Project

General

Profile

Actions

Task #3195

open

Task #3045: Detailed Design

Design of Enclosure Cutouts

Task #3195: Design of Enclosure Cutouts

Added by Thomas Joseph 8 months ago. Updated 2 months ago.

Status:
In Progress
Priority:
Normal
Assignee:
Target version:
Start date:
18/02/2026
Due date:
20/02/2026 (about 7 months late)
% Done:

100%

Estimated time:
Spent time:

Description

Design cut-outs for external interface based on the IO PCB, Connector PCB, LED PCB

Updated by Thomas Joseph 8 months ago Actions #1

  • Parent task set to #3045

Updated by Thomas Joseph 7 months ago Actions #2

  • Due date set to 20/02/2026
  • Start date set to 18/02/2026

Updated by Thomas Joseph 4 months ago Actions #3

  • Assignee changed from VenuMadhav S to Resmi K.V

PLCIO PCB design completed. Enclosure integration evaluation => https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQCoXFFh5Z5aSYLXdFcDqqIoAX2wX3KgrZZr6JDPQMtnhFw?e=MOftSH

@Resmi K.V to update as per review comments

Updated by Resmi K.V 4 months ago Actions #4

  • Status changed from New to In Progress
  • % Done changed from 0 to 50

As per the discussion suggested points are updated and created the step file

  1. Connector changed to PLCIO PCB
  2. Connector PCB moved 1.2mm inward direction for the enclosure to make it inflush with the Enclosure wall
  3. Cutout has been provided for the Connector PCB in the mounting hole position
  4. step file is created with 12 pin external connector in 2 rows.

Autodesk link is: https://autode.sk/4dVJkG3

Updated by Thomas Joseph 4 months ago Actions #5

updated => https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQCdR74m14ofSKU7fRqceiXTAbk9Jy42HwRCBuvpIcW8SYE?e=wAY4QD

@Resmi K.V : Please check all observations, correct, verify w.r.t this doc and then share the link

Updated by Resmi K.V 3 months ago ยท Edited Actions #7

Connector PCB design need to be completed. according to that, need to make the cutouts. Step file created for the stacked PCBs.

Review comments documents has been uploaded in onedrive : https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQCW4KEQ2D5-RI6W3bRLcvcSAQjEfAAxKTQQpp18_8GWNhA?e=wGHWHc

Updated by Thomas Joseph 3 months ago Actions #8

  • Target version set to GW 2.2 Design

Updated by Resmi K.V 2 months ago Actions #9

  • % Done changed from 50 to 100
Actions

Also available in: PDF Atom