Task #3392
openProject Planning and Review
Added by Thomas Joseph 6 months ago. Updated 4 months ago.
20%
Updated by Thomas Joseph 6 months ago
Actions
#1
Discussed Today
-
What is the turn-around time for acquisition 22Ksps (acq. 120ms- transfer 6ms-1sec) - LAN / Switch
-
Acq. duration - what is the max. memory size ( 100MB ) / Ping-Pong (linker, attribute) or circular buffer (head and tail)
-
Sync. rpm - configuration through USB or GUI ? (polar plot, phase analysis) GPIO Triggerring of DMA (Dynamic in GUI), add in first packet
-
Sync. in / out
5.Timed Acquisition -
Persistancy ? => NVM storage
-
RTS/CTS - Backpressure (scanning ) application controlling the data transfer
-
Assembly for 10 units - projection for next 3 months (Vinay will share exact ...)
-
AI PCB of Gateway - PLCIO => (Tracker not)
-
One SAM and two boards daisy chain (DMA config) or two SAM boards or one board with two SPI => Block diagram
-
Plan for SAM/replacement (anticipated requirement is 20-30, adani 6, BSH, Motherson, Plantiqx)
-
Internal processing - RMS/FFT
Follow-up : 18/03/2026
Updated by Thomas Joseph 6 months ago
Actions
#2
As discussed, please proceed with 3386, 3391, 3381
Updated by Thomas Joseph 6 months ago
Actions
#3
- Status changed from New to In Progress
- % Done changed from 0 to 20
Updated by Thomas Joseph 6 months ago
Actions
#4
Discussion with Jiban
- peak and peak-peak
user selectable Calculation window, display like RMS - use channel name in all legends
- add marker points, save in the same datastes under [Marker], reload for later analysis. add Marker view tab
- temperature
discuss with Mohan and decide protocol. this will not be interleaved with vibration data streaming
do the protocol processing
for GUI rendering, do some study. preferred to display along with vibration plots
temp. will stored separately of along with vib. raw data and temp channel - Alert
a. Set thresholds
b. storage of threasholds in a table as like raw data
c. thresholds will be displayed along with incoming data
d. threasholds will be separate for each plot
e. provide a Alert view tab
Updated by Thomas Joseph 5 months ago
Actions
#5
BSH Plan added
CRS prepared - review requested
Updated by Thomas Joseph 5 months ago
Actions
#6
Project review and internal demo (Mohan, Jiban, Venumadhav, Thomas)
Crashed once -identify the reason and resolve
Acq. Count - add label, infinite acq => 0
Acq. Duration - to be in ms, update in GUI
Acq. Duration - to be in second
Trigger - rising edge to start acq. and falling edge to stop acq.
Pulse count - to be implemented
Acq. Count no to be displayed in the status bar
UDP connection live checking to be implemented
performance check with LAN - to do with two devices
S time missing with long trigger - FFT to data ploting
A time - arrival time definition
Configuration is onetime until a new configuration is sent
Pulse trigger - does not require acq. count
Define the LED status (4 LEDs) in a table
Power on or / bootup on all LEDs
power status - implemented
UDP live
data posting ok/failed
acq. failed
trigger status
Connection live to be tested.
Connection should restore after a reconnection
USB Connection should be asynchronous, does not require a command from VAS software - discus with Greeshma
Acq. interval and duration - not functioning as per the value and unit
Peakdetection
Threshold - add delete option
colour option for different channel
Threshold - shouldnot be tabbed => Channel no. to be in the table
Updated by VenuMadhav S 5 months ago
Actions
#7
- Face Plate Design.
- Panel Assembly.
- mDAQ3(V1.1) PCB Testing.
Updated by Jiban Munda 5 months ago
Actions
#8
- Create new Threshold setting UI
- Modify new Device View UI
- Save Temperature data in file
- Test and correct app's connection indicator/status
Updated by Thomas Joseph 4 months ago
Actions
#9
For ISTRAC
Installation and Troubleshooting guide
software op. manual
steel mirror in the panel for LED visibility
Detailed sketch
Panel mounting options
Software stability
For BSH
Testing of Boost module
Testing of MiniPC
Updated by Thomas Joseph 4 months ago
Actions
#10
Parts List review and Procurement status
- keep mDAQ3 parts list separate, mDAQ3 BoM separate, Add revision history in these
- For ISTRAC only Panel and accessories, add revision history
- Faceplate version , 1.0 (for mDAQ3 1.0), v1.1(for mDAQ3 1.1)
- mDAQ3 readiness - 12/05/2026
- Panel box - 11/05/2026
- Order multispan SMPS - 11/05/2026
- Update cable gland based on cable size and qty
- Thermal sensor - 12/05/2026 Fedex
- Panel mounting provisios - hanging / clamp / back plate
- Update panel drawing
- update parts list (mDAQ3 BoM, mDAQ3, Requirements, Panel and Accessories for ISTRAC => 3 docs)
- Complete procurement by 12/06/2026
Updated by Thomas Joseph 4 months ago
Actions
#11
mDAQ3 Testing
Test as per board bring-up TPP
power consumption (important) - ======update in Test report and share
SPI signal waveforms during data acquisition - buy probes + extra with caps
LED - =======tested
Trigger testing -========= create table of test and conduct test and share result (Rise time/fall time also)
DI/ DO - ======create table of test and conduct test and share result (Rise time/fall time , min volt, load, level, etc)
TPP for Signal quality " VAS_TPP_20260512_1"
========Offset in Time series and Spectrogram add columns in #3
Network connection/disconnection
continuous data acq. for 12+ hours
(fs = 5000, dur = 0.1, int. = 5 sec, f_in = 500Hz, 4V),
test boards parallelly w/o signal
Status
=========3 - board completed, two boards handed over
==========1 board over current
=======1 board to test
I/f PCB
5 PCBs fabed
=========2 PCB assembled, test with 1.5 also - Plug-in connector pending for RS232(4-pin), AI(6-pin)
complete remaining 3 PCBs
Enclosure
5 nos in stock
faceplate - 3pairs in stock,
======ordered 2 pairs
Sticker/Screen printing
Graphics to design - Dhilip
Enclosure top & faceplate - photos,
add info on photo in excel,
Elpis logo, product no, product name add,
faceplate - all interfaces in mnemonic
Review - with Venu sir
Sticker - non-transparent - to order (URGENT)
=======Share sticker design in excel
mDAQ Calibration internal and external ======= TJ
ADC to g mapping ========== TJ
DC Coupling- ============= TJ
Temp sensor - CRD or CV=============== TJ
=====temp sensor Test plan with reference accurate thermometer
=======Mohan to test with 4-20mA test setup
Additionally
====Rework sheet => U27, U29, footprint is SOT23-5, TSSOP is device New part is 74LVC18
===========Offset 4 x 106. Why Jumper cap not inserted
==========Test LAN cable with file transfer and then use in VAS
=======mDAQ3 mounting bracket in panel