Project

General

Profile

Issues

Filters

Apply Clear

Estimated time: 68:00 Spent time: 1282:47

# Project Subject Status Assignee % Done Start date Due date
3245 mTracker(Mid Range GW)-Production Interface PCB Fabrication New Dhanasekar T

16/02/2026 22/02/2026 Actions
3244 mDAQ4-1(Mid Range mDAQ)-Pilot E-REMOS Configuration for mDAQ Functional Testing In Progress DEVI PRIYAA

10/02/2026 10/02/2026 Actions
3243 Chola Turbo Machinery Pvt Ltd ConfigPacket (Split, Delay) In Progress DEVI PRIYAA

26/01/2026 06/02/2026 Actions
3240 mDAQ4-1(Mid Range mDAQ)-Pilot Panel Assembly Manual (for Customer ) In Progress Sumanth D

26/01/2026 30/01/2026 Actions
3239 Chola Turbo Machinery Pvt Ltd Installation Support In Progress Thomas Joseph

30/01/2026 31/03/2026 Actions
3232 mTracker(Mid Range GW)-Pilot Rework Sheet Resolved VenuMadhav S

21/01/2026 23/01/2026 Actions
3228 mDAQ4-1(Mid Range mDAQ)-Production Preliminary Design New Thomas Joseph

12/01/2026 23/01/2026 Actions
3227 mDAQ4-1(Mid Range mDAQ)-Production Enclosure Screen Printing New Dhanasekar T

20/02/2026 28/02/2026 Actions
3224 mDAQ4-1(Mid Range mDAQ)-Production Review/Update of GW2.0 Test Plan and Procedure New VenuMadhav S

18/02/2026 20/02/2026 Actions
3223 mDAQ4-1(Mid Range mDAQ)-Production Test Plan Development and Approvals In Progress Jagatheswaran J

09/02/2026 16/02/2026 Actions
3222 mDAQ4-1(Mid Range mDAQ)-Production Project Planning and Review In Progress Thomas Joseph

05/01/2026 07/03/2026 Actions
3221 mDAQ4-1(Mid Range mDAQ)-Production GW2.0 Codebase readiness(Release 3.0) New DEVI PRIYAA

25/02/2026 25/02/2026 Actions
3220 mDAQ4-1(Mid Range mDAQ)-Production PLCIO BoM Component Procurement In Progress Dhanasekar T

19/01/2026 28/01/2026 Actions
3218 mDAQ4-1(Mid Range mDAQ)-Production Design of Enclosure Graphics(Sticker/Screenprint) New VenuMadhav S

18/02/2026 20/02/2026 Actions
3217 mDAQ4-1(Mid Range mDAQ)-Production Delivery (Phase 2) New Dhanasekar T

13/02/2026 13/02/2026 Actions
3216 mDAQ4-1(Mid Range mDAQ)-Production Customer Demo New Venu Krishnamurthy

10/02/2026 10/02/2026 Actions
3215 mDAQ4-1(Mid Range mDAQ)-Production Hardware Readiness New VenuMadhav S

05/02/2026 05/02/2026 Actions
3214 mDAQ4-1(Mid Range mDAQ)-Production System Testing New Jagatheswaran J

03/03/2026 31/03/2026 Actions
3211 mDAQ4-1(Mid Range mDAQ)-Production PLCIO PCB Electrical Testing New Resmi K.V

03/03/2026 03/03/2026 Actions
3210 mDAQ4-1(Mid Range mDAQ)-Production Testing Analysis Started VenuMadhav S

03/03/2026 31/03/2026 Actions
3209 mDAQ4-1(Mid Range mDAQ)-Production Mechanical Assembly New Dhanasekar T

03/03/2026 03/03/2026 Actions
3208 mDAQ4-1(Mid Range mDAQ)-Production PLCIO PCB Assembly New Dhanasekar T

25/02/2026 03/03/2026 Actions
3207 mDAQ4-1(Mid Range mDAQ)-Production Assembly Manual (Documentation) New VenuMadhav S

19/01/2026 30/01/2026 Actions
3206 mDAQ4-1(Mid Range mDAQ)-Production Parts List(Mech. Assembly) New Dhanasekar T

19/01/2026 30/01/2026 Actions
3205 mDAQ4-1(Mid Range mDAQ)-Production Assembly Analysis Started Dhanasekar T

19/01/2026 03/03/2026 Actions
3204 mDAQ4-1(Mid Range mDAQ)-Production Embedded SW-Development New DEVI PRIYAA

25/02/2026 25/02/2026 Actions
3203 mDAQ4-1(Mid Range mDAQ)-Production E-REMOS Development New

12/02/2026 05/03/2026 Actions
3202 mDAQ4-1(Mid Range mDAQ)-Production Wiring Diagram New VenuMadhav S

17/02/2026 18/02/2026 Actions
3201 mDAQ4-1(Mid Range mDAQ)-Production Product Requirements New Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3200 mDAQ4-1(Mid Range mDAQ)-Production Customer Requirements Finalisation Analysis Started Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3199 mDAQ4-1(Mid Range mDAQ)-Production PLCIO PCB Fabrication In Progress Dhanasekar T

18/02/2026 25/02/2026 Actions
3198 mDAQ4-1(Mid Range mDAQ)-Production Enclosure fabrication New Dhanasekar T

18/02/2026 28/02/2026 Actions
3197 mDAQ4-1(Mid Range mDAQ)-Production Enclosure Procurement New Dhanasekar T

16/02/2026 20/02/2026 Actions
3196 mDAQ4-1(Mid Range mDAQ)-Production Procurement Analysis Started Dhanasekar T

19/01/2026 03/03/2026 Actions
3195 mDAQ4-1(Mid Range mDAQ)-Production Design of Enclosure Cutouts New VenuMadhav S

18/02/2026 20/02/2026 Actions
3192 mDAQ4-1(Mid Range mDAQ)-Production Schematic Design In Progress Thomas Joseph

05/01/2026 11/02/2026 Actions
3191 mDAQ4-1(Mid Range mDAQ)-Production PCB Design In Progress Resmi K.V

02/02/2026 17/02/2026 Actions
3189 mDAQ4-1(Mid Range mDAQ)-Production Design and Development of PLCIO PCB In Progress Thomas Joseph

05/01/2026 17/02/2026 Actions
3181 Customer RMA, AMC & SERVICE OCCK-019 unit update In Progress Jagatheswaran J

21/01/2026 Actions
3180 Customer RMA, AMC & SERVICE PREFECT EIDOS - 3 Units Testing started Dhanasekar T

06/01/2026 Actions
3179 mDAQ4-1(Mid Range mDAQ)-Pilot Design of Enclosure Graphics(Sticker/Screenprint) Resolved VenuMadhav S

20/01/2026 21/01/2026 Actions
3178 mDAQ4-1(Mid Range mDAQ)-Pilot Enclosure Procurement Resolved Dhanasekar T

16/01/2026 20/01/2026 Actions
3172 mTracker(Mid Range GW)-Pilot USB Factory Configuration In Progress DEVI PRIYAA

19/01/2026 20/01/2026 Actions
3169 mDAQ4-1(Mid Range mDAQ)-Pilot Design and Development of SIM Holder PCB Resolved Surendra Naik

22/01/2026 22/01/2026 Actions
3168 mDAQ4-1(Mid Range mDAQ)-Pilot USB Configuration Tool(Revision) New

Actions
3167 mTracker(Mid Range GW)-Pilot USB Configuration Tool(Revision) New DEVI PRIYAA

19/01/2026 20/01/2026 Actions
3166 mTracker(Mid Range GW)-Production N58 Integration Resolved DEVI PRIYAA

29/01/2026 03/02/2026 Actions
3164 mTracker(Mid Range GW)-Production PCB Design In Progress VenuMadhav S

20/01/2026 11/02/2026 Actions
3163 mTracker(Mid Range GW)-Production Schematic Design In Progress Bhavani M

19/01/2026 19/01/2026 Actions
3162 mDAQ4-1(Mid Range mDAQ)-Pilot Programming Model Update Resolved Sumanth D

19/01/2026 20/01/2026 Actions
3161 mTracker(Mid Range GW)-Pilot Programming Model Update In Progress VenuMadhav S

19/01/2026 19/01/2026 Actions
3160 CABS-VPX SBC Project Planning and Review Analysis Started Thomas Joseph

05/09/2025 30/04/2026 Actions
3159 mDAQ4-1(Mid Range mDAQ)-Pilot PLCIO Interface Cable Resolved Surendra Naik

19/01/2026 19/01/2026 Actions
3158 mDAQ4-1(Mid Range mDAQ)-Pilot D-Sub 25 Cable Preparation Resolved Sumanth D

19/01/2026 22/01/2026 Actions
3157 mDAQ4-1(Mid Range mDAQ)-Pilot GW2.0 PCB Testing In Progress Bhavani M

19/01/2026 20/02/2026 Actions
3156 mDAQ4-1(Mid Range mDAQ)-Pilot Hardware Setup readiness for software development Resolved Dhilip Kumar R

19/01/2026 21/01/2026 Actions
3155 mTracker(Mid Range GW)-Production Design and Development of Interface PCB In Progress VenuMadhav S

02/02/2026 14/02/2026 Actions
3154 mTracker(Mid Range GW)-Production Design and Development of Controller+4G(N58) PCB In Progress VenuMadhav S

19/01/2026 11/02/2026 Actions
3153 mTracker(Mid Range GW)-Production Design of Enclosure Cutouts New VenuMadhav S

16/02/2026 17/02/2026 Actions
3151 mTracker(Mid Range GW)-Production Procurement Analysis Started Dhanasekar T

05/01/2026 28/02/2026 Actions
3150 mTracker(Mid Range GW)-Production Enclosure Procurement New Dhanasekar T

13/02/2026 13/02/2026 Actions
3149 mTracker(Mid Range GW)-Production Enclosure fabrication New Dhanasekar T

18/02/2026 25/02/2026 Actions
3148 mTracker(Mid Range GW)-Production Controller PCB Fabrication New Dhanasekar T

16/02/2026 22/02/2026 Actions
3147 mTracker(Mid Range GW)-Production Review of Customer Requirements Analysis Started Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3146 mTracker(Mid Range GW)-Production Review of Product Requirements New Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3144 mTracker(Mid Range GW)-Production Wiring Diagram New VenuMadhav S

13/02/2026 17/02/2026 Actions
3143 mTracker(Mid Range GW)-Production E-REMOS Development New

Actions
3142 mTracker(Mid Range GW)-Production Embedded SW-Development New DEVI PRIYAA

29/01/2026 16/02/2026 Actions
3141 mTracker(Mid Range GW)-Production Assembly Analysis Started Dhanasekar T

12/02/2026 03/03/2026 Actions
3140 mTracker(Mid Range GW)-Production Parts List(Mech. Assembly) New Dhanasekar T

12/02/2026 13/02/2026 Actions
3139 mTracker(Mid Range GW)-Production Assembly Manual (Documentation) New VenuMadhav S

16/02/2026 20/02/2026 Actions
3138 mTracker(Mid Range GW)-Production Interface PCB Assembly New Surendra Naik

23/02/2026 24/02/2026 Actions
3137 mTracker(Mid Range GW)-Production Mechanical Assembly In Progress Dhanasekar T

02/03/2026 03/03/2026 Actions
3136 mTracker(Mid Range GW)-Production Testing Analysis Started VenuMadhav S

16/02/2026 31/03/2026 Actions
3135 mTracker(Mid Range GW)-Production Interfcae PCB Electrical Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3134 mTracker(Mid Range GW)-Production AI Performance Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3133 mTracker(Mid Range GW)-Production DI Performance Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3132 mTracker(Mid Range GW)-Production System Testing New Jagatheswaran J

02/03/2026 31/03/2026 Actions
3131 mTracker(Mid Range GW)-Production Hardware Readiness New VenuMadhav S

05/02/2026 05/02/2026 Actions
3130 mTracker(Mid Range GW)-Production Customer Demo (Phase 2) New Venu Krishnamurthy

10/02/2026 10/02/2026 Actions
3129 mTracker(Mid Range GW)-Production Delivery (Phase 2) New Dhanasekar T

13/02/2026 13/02/2026 Actions
3127 mTracker(Mid Range GW)-Production Design of Enclosure Graphics(Sticker/Screenprint) New VenuMadhav S

16/02/2026 17/02/2026 Actions
3126 mTracker(Mid Range GW)-Production Controller PCB BoM Resolved Resmi K.V

09/02/2026 11/02/2026 Actions
3125 mTracker(Mid Range GW)-Production GW BoM Component Procurement In Progress Dhanasekar T

19/01/2026 20/02/2026 Actions
3124 mTracker(Mid Range GW)-Production GW2.0 Codebase readiness(Release 2.0) New DEVI PRIYAA

02/02/2026 16/02/2026 Actions
3120 mTracker(Mid Range GW)-Production Project Planning and Review In Progress Thomas Joseph

05/01/2026 06/03/2026 Actions
3119 mTracker(Mid Range GW)-Production Test Plan Development and Approvals New Jagatheswaran J

16/02/2026 23/02/2026 Actions
3118 mTracker(Mid Range GW)-Production Review/Update of GW2.0 Test Plan and Procedure New VenuMadhav S

23/02/2026 25/02/2026 Actions
3117 mTracker(Mid Range GW)-Production GW2.2 Functional Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3115 mTracker(Mid Range GW)-Production Enclosure Screen Printing New Dhanasekar T

18/02/2026 25/02/2026 Actions
3071 Chola Turbo Machinery Pvt Ltd Enclosure Screen Printing Resolved Dhanasekar T

06/01/2026 16/01/2026 Actions
3070 mTracker(Mid Range GW)-Pilot Enclosure Screen Printing Resolved Dhanasekar T

06/01/2026 16/01/2026 Actions
3069 mTracker(Mid Range GW)-Production Preliminary Design In Progress Thomas Joseph

12/01/2026 23/01/2026 Actions
3065 Gateway V2.1 Routing Review New Bhavani M

09/01/2026 31/03/2026 Actions
3064 Gateway V2.1 Placement Review WiFi_4G PCB New Bhavani M

09/01/2026 Actions
3063 Gateway V2.1 Placement Review Controller PCB In Progress Bhavani M

09/01/2026 Actions
3062 Gateway V2.1 Connector PCB Routing Resolved Bhavani M

09/01/2026 Actions
3061 Gateway V2.1 WiFi_4G PCB Routing In Progress Bhavani M

09/01/2026 Actions
3060 Gateway V2.1 Controller PCB Routing In Progress Bhavani M

09/01/2026 Actions
3059 Gateway V2.1 PCB Design modification of WiFi_4G PCB In Progress Bhavani M

09/01/2026 Actions
(101-200/377)

Also available in: CSV PDF Atom