Task #2973
openTask #2969: Assembly
Mechanical Assembly
Added by Thomas Joseph 10 months ago. Updated 9 months ago.
100%
Files
| shared image (13).jpg (357 KB) shared image (13).jpg | Surendra Naik, 22/01/2026 12:53 PM | ||
| shared image (11).jpg (423 KB) shared image (11).jpg | Surendra Naik, 22/01/2026 12:53 PM | ||
| shared image (12).jpg (530 KB) shared image (12).jpg | Surendra Naik, 22/01/2026 12:53 PM | ||
| shared image (15).jpg (258 KB) shared image (15).jpg | Surendra Naik, 22/01/2026 12:56 PM | ||
| shared image (14).jpg (331 KB) shared image (14).jpg | Surendra Naik, 22/01/2026 12:56 PM |
Updated by Thomas Joseph 10 months ago
Actions
#1
- Status changed from New to In Progress
- % Done changed from 0 to 10
Complete IO Assembly, test USB PCB with cable and handover to S/W team for testing (w/o enclosure)
Updated by Thomas Joseph 10 months ago
ยท Edited
Actions
#2
- % Done changed from 10 to 70
One sample unit assembled and evaluated. Identified the issues, updated the design and informed fabricator
refer =>
a. http://5.161.106.25:3000/issues/2947#note-11
b. http://5.161.106.25:3000/issues/2938#note-11
Updated by Dhanasekar T 10 months ago
Actions
#3
- Assignee changed from Dhanasekar T to Surendra Naik
@Surendra Naik ,Please do LED PCB & Mechanical assembly and integrate with enclosure.
Updated by Surendra Naik 10 months ago
Actions
#4
- File shared image (13).jpg shared image (13).jpg added
- File shared image (12).jpg shared image (12).jpg added
- File shared image (11).jpg shared image (11).jpg added
- % Done changed from 70 to 80
I completed the USB PCB assembly, fixed it on the I/O PCB board, placed everything inside the full enclosure, and also arranged a separate debug port.
Updated by Surendra Naik 10 months ago
Actions
#5
- File shared image (14).jpg shared image (14).jpg added
- File shared image (15).jpg shared image (15).jpg added
- % Done changed from 80 to 100
I assembled the LED PCB and fixed it to the top enclosure; the wiring is also good. I fully closed two sets of enclosures with the LED PCB and USB cable and handed them over to Devi Priya for software testing.
Updated by Thomas Joseph 10 months ago
Actions
#6
- Due date changed from 16/01/2026 to 23/01/2026
Final assembly delayed due to delay in http://5.161.106.25:3000/issues/3157#note-4
Updated by Thomas Joseph 10 months ago
Actions
#7
- % Done changed from 100 to 90
Updated by Thomas Joseph 10 months ago
Actions
#8
Updated by Thomas Joseph 9 months ago
Actions
#9
- Due date changed from 23/01/2026 to 28/01/2026
Updated by Thomas Joseph 9 months ago
Actions
#10
- Status changed from In Progress to Resolved
- % Done changed from 90 to 100
02/02/2026
Mech. assembly completed