Actions
Task #2991
open
TJ
VS
Task #2985: Detailed Design
Wiring Diagram
Task #2991:
Wiring Diagram
Start date:
06/01/2026
Due date:
23/01/2026 (47 days late)
% Done:
50%
Estimated time:
Actions
Task #2985: Detailed Design
Added by Thomas Joseph 2 months ago. Updated about 2 months ago.
50%
In orcad, use the BD of GW2.0, add LED PCB and IO-USB as a block and show interconnections.
For stacking, use block arrows
Wiring completed. Need to document in ISO template
Due date extended to 23/01/2026