open
TJ GR

Task #2934: Detailed Design

Task #2968: SW-Development

Application Integration

Task #3031: Application Integration

Added by Thomas Joseph 2 months ago. Updated 8 days ago.

Status:
In Progress
Priority:
Normal
Start date:
12/01/2026
Due date:
11/02/2026 (28 days late)
% Done:

90%

Estimated time:

Description

AI , DI , USB, Posting

TJ Updated by Thomas Joseph 2 months ago Actions #1

  • Assignee deleted (Venu Krishnamurthy)

TJ Updated by Thomas Joseph about 2 months ago · Edited Actions #2

  • Due date changed from 19/01/2026 to 21/01/2026

Due date extended to 21/01

Blocked by http://5.161.106.25:3000/issues/3026

TJ Updated by Thomas Joseph about 2 months ago Actions #3

  • Assignee set to DEVI PRIYAA

TJ Updated by Thomas Joseph about 2 months ago Actions #4

  • Due date changed from 21/01/2026 to 23/01/2026

TJ Updated by Thomas Joseph about 1 month ago Actions #5

  • Due date changed from 23/01/2026 to 29/01/2026

TJ Updated by Thomas Joseph about 1 month ago Actions #6

+ E-REMOS configuration for testing

DP Updated by DEVI PRIYAA 30 days ago Actions #7

  • Due date changed from 29/01/2026 to 11/02/2026

Re-assigned to @Greeshma Rayani for this task.

Due extended till 11th Feb.

TJ Updated by Thomas Joseph 30 days ago Actions #8

  • Assignee changed from DEVI PRIYAA to Greeshma Rayani

TJ Updated by Thomas Joseph 28 days ago Actions #9

  • Status changed from New to Resolved
  • % Done changed from 0 to 100

AI, DI integration complete

TJ Updated by Thomas Joseph 28 days ago Actions #10

  • Subject changed from Application Integration of AI & DI to Application Integration
  • Description updated (diff)
  • Status changed from Resolved to In Progress
  • % Done changed from 100 to 80

GR Updated by Greeshma Rayani 26 days ago · Edited Actions #11

With the Config packet issue fix application, data posting is tested.

USB parameter addition need to be done. (Parameter Name: Posting time)

USB issue need to be tested

By giving the inputs need to test AI and DI.

GR Updated by Greeshma Rayani 8 days ago · Edited Actions #12

  • % Done changed from 80 to 90

-> AI/DI/DO modules are tested with the inputs, and it is working with 100khz SPI clock frequency.

-> DO should be handled through the E-Remos.

-> posting time parameter is added and testing in that the data is not updating in the tool with the new binary debugging the issue with Rajendra.