Task #3191
openTask #3045: Detailed Design
Task #3189: Design and Development of PLCIO PCB
PCB Design
TJ Updated by Thomas Joseph about 2 months ago
- Parent task set to #3189
TJ Updated by Thomas Joseph about 2 months ago
- Due date changed from 24/01/2026 to 28/01/2026
- Status changed from New to In Progress
- % Done changed from 10 to 0
TJ Updated by Thomas Joseph about 2 months ago
- Assignee set to VenuMadhav S
TJ Updated by Thomas Joseph 28 days ago
- Due date changed from 28/01/2026 to 17/02/2026
- Status changed from In Progress to New
- Assignee changed from VenuMadhav S to Thomas Joseph
- Start date changed from 20/01/2026 to 02/02/2026
Due Date extended
TJ Updated by Thomas Joseph 23 days ago
- Assignee changed from Thomas Joseph to Resmi K.V
import to board (GW2.2 controller), add missing footprints, initiate placements
TJ Updated by Thomas Joseph 23 days ago
- Status changed from New to In Progress
- % Done changed from 0 to 40
RK Updated by Resmi K.V 22 days ago · Edited
- % Done changed from 40 to 60
As per the placement plan created, from the updated schematic all the component are placed except the input connectors. the placement need to review and then will do the final placement and routing.
DSN folder is uploaded in onedrive: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQBKWs8VjfMQQbqIlkOdhwO2AS2EIaV6ctoNABYo5W7N08g?e=9qVLRl
RK Updated by Resmi K.V 21 days ago
- % Done changed from 60 to 70
Schematic updated. and uploaded in onedirve. kindly check it.
DSN folder: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQABw6ez1mgeSYszeM0-PEmMASZwoaR-P6_egVx6UgPEjzE?e=b4KCh6
RK Updated by Resmi K.V 20 days ago
As per the discussion made with Thomas sir, Schematic updated.
1.Daisy chaining is added for DI
2.LDO provided for AI supply.
3.Created netlist and imported to board and all the components are placed.
4.DO section 3 connections are pending.
Updated DSN folder uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQBZGCOz2mF5TqXtTGFt-ZYbATANUBGfBQPTR9cQeYlXbtk?e=ni8oU2
RK Updated by Resmi K.V 13 days ago
Ground in all the sections(AI,DI,DO) seperated.
Back annotation done .
routing is in progress.
Updated Design uploaded in onedrive. https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQCfabk4mw9JRaKyiyXwJGaTASq5y-7WCxtrnrO3CqvhY5Y?e=DBVPFE
RK Updated by Resmi K.V 12 days ago
PCB routing is in progress. Gnd Plane to be discussed with thomas sir.
Updated design uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQCEj3jCUe_wS4lCTlGiNN5zAa13Rh3HOtX7F5vSi4tD4SU?e=F7aktG