Task #3158
openTask #2998: Assembly
D-Sub 25 Cable Preparation
Added by Thomas Joseph about 2 months ago. Updated 25 days ago.
Description
Prepare 4 cables with female strip header terminated at other end.
This is for use with Test Setup
Files
| Media (11).jpg (539 KB) Media (11).jpg | Surendra Naik, 20/01/2026 06:17 AM | ||
| Media (6).jfif (518 KB) Media (6).jfif | Sumanth D, 21/01/2026 11:34 AM | ||
| Media (7).jfif (395 KB) Media (7).jfif | Sumanth D, 28/01/2026 04:42 AM |
SN Updated by Surendra Naik about 2 months ago Actions #1
- File Media (11).jpg Media (11).jpg added
- Status changed from New to In Progress
- % Done changed from 0 to 30
For testing purposes, a D-sub 25 female connector with wiring is ready.
For delivery purposes, we do not have the cable and connector with PVC duct; we need to purchase them
SD Updated by Sumanth D about 2 months ago · Edited Actions #2
- Status changed from In Progress to New
- Assignee changed from Surendra Naik to Sumanth D
- % Done changed from 30 to 40
Please find the Wiring diagram for preparing D-Sub 25 pin connectors for sensor interface for delivery.
SD Updated by Sumanth D about 2 months ago Actions #3
- Assignee changed from Sumanth D to Surendra Naik
SD Updated by Sumanth D about 2 months ago · Edited Actions #4
- Assignee changed from Surendra Naik to Sumanth D
The above mentioned is for Hydrofab and we cant use this for Core4 project.
Due to lack of cables, to continue testing I used a single 4 core cable for two channels by cutting them into two with shorter length. Existing is of 1mtr length
With this I prepared AI and AV D-sub connector.
For DI and DO tomorrow I will complete.
TJ Updated by Thomas Joseph about 2 months ago · Edited Actions #5
- Due date changed from 19/01/2026 to 21/01/2026
Cable shortage, Due date extended to procure cable and assemble
TJ Updated by Thomas Joseph about 2 months ago Actions #6
- Status changed from New to In Progress
TJ Updated by Thomas Joseph about 2 months ago Actions #7
- Due date changed from 21/01/2026 to 22/01/2026
SD Updated by Sumanth D about 2 months ago Actions #8
- File Media (6).jfif Media (6).jfif added
- % Done changed from 40 to 50
D-Sub cables for testing AI,DI,DO was completed. This is for internal testing only. Once the 4-core cables received, final delivery cables with labeling will be arranged
TJ Updated by Thomas Joseph about 2 months ago Actions #9
The cable end is open. to prevent short circuit, suggest to use female connector at cable end, male at test setup so that device will be protected always
TJ Updated by Thomas Joseph about 2 months ago Actions #10
For the delivery, decide cable length after confirmation from customer
SD Updated by Sumanth D about 1 month ago · Edited Actions #11
- % Done changed from 50 to 70
For testing purpose the D-sub cables were ready.
SD Updated by Sumanth D about 1 month ago Actions #12
- File Media (7).jfif Media (7).jfif added
TJ Updated by Thomas Joseph 25 days ago Actions #13
- Status changed from In Progress to Resolved
- % Done changed from 70 to 100
As part of the updated requirements that AI, DI, DOs not going to use with sensors, and also cable not part of deliverables in PO, this task is resolved