22/01/2026 Dhanasekar T Documentation Task #2955: Parts List(Mech. Assembly) Done 0:30 Resolved Dhanasekar T Chola Turbo 22/01/2026 01:07 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
22/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup Data posting -side development is in process(linux platform) 8:00 Resolved Prakash M Chola Turbo 22/01/2026 01:04 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
22/01/2026 Surendra Naik Mechanical Assembly Task #2973: Mechanical Assembly led pcb asembly & Mechanical assembly and integrate 4:00 Resolved Surendra Naik mTracker(Mid Range GW)-Pilot 22/01/2026 12:56 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals testcase document 4:00 In Progress Jagatheswaran J mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 12:55 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Surendra Naik Mechanical Assembly Task #2973: Mechanical Assembly usb pcb asembly & Mechanical assembly and integrate 4:00 Resolved Surendra Naik mTracker(Mid Range GW)-Pilot 22/01/2026 12:53 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Thomas Joseph Design Task #3179: Design of Enclosure Graphics(Sticker/Screenprint) review 1:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 10:47 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 DEVI PRIYAA Development Task #3034: DI Module DI module code integrated 2:00 Resolved DEVI PRIYAA mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 09:51 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Dhanasekar T Documentation Task #2999: Parts List(Mech. Assembly) Document review 1:00 In Progress Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 07:42 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Status 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 22/01/2026 05:46 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph Design Task #3120: Project Planning and Review Design planning 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 21/01/2026 05:58 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph redmine review/ update Task #3038: Project Planning and Review Planning and Review 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 21/01/2026 05:53 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts review 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 05:52 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph Design Task #3179: Design of Enclosure Graphics(Sticker/Screenprint) review 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 05:51 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 05:51 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 05:07 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Dhanasekar T Procurement Task #3178: Enclosure Procurement Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 03:51 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Enclosure moved to fabricator 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 03:29 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup Config packet verification is in process on device side. 7:00 Resolved Prakash M Chola Turbo 21/01/2026 01:15 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
21/01/2026 Dhanasekar T Procurement Task #3178: Enclosure Procurement Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 11:43 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Sumanth D Mechanical Assembly Task #3158: D-Sub 25 Cable Preparation Cabeling 3:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 11:36 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals Test case Document update 8:00 In Progress Jagatheswaran J Chola Turbo 21/01/2026 10:19 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
21/01/2026 Sumanth D Documentation Task #3162: Programming Model Update Program. model 0:30 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 07:35 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Dhilip Kumar R Mechanical Assembly Task #3156: Hardware Setup readiness for software development Hardware Test setup for Interface GW2.0 with PLCIO. 1:00 Resolved Dhilip Kumar R mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 07:28 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Dhanasekar T Procurement Task #3178: Enclosure Procurement PI received and payment also done 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 21/01/2026 06:39 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Dhilip Kumar R PCB assembly Task #2975: IO PCB Electrical Testing IO PCB assembly 1:00 Resolved Dhilip Kumar R mTracker(Mid Range GW)-Pilot 21/01/2026 05:55 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement Review 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 21/01/2026 05:40 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Thomas Joseph redmine review/ update Task #3037: Project Planning and Review Planning and Review 0:30 Resolved Thomas Joseph Chola Turbo 20/01/2026 04:00 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
20/01/2026 Bhavani M Design Task #3163: Schematic Design N58 Circuit added 5:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 20/01/2026 02:22 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Jagatheswaran J Documentation Task #3041: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 20/01/2026 01:09 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J Chola Turbo 20/01/2026 01:04 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
20/01/2026 Sumanth D Documentation Task #3158: D-Sub 25 Cable Preparation Wiring diagram 5:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 11:26 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement Discussion on merging issue/resolution 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 20/01/2026 11:23 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Dhanasekar T Mechanical Assembly Task #2973: Mechanical Assembly LED PCB assembly and integrate with enclosure 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 20/01/2026 09:20 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Dhanasekar T Procurement Task #2938: Enclosure fabrication Document updated 0:30 Resolved Dhanasekar T Chola Turbo 20/01/2026 09:05 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
20/01/2026 Dhanasekar T PCB assembly Task #3125: GW BoM Component Procurement PCB assembly 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 20/01/2026 08:50 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup The Modbus parameter names were corrected after updating the placeholders(limits) on the UI. 3:00 Resolved Prakash M Chola Turbo 20/01/2026 08:24 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
20/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement BoM Analysis 0:45 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 20/01/2026 08:14 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Enclosure design review 0:40 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 07:24 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Surendra Naik cable assembly Task #3158: D-Sub 25 Cable Preparation d -sub 25 connector wiring 4:00 Resolved Surendra Naik mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 06:17 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/01/2026 Surendra Naik cable assembly Task #3159: PLCIO Interface Cable plcio cable preparation 4:00 Resolved Surendra Naik mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 05:45 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts review of enclosure design 1:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/01/2026 04:02 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement BoM Analysis 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 20/01/2026 03:12 AM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Bhavani M Design Task #3163: Schematic Design N58 schematic creation 4:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 19/01/2026 02:39 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J Chola Turbo 19/01/2026 01:06 PM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
19/01/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 01:04 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Dhanasekar T Design Task #2986: Design of Enclosure Cutouts Design uploaded 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 11:54 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Dhanasekar T Documentation Task #2970: Parts List(Mech. Assembly) Updated 0:30 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 19/01/2026 11:41 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Critical Project Update call 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 19/01/2026 11:22 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 1:00 Resolved Thomas Joseph Chola Turbo 19/01/2026 11:21 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
19/01/2026 DEVI PRIYAA Development Task #2968: SW-Development Software Development 2:00 In Progress DEVI PRIYAA mTracker(Mid Range GW)-Pilot 19/01/2026 09:37 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Sumanth D Documentation Task #3162: Programming Model Update Programming model 0:30 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 07:00 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Sumanth D Documentation Task #3156: Hardware Setup readiness for software development Interface arch 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 06:50 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Bhavani M Design Task #3057: Schematic Design Modification WiFi_4G PCB GWV2_1 Board file 1:00 In Progress Bhavani M Gateway V2.1 19/01/2026 05:48 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
19/01/2026 Yoganand D Testing Task #2930: Test PLCIO with CTB application Completed Testing 0:00 Resolved Yoganand D mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:47 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Controller board dsn file 1:00 In Progress Bhavani M Gateway V2.1 19/01/2026 05:44 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
19/01/2026 Bhavani M Design Task #2887: New Enclosure - Complete Design and Development Gateway v2_1 Step file 1:00 In Progress Bhavani M Gateway V2.1 19/01/2026 05:42 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
19/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Wifi-4G Schematic Pdf 1:00 In Progress Bhavani M Gateway V2.1 19/01/2026 05:39 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
19/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB GWV2_1 Schematic 1:00 In Progress Bhavani M Gateway V2.1 19/01/2026 05:37 AM Task 4 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
19/01/2026 Dhanasekar T Procurement Task #2938: Enclosure fabrication Machining and laser marking completed 0:06 Resolved Dhanasekar T Chola Turbo 19/01/2026 05:32 AM Task 4 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
19/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Process started 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:29 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:26 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph Design Task #2984: Preliminary Design Architecture (Prelim design) update 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:25 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Mech. Design Feasibility-Enclosure cutouts plan 1:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:24 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/01/2026 Resmi K.V Documentation Task #2928: Testing of PLCIO Stacked boards with CTB platform TA Sheet 0:15 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:23 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Yoganand D Testing Task #2930: Test PLCIO with CTB application Completed Testing 4:00 Resolved Yoganand D mDAQ4-1(Mid Range mDAQ)-Pilot 19/01/2026 05:43 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Thomas Joseph Mechanical Assembly Task #2947: Mechanical Assembly Review of assembly issues and resolution 1:00 Resolved Thomas Joseph Chola Turbo 16/01/2026 03:01 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/01/2026 Thomas Joseph redmine review/ update Task #3038: Project Planning and Review Review and Planning 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 16/01/2026 03:00 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 0:45 Resolved Thomas Joseph Chola Turbo 16/01/2026 02:58 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/01/2026 Thomas Joseph Design Task #2984: Preliminary Design System Study and architecture Design 1:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 02:57 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Thomas Joseph Testing Task #2948: USB PCB Testing Assembly and test review and support 1:00 Resolved Thomas Joseph Chola Turbo 16/01/2026 02:55 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/01/2026 Thomas Joseph Testing Task #2930: Test PLCIO with CTB application Review of test results 0:45 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 02:52 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Status update and Plan revision 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 02:44 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Resmi K.V Documentation Task #2928: Testing of PLCIO Stacked boards with CTB platform TR creation 2:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 02:27 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Resmi K.V Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Testing of PLC#01 and PLC#02 6:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Pilot 16/01/2026 02:26 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup Config packet list verification is in process. 1:00 Resolved Prakash M Chola Turbo 16/01/2026 02:14 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup All Modbus parameters (real data type and alarm-based bit fields) have been added to the dashboard 4:00 Resolved Prakash M Chola Turbo 16/01/2026 06:34 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Thomas Joseph Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Review of test results 0:45 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 07:14 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review PCB Integration Issues/E54 Shortage mitigation 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 14/01/2026 07:13 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Documentation Task #2966: Wiring Diagram Wiring diagram 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 14/01/2026 07:11 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Resmi K.V Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Testing of PLC#01 and PLC#02 6:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 02:53 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Yoganand D Testing Task #2930: Test PLCIO with CTB application Tested PLCIO 4:00 Resolved Yoganand D mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 02:42 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 2:00 Resolved Thomas Joseph Chola Turbo 14/01/2026 11:08 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Resmi K.V Documentation Task #2928: Testing of PLCIO Stacked boards with CTB platform Document preparation 2:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 08:17 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Testing Task #2930: Test PLCIO with CTB application Status Review and Debug support for PLCIO 0:45 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 08:03 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Review document Task #2913: Test Plan Development and Approvals Test case doc. review 0:30 In Progress Thomas Joseph Chola Turbo 14/01/2026 08:00 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals Test case Document 8:00 In Progress Jagatheswaran J Chola Turbo 14/01/2026 07:19 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Thomas Joseph Design Task #3017: Design of Enclosure Graphics(Sticker/Screenprint) Discussion on issue/resolution 0:15 Resolved Thomas Joseph mTracker(Mid Range GW)-Pilot 14/01/2026 07:07 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Testing Task #2947: Mechanical Assembly Review of Assembly Issues 0:45 Resolved Thomas Joseph Chola Turbo 14/01/2026 07:05 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Status meeting discussion on action items 0:30 Resolved Thomas Joseph Chola Turbo 14/01/2026 07:04 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Dhanasekar T Mechanical Assembly Task #2947: Mechanical Assembly Mechanical assembly report 1:00 Resolved Dhanasekar T Chola Turbo 14/01/2026 06:36 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
14/01/2026 Resmi K.V O3 discussion Task #2928: Testing of PLCIO Stacked boards with CTB platform Status meeting with Thomas sir 0:30 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Pilot 14/01/2026 06:32 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/01/2026 Thomas Joseph Documentation Task #2956: Preliminary Design Prelim. Design Documentation 0:45 Resolved Thomas Joseph Chola Turbo 14/01/2026 05:30 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
13/01/2026 Thomas Joseph redmine review/ update Task #3120: Project Planning and Review Project Planning 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 15/01/2026 05:34 AM Task 3 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Surendra Naik PCB assembly Task #2946: USB PCB Assembly Usb pcb assembly 6:00 Resolved Surendra Naik Chola Turbo 13/01/2026 05:03 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
13/01/2026 Thomas Joseph Testing Task #2940: Enclosure fabrication Sample enclosure cutout - quality checking 0:30 Resolved Thomas Joseph mTracker(Mid Range GW)-Pilot 13/01/2026 04:48 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Thomas Joseph redmine review/ update Task #3037: Project Planning and Review Plan revision 0:45 Resolved Thomas Joseph Chola Turbo 13/01/2026 02:25 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
13/01/2026 Thomas Joseph Development Task #2997: GW 2.0 PCB Assembly Support for X-Y data preparation for Panel 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 02:06 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Thomas Joseph Documentation Task #2983: Product Requirements Core4 mDAQ Product Spec. Updation 0:20 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 02:04 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly 2 sets of board sent to uV for assembly 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 02:03 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Dhanasekar T PCB assembly Task #3051: GW2.0 PCB Assembly 2 sets of board sent to uV for assembly 0:30 Closed Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 01:29 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions