25/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Review of issues 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 03:57 PM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Review of 1.3mm dimensional error 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 06:07 AM GW 2.2 - GW 2.2 Design Task 26 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Review and Release for fabrication 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 06:39 PM GW 2.2 - GW 2.2 Design Task 25 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/06/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Design review and Connector PCB release 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 26/06/2026 06:31 PM GW 2.2 - GW 2.2 Design Task 25 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/05/2026 Resmi K.V Design Task #3195: Design of Enclosure Cutouts Created Stepfile for Enclosure with stacked PCBs and relaeased Gerber for PCB fabrication. 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 26/05/2026 01:34 PM GW 2.2 - GW 2.2 Design Task 22 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/05/2026 Thomas Joseph Design Task #3195: Design of Enclosure Cutouts PCB Integration Review 3:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 05:17 AM GW 2.2 - GW 2.2 Design Task 21 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
21/05/2026 Resmi K.V Design Task #3195: Design of Enclosure Cutouts Mechanical design 4:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 21/05/2026 09:48 AM GW 2.2 - GW 2.2 Design Task 21 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/05/2026 Thomas Joseph Development Task #3195: Design of Enclosure Cutouts Design review 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 25/06/2026 05:10 AM GW 2.2 - GW 2.2 Design Task 21 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions