - GW 2.2 Design Actions
3224 Review/Update of GW2.0 Test Plan and Procedure New VenuMadhav S

18/02/2026 20/02/2026 GW 2.2 - GW 2.2 Design Actions
3223 Test Plan Development and Approvals In Progress Jagatheswaran J

09/02/2026 16/02/2026 GW 2.2 - GW 2.2 Design Actions
3222 Project Planning and Review In Progress Thomas Joseph

05/01/2026 31/07/2026 Actions
3221 GW2.0 Codebase readiness(Release 3.0) New DEVI PRIYAA

25/02/2026 25/02/2026 GW 2.2 - GW 2.2 Design Actions
3220 PLCIO BoM Component Procurement In Progress Dhanasekar T

19/01/2026 28/01/2026 GW 2.2 - GW 2.2 Design Actions
3218 Design of Enclosure Graphics(Sticker/Screenprint) In Progress VenuMadhav S

18/02/2026 20/02/2026 GW 2.2 - GW 2.2 Design Actions
3217 Delivery (Phase 2) New Dhanasekar T

13/02/2026 13/02/2026 Actions
3216 Customer Demo New Venu Krishnamurthy

10/02/2026 10/02/2026 Actions
3215 Hardware Readiness In Progress VenuMadhav S

05/02/2026 05/02/2026 Actions
3214 System Testing New Jagatheswaran J

03/03/2026 31/03/2026 GW 2.2 - GW 2.2 Design Actions
3211 PLCIO PCB Electrical Testing and Bring-up In Progress Resmi K.V

25/06/2026 26/06/2026 GW 2.2 - GW 2.2 Design Actions
3210 Testing Analysis Started VenuMadhav S

03/03/2026 26/06/2026 GW 2.2 - GW 2.2 Design Actions
3209 Mechanical Assembly In Progress Dhanasekar T

03/03/2026 03/03/2026 GW 2.2 - GW 2.2 Design Actions
3208 PLCIO PCB Assembly New Dhanasekar T

25/02/2026 03/03/2026 GW 2.2 - GW 2.2 Design Actions
3207 Assembly Manual (Documentation) New VenuMadhav S

19/01/2026 30/01/2026 GW 2.2 - GW 2.2 Design Actions
3206 Parts List(Mech. Assembly) New Dhanasekar T

19/01/2026 30/01/2026 GW 2.2 - GW 2.2 Design Actions
3205 Assembly Analysis Started Dhanasekar T

19/01/2026 03/03/2026 GW 2.2 - GW 2.2 Design Actions
3204 Embedded SW-Development New Channamallikarjuna Mattihalli

25/02/2026 25/02/2026 GW 2.2 - GW 2.2 Design Actions
3203 E-REMOS Development New

12/02/2026 05/03/2026 Actions
3202 Wiring Diagram New VenuMadhav S

17/02/2026 18/02/2026 GW 2.2 - GW 2.2 Design Actions
3201 Product Requirements New Venu Krishnamurthy

12/01/2026 21/01/2026 GW 2.2 - GW 2.2 Design Actions
3200 Customer Requirements Finalisation Analysis Started Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3199 PLCIO PCB Fabrication In Progress Dhanasekar T

18/02/2026 25/02/2026 GW 2.2 - GW 2.2 Design Actions
3198 Enclosure fabrication New Dhanasekar T

18/02/2026 28/02/2026 GW 2.2 - GW 2.2 Design Actions
3197 Enclosure Procurement New Dhanasekar T

16/02/2026 20/02/2026 GW 2.2 - GW 2.2 Design Actions
3196 Procurement Analysis Started Dhanasekar T

19/01/2026 03/03/2026 GW 2.2 - GW 2.2 Design Actions
3195 Design of Enclosure Cutouts In Progress Resmi K.V

18/02/2026 20/02/2026 GW 2.2 - GW 2.2 Design Actions
3192 Schematic Design Resolved Resmi K.V

05/01/2026 11/02/2026 GW 2.2 - GW 2.2 Design Actions
3191 PCB Design Resolved Resmi K.V

02/02/2026 17/02/2026 GW 2.2 - GW 2.2 Design Actions
3189 Design and Development of PLCIO PCB In Progress Thomas Joseph

05/01/2026 17/02/2026 GW 2.2 - GW 2.2 Design Actions
3179 Design of Enclosure Graphics(Sticker/Screenprint) Resolved VenuMadhav S

20/03/2026 23/03/2026 Actions
3178 Enclosure Procurement Resolved Dhanasekar T

02/03/2026 04/03/2026 Actions
3172 USB Factory Configuration In Progress Greeshma Rayani

19/01/2026 20/01/2026 Actions
3169 Design and Development of SIM Holder PCB Resolved Surendra Naik

20/03/2026 20/03/2026 Actions
3168 USB Configuration Tool(Revision) New

20/03/2026 07/04/2026 Actions
3167 USB Configuration Tool(Revision) New Greeshma Rayani

19/01/2026 20/01/2026 Actions
3166 N58 Integration Resolved DEVI PRIYAA

29/01/2026 03/02/2026 Actions
3164 PCB Design In Progress VenuMadhav S

20/01/2026 11/02/2026 Actions
3163 Schematic Design In Progress Bhavani M

19/01/2026 19/01/2026 Actions
3162 Programming Model Update Resolved Sumanth D

20/03/2026 23/03/2026 Actions
3161 Programming Model Update In Progress VenuMadhav S

19/01/2026 19/01/2026 Actions
3159 PLCIO Interface Cable Resolved Surendra Naik

19/01/2026 19/01/2026 Actions
3158 D-Sub 25 Cable Preparation Resolved Sumanth D

19/01/2026 22/01/2026 Actions
3157 GW2.0 PCB Testing Resolved Bhavani M

23/03/2026 24/04/2026 Actions
3156 Hardware Setup readiness for software development Resolved Dhilip Kumar R

20/03/2026 24/03/2026 Actions
3155 Design and Development of Interface PCB In Progress Bhavani M

02/02/2026 14/02/2026 Actions
3154 Design and Development of Controller+4G(N58) PCB In Progress VenuMadhav S

19/01/2026 11/02/2026 Actions
3153 Design of Enclosure Cutouts New VenuMadhav S

16/02/2026 17/02/2026 Actions
(1-100/282)

Also available in: CSV PDF Atom