Project

General

Profile

Actions

Task #3209

open

Task #3205: Assembly

Mechanical Assembly

Task #3209: Mechanical Assembly

Added by Thomas Joseph 8 months ago. Updated 2 months ago.

Status:
In Progress
Priority:
Normal
Assignee:
Target version:
Start date:
03/03/2026
Due date:
03/03/2026 (about 6 months late)
% Done:

70%

Estimated time:
Spent time:

Updated by Thomas Joseph 8 months ago Actions #1

  • Parent task set to #3205

Updated by Thomas Joseph 7 months ago Actions #2

  • Due date set to 03/03/2026
  • Status changed from In Progress to New
  • Start date set to 03/03/2026

Updated by Thomas Joseph 3 months ago Actions #3

  • Target version set to GW 2.2 Design

Updated by Thomas Joseph 2 months ago Actions #4

  • Status changed from New to In Progress
  • % Done changed from 0 to 70

Enclosure step file mismatch of 1.3mm noticed
aslo lid mismatch with base

fabricator took measurement from opposite edge, hence more error in the enclosure mounting hole. needd to trim one end of PCB

To assemble, three options

  1. 50mm bolt and nylon clear hole spacers (16mm , 20mm)
  2. threaded spacer(16mm female-female, 20mm male-female)
  3. threaded spacer(16mm female-female) 25mm bolt, 20mm nylon clear hole spacer

Decided 50mm bolt. Bought 60mm bolt. need to trim and use

Actions

Also available in: PDF Atom