Project

General

Profile

Actions

Task #3154

open
TJ VS

Task #3046: Detailed Design

Design and Development of Controller+4G(N58) PCB

Task #3154: Design and Development of Controller+4G(N58) PCB

Added by Thomas Joseph about 2 months ago. Updated 22 days ago.

Status:
In Progress
Priority:
High
Assignee:
Target version:
-
Start date:
19/01/2026
Due date:
11/02/2026 (28 days late)
% Done:

93%

Estimated time:
(Total: 0:00 h)
Spent time:
2:00 h (Total: 49:00 h)

Description

Modify connector PCB considering the mech and electrical connection with IO PCB


Subtasks 3 (3 open0 closed)

Task #3126: Controller PCB BoMResolvedResmi K.V09/02/202611/02/2026

Actions
Task #3163: Schematic DesignIn ProgressBhavani M19/01/202619/01/2026

Actions
Task #3164: PCB DesignIn ProgressVenuMadhav S20/01/202611/02/2026

Actions
Actions

Also available in: PDF Atom