Hours: 1340:22

Date User Activity Issue Comment Hours Status Author Project Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Severity
06/08/2026 Thomas Joseph Development Task #3748: Power Board Customisation and Testing Battery Charger Testing support 1:30 In Progress Thomas Joseph GW 2.2 06/08/2026 06:56 PM Zarro Integrated - mDAQ Lite Task 32 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
04/08/2026 Thomas Joseph Development Task #3674: Panel Design Review and customer discussion 1:00 In Progress Thomas Joseph GW 2.2 04/08/2026 02:30 PM Zarro Integrated - mDAQ Lite Task 32 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
03/07/2026 Thomas Joseph Development Task #3680: Project Planning and Review Review - Team Discussion 1:00 In Progress Thomas Joseph GW 2.2 03/07/2026 10:17 AM Zarro Integrated - mDAQ Lite Task 27 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
02/07/2026 Thomas Joseph Design Task #3679: Preliminary Design Design of Power circuit 3:00 In Progress Thomas Joseph GW 2.2 02/07/2026 03:43 PM Zarro Integrated - mDAQ Lite Task 27 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
01/07/2026 Thomas Joseph Development Task #3211: PLCIO PCB Electrical Testing and Bring-up DO Bring-up and ADC Data verification 4:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 02/07/2026 03:52 PM GW 2.2 - GW 2.2 Design Task 27 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
29/06/2026 Thomas Joseph Development Task #3679: Preliminary Design Design of protection, battery charger, power path 2:00 In Progress Thomas Joseph GW 2.2 29/06/2026 04:24 PM Zarro Integrated - mDAQ Lite Task 27 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
29/06/2026 Thomas Joseph Development Task #3209: Mechanical Assembly PLCIO Mounting options discussion 1:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 29/06/2026 04:22 PM GW 2.2 - GW 2.2 Design Task 27 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
29/06/2026 Thomas Joseph Development Task #3211: PLCIO PCB Electrical Testing and Bring-up PLCIO Bring-up support 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 29/06/2026 04:16 PM GW 2.2 - GW 2.2 Design Task 27 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
28/06/2026 Thomas Joseph Development Task #3211: PLCIO PCB Electrical Testing and Bring-up PLCIO Bring up testing support 2:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 28/06/2026 04:08 PM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/06/2026 Thomas Joseph Development Task #3222: Project Planning and Review Review meeting at 12.00 noon 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 27/06/2026 06:37 PM Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/06/2026 Thomas Joseph Development Task #3211: PLCIO PCB Electrical Testing and Bring-up SPI testing and Do Programming model 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 27/06/2026 06:35 PM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/06/2026 Thomas Joseph Development Task #3222: Project Planning and Review Review meeting @ 6.00pm 0:45 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 27/06/2026 06:34 PM Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/06/2026 Thomas Joseph Development Task #3211: PLCIO PCB Electrical Testing and Bring-up Troubleshooting support : DI-Regulator VCC-GND 1:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 06:50 PM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/06/2026 Thomas Joseph Development Task #3215: Hardware Readiness Design Review and Delivery Test review 2:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 06:45 PM Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Review of issues 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 03:57 PM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/06/2026 Thomas Joseph Development Task #3211: PLCIO PCB Electrical Testing and Bring-up PLCIO Bring-up support 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 03:54 PM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/06/2026 Thomas Joseph Development Task #3673: Parts list Review 1:00 In Progress Thomas Joseph GW 2.2 25/06/2026 06:00 AM Zarro Integrated - mDAQ Lite Task 26 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
24/06/2026 Thomas Joseph Development Task #3685: Procurement Review 1:00 In Progress Thomas Joseph GW 2.2 25/06/2026 05:59 AM Zarro Integrated - mDAQ Lite Task 26 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
24/06/2026 Thomas Joseph Development Task #3218: Design of Enclosure Graphics(Sticker/Screenprint) Review 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 05:58 AM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Review of 1.3mm dimensional error 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 06:07 AM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Review and Release for fabrication 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 06:39 PM GW 2.2 - GW 2.2 Design Task 25 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Design review and Connector PCB release 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 06:31 PM GW 2.2 - GW 2.2 Design Task 25 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/06/2026 Thomas Joseph Development Task #3678: Customer requirements Customer discussion : scope clarification 1:30 In Progress Thomas Joseph GW 2.2 25/06/2026 06:17 AM Zarro Integrated - mDAQ Lite Task 25 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
09/06/2026 Thomas Joseph Enquiry Task #3680: Project Planning and Review Sensor review and clarification with customer 1:30 In Progress Thomas Joseph GW 2.2 26/06/2026 05:41 PM Zarro Integrated - mDAQ Lite Task 24 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
09/06/2026 Thomas Joseph Enquiry Task #3222: Project Planning and Review GW2.2 Costing discussion 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 05:38 PM Task 24 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/06/2026 Thomas Joseph Development Task #3680: Project Planning and Review Delivery plan review, Clarification email 1:00 In Progress Thomas Joseph GW 2.2 26/06/2026 05:25 PM Zarro Integrated - mDAQ Lite Task 24 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
05/06/2026 Dhanasekar T Design Task #3674: Panel Design Panel design updated for all dimensions 1:00 In Progress Dhanasekar T GW 2.2 05/06/2026 06:53 AM Zarro Integrated - mDAQ Lite Task 23 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
04/06/2026 Thomas Joseph Development Task #3149: Enclosure fabrication Step file review for fabrication 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 26/06/2026 05:12 PM Task 23 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
03/06/2026 Thomas Joseph Design Task #3680: Project Planning and Review Delivery plan 1:00 In Progress Thomas Joseph GW 2.2 26/06/2026 04:50 PM Zarro Integrated - mDAQ Lite Task 23 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
03/06/2026 Dhanasekar T Design Task #3674: Panel Design Panel layout created 1:00 In Progress Dhanasekar T GW 2.2 03/06/2026 04:22 PM Zarro Integrated - mDAQ Lite Task 23 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
03/06/2026 Dhanasekar T Documentation Task #3673: Parts list Parts list created 2:00 In Progress Dhanasekar T GW 2.2 03/06/2026 03:07 PM Zarro Integrated - mDAQ Lite Task 23 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
03/06/2026 Thomas Joseph Development Task #3678: Customer requirements CRS 1:00 In Progress Thomas Joseph GW 2.2 03/06/2026 11:18 AM Zarro Integrated - mDAQ Lite Task 23 26/06/2026 01/06/2026 Mallikarjuna, Dhanasekar, Thomas Joseph, Venumadhav, Resmi 5 Actions
26/05/2026 Thomas Joseph Development Task #3045: Detailed Design Design Sign-off review and gerber release 2:30 Analysis Started Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 05:33 AM GW 2.2 - GW 2.2 Design Task 22 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/05/2026 Resmi K.V Design Task #3195: Design of Enclosure Cutouts Created Stepfile for Enclosure with stacked PCBs and relaeased Gerber for PCB fabrication. 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 26/05/2026 01:34 PM GW 2.2 - GW 2.2 Design Task 22 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/05/2026 Thomas Joseph Design Task #3195: Design of Enclosure Cutouts PCB Integration Review 3:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 05:17 AM GW 2.2 - GW 2.2 Design Task 21 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/05/2026 Resmi K.V Design Task #3195: Design of Enclosure Cutouts Mechanical design 4:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 21/05/2026 09:48 AM GW 2.2 - GW 2.2 Design Task 21 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/05/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Design review 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 05:10 AM GW 2.2 - GW 2.2 Design Task 21 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
15/05/2026 Thomas Joseph Development Task #3191: PCB Design PLCIO Design review 2:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 04:48 AM GW 2.2 - GW 2.2 Design Task 20 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
29/04/2026 Channamallikarjuna Mattihalli Bug fixes Task #2952: Embedded SW-Development Device is running in the client place 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 29/04/2026 04:26 AM Task 18 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/04/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals monitoring the device continue data posting. 8:00 In Progress Jagatheswaran J Chola Turbo 09/04/2026 12:35 PM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
07/04/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals monitoring the device continue data posting. 8:00 In Progress Jagatheswaran J Chola Turbo 07/04/2026 12:52 PM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
06/04/2026 Channamallikarjuna Mattihalli Development Task #2953: Modbus-TCP Modbus TCP working fine 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 06/04/2026 05:27 AM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
06/04/2026 Channamallikarjuna Mattihalli Development Task #3032: GW2.0 Codebase readiness(Release 1.0) Modbus TCP, RTU, USB and Config packet is working fine 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 06/04/2026 05:25 AM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
31/03/2026 Sumanth D Mechanical Assembly Task #3240: Panel Assembly Manual (for Customer ) labeling 1:00 In Progress Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 31/03/2026 11:47 AM Task 14 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/03/2026 Bhavani M Design Task #3248: PCB Design PCB Design 1:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 27/03/2026 02:18 PM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/03/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Order placed 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 27/03/2026 11:54 AM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/03/2026 Dhanasekar T Mechanical Assembly Task #2998: Assembly Assembly completed 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 27/03/2026 11:47 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/03/2026 Bhavani M Design Task #3248: PCB Design PCB designing 8:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 24/03/2026 02:41 PM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/03/2026 Dhanasekar T Procurement Task #3220: PLCIO BoM Component Procurement Paymenr done 0:06 In Progress Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Production 24/03/2026 12:10 PM GW 2.2 - GW 2.2 Design Task 13 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/03/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement TPD2E001DZDR-EOL 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 24/03/2026 12:09 PM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #3220: PLCIO BoM Component Procurement PLCIO BoM component 0:06 In Progress Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Production 23/03/2026 09:03 AM GW 2.2 - GW 2.2 Design Task 13 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement BoM components 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 23/03/2026 09:01 AM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #3003: Mechanical Assembly Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 23/03/2026 08:59 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #2992: Procurement Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 23/03/2026 08:54 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Mechanical Assembly Task #2969: Assembly Mechanical assembly done 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 23/03/2026 08:53 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #2935: Procurement Pilot version procurement completed 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 23/03/2026 08:52 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/03/2026 Channamallikarjuna Mattihalli Bug fixes Bug #3345: 4G Network Reconnection Issue 4G reconnect issue 8:00 In Progress Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 18/03/2026 06:45 AM Bug 12 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Minor Actions
18/03/2026 Channamallikarjuna Mattihalli Bug fixes Bug #3341: 4G does not reconnect after SIM removal and reinsertion. Sim remove and insert back 8:00 Feedback Channamallikarjuna Mattihalli Chola Turbo 18/03/2026 06:39 AM Bug 12 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Minor Actions
17/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports monitoring the device . 8:00 Analysis Started Jagatheswaran J Chola Turbo 18/03/2026 09:27 AM Task 12 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports Monitoring the device 9:00 Analysis Started Jagatheswaran J Chola Turbo 17/03/2026 07:48 AM Task 12 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/03/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing GW2.0 PCB Testing 1:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 16/03/2026 01:25 PM Task 12 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/03/2026 Resmi K.V Design Task #3191: PCB Design Discussion with thomas sir and updating the PCB 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 16/03/2026 01:20 PM GW 2.2 - GW 2.2 Design Task 12 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 13/03/2026 12:21 PM GW 2.2 - GW 2.2 Design Task 11 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Dhanasekar T Procurement Task #2888: Enc Fab Completed 0:06 Resolved Dhanasekar T Gateway V2.1 13/03/2026 12:12 PM Task 11 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
13/03/2026 Channamallikarjuna Mattihalli Design Task #3244: E-REMOS Configuration for mDAQ Functional Testing Done by Devipriya 8:00 In Progress Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 10:00 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3036: Application Integration of AI, DI & DO Done Integration 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:44 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3036: Application Integration of AI, DI & DO Combined the code 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:44 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3043: GW2.0 Codebase readiness(Release 1.0) Gateway V2 - E54 Development done for the following peripherals and Tested 8:00 In Progress Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:42 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3255: Modbus TCP Modbus TCP implemented and tested 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:37 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3255: Modbus TCP Modbus TCP to read PLC data 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:36 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/03/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 9:00 In Progress Thomas Joseph Chola Turbo 18/03/2026 06:14 AM Task 11 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
05/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 05/03/2026 12:37 PM GW 2.2 - GW 2.2 Design Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
04/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 8:00 Analysis Started Jagatheswaran J Chola Turbo 06/03/2026 07:18 AM Task 10 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
03/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 6:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 03/03/2026 11:19 AM GW 2.2 - GW 2.2 Design Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
02/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 02/03/2026 01:21 PM GW 2.2 - GW 2.2 Design Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 27/02/2026 01:56 PM GW 2.2 - GW 2.2 Design Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB testing 8:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 27/02/2026 07:13 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 26/02/2026 02:14 PM GW 2.2 - GW 2.2 Design Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/02/2026 Surendra Naik cable assembly Task #3261: RTU Cable for DI, DO, AI cable assembly for RTU 8:00 In Progress Surendra Naik mDAQ4-1(Mid Range mDAQ)-Pilot 26/02/2026 12:24 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 6:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 25/02/2026 11:57 AM GW 2.2 - GW 2.2 Design Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3035: DO Module DO testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 11:55 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3033: AI Module AI testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 11:53 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 06:01 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 05:59 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 7:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 24/02/2026 02:15 PM GW 2.2 - GW 2.2 Design Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 8:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 24/02/2026 02:04 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testing 4:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 24/02/2026 12:57 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 4:00 Analysis Started Jagatheswaran J Chola Turbo 24/02/2026 12:38 PM Task 9 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
23/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 Resolved Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 23/02/2026 01:38 PM GW 2.2 - GW 2.2 Design Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Thomas Joseph Development Task #3248: PCB Design Design review and Support (RKV) 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 20/02/2026 04:05 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Thomas Joseph Development Task #3039: Project Planning and Review Planning and Review(Discussion with Bhavani) 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 04:03 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Thomas Joseph Development Task #3034: DI Module Discussion on plan & review 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 04:01 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB Testing 8:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 02:18 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing Visual Inspection 4:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 02:11 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Bhavani M Design Task #3248: PCB Design Ref des sorting 1:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 20/02/2026 01:55 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Sumanth D Testing Task #3033: AI Module test report 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 09:06 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Sumanth D Testing Task #3034: DI Module testing 5:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 06:56 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Sumanth D Testing Task #3033: AI Module testing 3:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 06:53 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Thomas Joseph Development Task #3033: AI Module Result Analysis 1:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 04:00 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Thomas Joseph Design Task #3191: PCB Design Design review and Support (RKV) 4:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 03:31 PM GW 2.2 - GW 2.2 Design Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions