Date User Activity Issue Comment Hours Status Author Project Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Severity
19/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 02:27 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Surendra Naik PCB assembly Task #2979: Hardware Readiness GW mcu board testing & rework 4:00 In Progress Surendra Naik mTracker(Mid Range GW)-Pilot 19/02/2026 08:03 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/02/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Critical Project Update call 1:10 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 19/02/2026 03:40 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 18/02/2026 01:51 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/02/2026 Surendra Naik cable assembly Task #3159: PLCIO Interface Cable PLCIO Interface Cable 2:00 Resolved Surendra Naik mDAQ4-1(Mid Range mDAQ)-Pilot 18/02/2026 12:07 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure debuggibng the code 8:00 In Progress Gowri G mTracker(Mid Range GW)-Pilot 23/02/2026 06:43 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 Thomas Joseph Design Task #3191: PCB Design Design review and Support (RKV) 5:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 03:49 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 Thomas Joseph Bug fixes Bug #3260: GW2.0 boards issue Board Issues Troubleshooting 2:00 Closed Thomas Joseph mTracker(Mid Range GW)-Pilot 19/02/2026 03:42 PM Bug 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
17/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 17/02/2026 02:25 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 DEVI PRIYAA Testing Task #3254: Modbus RTU Multiple slave id's is working 6:00 Resolved DEVI PRIYAA mTracker(Mid Range GW)-Pilot 17/02/2026 11:16 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure Debugging the code for the sd not inialized properly 8:00 In Progress Gowri G mTracker(Mid Range GW)-Pilot 23/02/2026 06:38 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Resmi K.V Design Task #3191: PCB Design Assigning footprint and component placement. 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 17/02/2026 02:26 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Thomas Joseph Testing Fix Bug #3260: GW2.0 boards issue Analysis and troubleshoot plan 0:45 Closed Thomas Joseph mTracker(Mid Range GW)-Pilot 16/02/2026 06:35 PM Bug 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
16/02/2026 Thomas Joseph Design Task #3164: PCB Design review 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 16/02/2026 06:31 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Thomas Joseph O3 discussion Task #3222: Project Planning and Review Status meeting discussion on action items (VM) 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 06:30 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Thomas Joseph Design Task #3191: PCB Design Design of PLCIO PCB 6:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 06:28 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Jagatheswaran J Testing Task #3223: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 12:10 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Enquiry BoM costing quotation 0:30 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 16/02/2026 06:59 AM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure Done with the read and write of SD card- Data was stored in the SD card 16:00 In Progress Gowri G mTracker(Mid Range GW)-Pilot 16/02/2026 05:05 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/02/2026 Thomas Joseph Bug fixes Bug #3259: Atmel ICE Debugger not detecting Atmel ICE Debugger troubleshooting 7:30 Closed Thomas Joseph mTracker(Mid Range GW)-Pilot 14/02/2026 04:06 PM Bug 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
14/02/2026 Bhavani M Design Task #3248: PCB Design connector PCB routing 6:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 14/02/2026 01:29 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/02/2026 Bhavani M Design Task #3248: PCB Design PCB Routing 4:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 13/02/2026 02:13 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 13/02/2026 12:59 PM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/02/2026 Bhavani M Design Task #3247: Schematic Design Schematic Design 2:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 12/02/2026 01:25 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement BoM verification and costing preparation 4:00 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 17/02/2026 06:37 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 13/02/2026 06:43 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Resmi K.V Design Task #3164: PCB Design PCB design 8:00 In Progress Resmi K.V mTracker(Mid Range GW)-Production 11/02/2026 02:21 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Thomas Joseph Meeting Task #3222: Project Planning and Review Discussion on Resource Allocation ( SV, VK, TJ) 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 11/02/2026 02:10 PM Task 7 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:10 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 10:30 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Thomas Joseph Development Task #2982: Customer Requirements Finalisation requirement analysis 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 04:00 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Support Task #3239: Installation Support TIA Software Uninstallation 0:30 In Progress Thomas Joseph Chola Turbo 11/02/2026 04:15 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
10/02/2026 Thomas Joseph Development Task #3154: Design and Development of Controller+4G(N58) PCB Design review and Support (RKV) 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 11/02/2026 04:06 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Meeting Task #2983: Product Requirements Customer meeting 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 04:04 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Meeting Task #3222: Project Planning and Review production plan review - PCB design (VK, SV, RKV, DT) 0:45 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 11/02/2026 04:04 AM Task 7 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Resmi K.V Documentation Task #3246: Interface PCB BoM BoM creation 1:00 Resolved Resmi K.V mTracker(Mid Range GW)-Production 10/02/2026 10:30 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Resmi K.V Documentation Task #3247: Schematic Design Schematic PDF creation 0:30 In Progress Resmi K.V mTracker(Mid Range GW)-Production 10/02/2026 10:29 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph redmine review/ update Task #3120: Project Planning and Review Planning and Review 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 10/02/2026 09:56 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Resmi K.V Documentation Task #3126: Controller PCB BoM BoM creation 1:00 Resolved Resmi K.V mTracker(Mid Range GW)-Production 10/02/2026 09:14 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 DEVI PRIYAA Development Task #3244: E-REMOS Configuration for mDAQ Functional Testing Configured the dashboard as per the requirement. 2:00 In Progress DEVI PRIYAA mDAQ4-1(Mid Range mDAQ)-Pilot 10/02/2026 07:59 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Development Task #2915: EREMOS Development Data update 0:30 In Progress Thomas Joseph Chola Turbo 10/02/2026 05:39 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testcase document update 8:00 Analysis Started Jagatheswaran J Chola Turbo 10/02/2026 10:11 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/02/2026 Thomas Joseph Support Task #3239: Installation Support TIA Installation 3:00 In Progress Thomas Joseph Chola Turbo 09/02/2026 05:11 PM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/02/2026 Resmi K.V Design Task #3164: PCB Design PCB design 7:00 In Progress Resmi K.V mTracker(Mid Range GW)-Production 09/02/2026 01:55 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/02/2026 Thomas Joseph Meeting Task #3164: PCB Design Team review meeting 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 09/02/2026 08:36 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/02/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 09/02/2026 08:34 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/02/2026 Thomas Joseph Development Task #3243: ConfigPacket (Split, Delay) Discussion on plan & review 0:30 In Progress Thomas Joseph Chola Turbo 09/02/2026 08:32 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation Report Generation 1:00 In Progress Thomas Joseph Chola Turbo 09/02/2026 08:32 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
07/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 8:00 In Progress Thomas Joseph Chola Turbo 08/02/2026 08:11 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
06/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement PCB power enquiry for assembly regarding 1:00 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 11/02/2026 06:21 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
06/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 10:00 In Progress Thomas Joseph Chola Turbo 08/02/2026 08:11 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
05/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Wurth electronics connectors enquiry 2:00 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 11/02/2026 06:20 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
05/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testing 6:00 Analysis Started Jagatheswaran J Chola Turbo 05/02/2026 12:48 PM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
05/02/2026 Bhavani M Design Task #3164: PCB Design Placement components in microcontroller Pcb 8:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 05/02/2026 07:29 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
05/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testing 4:00 Analysis Started Jagatheswaran J Chola Turbo 05/02/2026 05:44 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
04/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement 3 sets of board shortage components order 1:00 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 11/02/2026 06:19 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
04/02/2026 Dhanasekar T PCB assembly Task #3125: GW BoM Component Procurement 3 sets of board kitting and quote initiate,PR creation 6:00 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 11/02/2026 06:18 AM Task 6 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
04/02/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J mDAQ4-1(Mid Range mDAQ)-Pilot 05/02/2026 05:45 AM Task 6 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
04/02/2026 Dhanasekar T Procurement Task #3220: PLCIO BoM Component Procurement N58 received 0:06 In Progress Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Production 04/02/2026 02:25 PM GW 2.2 - GW 2.2 Design Task 6 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
03/02/2026 Dhilip Kumar R Testing Task #3052: Test Setup Test Setup of 100mA,200mA,500mA. 1:00 Resolved Dhilip Kumar R mDAQ4-1(Mid Range mDAQ)-Pilot 03/02/2026 02:01 PM Task 6 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
02/02/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 10:00 In Progress Thomas Joseph Chola Turbo 05/02/2026 08:10 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
02/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports testing 8:00 Analysis Started Jagatheswaran J Chola Turbo 03/02/2026 06:21 AM Task 6 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
01/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 8:00 Analysis Started Jagatheswaran J Chola Turbo 02/02/2026 07:45 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
30/01/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 12:00 In Progress Thomas Joseph Chola Turbo 05/02/2026 08:11 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
30/01/2026 Dhilip Kumar R Testing Task #2975: IO PCB Electrical Testing IO PCB testing with AI and DI after software update. 1:00 Resolved Dhilip Kumar R mTracker(Mid Range GW)-Pilot 30/01/2026 02:03 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
30/01/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 30/01/2026 01:32 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
30/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Fabrication done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 30/01/2026 10:27 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
30/01/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing GW2.0 PCB Testing 8:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 30/01/2026 05:35 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
29/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Fabricator made cutout wrongly 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 29/01/2026 02:04 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
29/01/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 29/01/2026 01:08 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
29/01/2026 Thomas Joseph Documentation Task #2958: Product Requirements Product Spec. document update 0:30 Resolved Thomas Joseph Chola Turbo 29/01/2026 05:24 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
28/01/2026 Thomas Joseph Development Task #3039: Project Planning and Review Status meeting discussion on action items(VM) 1:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 02:40 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
28/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 02:39 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
28/01/2026 Dhanasekar T Procurement Task #2993: Enclosure fabrication Tomorrow It will complete 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 02:02 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
28/01/2026 Dhanasekar T Procurement Task #2942: Procurement Done 0:06 Resolved Dhanasekar T Chola Turbo 28/01/2026 06:34 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
28/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 06:30 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
28/01/2026 Dhanasekar T Dispatch Task #2916: Proto 1 Delivery to Chola Device Delivered to customer 0:06 Resolved Dhanasekar T Chola Turbo 28/01/2026 06:29 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
28/01/2026 Sumanth D Mechanical Assembly Task #3158: D-Sub 25 Cable Preparation cable preparation 3:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 28/01/2026 04:38 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/01/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB testing 8:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 27/01/2026 02:57 PM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement Discussion on plan & review 1:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 27/01/2026 12:29 PM Task 5 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/01/2026 Thomas Joseph Development Task #3120: Project Planning and Review Discussion on plan & review 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 27/01/2026 07:10 AM Task 5 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/01/2026 Thomas Joseph Development Task #3037: Project Planning and Review review 0:15 Resolved Thomas Joseph Chola Turbo 27/01/2026 07:09 AM Task 5 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
27/01/2026 Thomas Joseph Development Task #3038: Project Planning and Review Discussion on plan & review 0:45 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 27/01/2026 07:08 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/01/2026 Thomas Joseph Development Task #3039: Project Planning and Review Discussion on plan & review 0:45 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 27/01/2026 07:08 AM Task 5 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Assembled board received 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 03:10 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Dhilip Kumar R Testing Task #2977: DI Performance Testing Testing of DI with IO PCB. 1:00 Resolved Dhilip Kumar R mTracker(Mid Range GW)-Pilot 23/01/2026 02:18 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Dhilip Kumar R Testing Task #2976: AI Performance Testing Testing of AI with IO PCB. 1:00 Resolved Dhilip Kumar R mTracker(Mid Range GW)-Pilot 23/01/2026 02:02 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Dhilip Kumar R Testing Task #2975: IO PCB Electrical Testing Complete test setup of electrical testing is done. 1:00 Resolved Dhilip Kumar R mTracker(Mid Range GW)-Pilot 23/01/2026 01:57 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Bhavani M Design Task #3163: Schematic Design schematic update 4:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 23/01/2026 01:54 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Jagatheswaran J Testing Task #3042: Test Plan Development and Approvals Test case Document update 8:00 In Progress Jagatheswaran J mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 12:31 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 DEVI PRIYAA Development Task #3030: AI Module AI module tested with the setup 2:00 Resolved DEVI PRIYAA mTracker(Mid Range GW)-Pilot 23/01/2026 06:44 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Dhilip Kumar R Testing Task #2975: IO PCB Electrical Testing Testing setup of AI and DI. 1:00 Resolved Dhilip Kumar R mTracker(Mid Range GW)-Pilot 23/01/2026 06:42 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 DEVI PRIYAA Development Task #3029: DI Module DI testing done with the setup 2:00 Resolved DEVI PRIYAA mTracker(Mid Range GW)-Pilot 23/01/2026 06:35 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Assembly is completed 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 05:46 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/01/2026 DEVI PRIYAA Development Task #3033: AI Module AI module code integrated 3:00 Resolved DEVI PRIYAA mDAQ4-1(Mid Range mDAQ)-Pilot 23/01/2026 05:27 AM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Thomas Joseph Design Task #3189: Design and Development of PLCIO PCB Study - Mechanical , Schematic, Layout plan 3:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 22/01/2026 06:06 PM GW 2.2 - GW 2.2 Design Task 4 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Bhavani M Design Task #3164: PCB Design N58 footprint created 4:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 22/01/2026 03:34 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 VenuMadhav S Design Task #3163: Schematic Design RS-485 schematic design added 4:00 In Progress VenuMadhav S mTracker(Mid Range GW)-Production 22/01/2026 03:31 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 DEVI PRIYAA Development Task #3030: AI Module I2C Communication working fine. 4:00 Resolved DEVI PRIYAA mTracker(Mid Range GW)-Pilot 22/01/2026 02:28 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Thomas Joseph Procurement Task #3125: GW BoM Component Procurement BoM Analysis 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 22/01/2026 01:59 PM Task 4 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
22/01/2026 Dhanasekar T Documentation Task #2970: Parts List(Mech. Assembly) Done 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 22/01/2026 01:19 PM Task 4 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions