Task #3164
openTask #3046: Detailed Design
Task #3154: Design and Development of Controller+4G(N58) PCB
PCB Design
Added by Thomas Joseph about 2 months ago. Updated 22 days ago.
BM Updated by Bhavani M about 2 months ago Actions #1
- % Done changed from 0 to 10
TJ Updated by Thomas Joseph about 2 months ago Actions #2
- Due date changed from 24/01/2026 to 28/01/2026
TJ Updated by Thomas Joseph about 2 months ago Actions #3
- Status changed from New to In Progress
BM Updated by Bhavani M about 1 month ago Actions #4
- % Done changed from 10 to 30
Components Placement was completed. Updated design link was attached.
BM Updated by Bhavani M about 1 month ago Actions #5
BM Updated by Bhavani M about 1 month ago Actions #7
TJ Updated by Thomas Joseph 30 days ago Actions #9
- Due date changed from 28/01/2026 to 11/02/2026
- Assignee changed from Bhavani M to Resmi K.V
- Priority changed from Normal to High
Assigned to Resmi as Bhavani, Venumadhav on leave
RK Updated by Resmi K.V 30 days ago · Edited Actions #10
1. All the needed sections components placed on the PCB
2. connector placement position need to be identified (those are placed outside of the board area)
3. all the unwanted components placed outside the board and created a view as TOP_N_SYM
4. Routing need to be done.
Updated dsn uploaded in onedrive : https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAzS5z1s_B7T4pRcHhn93f1AcBgB-7Qt0jBRzDjC9Q5RD4?e=neNaVM
board file name: GW_V2_2_MCU_20260209_phy_top.brd
RK Updated by Resmi K.V 28 days ago · Edited Actions #11
layout routing started and some components placement also changed for the routing feasibility.
updated design uploaded in onedrive.
dsn folder : https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAifbyztlmDTIOs1XqehupCAZx20C-rWnYUp7hnDw0g5lk?e=cmKOzV
board name: GW_V2_2_MCU_20260211_phy_top.brd