Task #3120
openProject Planning and Review
Description
For time-sheet reporting purpose ONLY based on email from HR dated 08/01/2026 Subject: Mandatory Submission of Weekly Timesheet
TJ Updated by Thomas Joseph about 2 months ago
- Due date set to 16/02/2026
- Start date set to 05/01/2026
TJ Updated by Thomas Joseph 29 days ago
- % Done changed from 0 to 50
TJ Updated by Thomas Joseph 29 days ago
- Due date changed from 16/02/2026 to 06/03/2026
- % Done changed from 50 to 60
TJ Updated by Thomas Joseph 14 days ago
Discussion with Venumadhav
1. Controller PCB Super Cap mounting - orientation to change
2. Super cap - backup time analisys to do
3. schema - why super cap charging from 5.5V
4. Why RTC VBAT not switching - analysis to do
5. create views and share design folder for renaming
6. after renaming, continue sst placement
7. prepare section-wise costing all 4 PCBs
8. Design PLCIO connector PCB, do step mapping of all PCBs in enclosure - step1 - PLCIO normal orentation, step2 - PLCIO180deg rotated
9. Design of GW2.0 4G PCB with N58 in place of N720
10. assemble platform for GW2.0 with TV3.0 N720 PCB - Surendra to do
11. Order components for board bring-up assembly and mechanical fitment - 5 sets for PLCIO, connector, inerface, controller, enclosure
12. ISRO - List the activities at site, Send Surendra/Dhanasekar for new requirement support(Tracker demo for relay status)