Project

General

Profile

Actions

Task #2973

open
TJ SN

Task #2969: Assembly

Mechanical Assembly

Task #2973: Mechanical Assembly

Added by Thomas Joseph 2 months ago. Updated 28 days ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
-
Start date:
16/01/2026
Due date:
28/01/2026 (42 days late)
% Done:

100%

Estimated time:
Spent time:

Files

shared image (13).jpg (357 KB) shared image (13).jpg Surendra Naik, 22/01/2026 12:53 PM
shared image (11).jpg (423 KB) shared image (11).jpg Surendra Naik, 22/01/2026 12:53 PM
shared image (12).jpg (530 KB) shared image (12).jpg Surendra Naik, 22/01/2026 12:53 PM
shared image (15).jpg (258 KB) shared image (15).jpg Surendra Naik, 22/01/2026 12:56 PM
shared image (14).jpg (331 KB) shared image (14).jpg Surendra Naik, 22/01/2026 12:56 PM
shared image (13).jpg
shared image (11).jpg
shared image (12).jpg
shared image (15).jpg
shared image (14).jpg

TJ Updated by Thomas Joseph about 2 months ago Actions #1

  • Status changed from New to In Progress
  • % Done changed from 0 to 10

Complete IO Assembly, test USB PCB with cable and handover to S/W team for testing (w/o enclosure)

TJ Updated by Thomas Joseph about 2 months ago ยท Edited Actions #2

  • % Done changed from 10 to 70

One sample unit assembled and evaluated. Identified the issues, updated the design and informed fabricator

refer =>

a. http://5.161.106.25:3000/issues/2947#note-11
b. http://5.161.106.25:3000/issues/2938#note-11

DT Updated by Dhanasekar T about 2 months ago Actions #3

  • Assignee changed from Dhanasekar T to Surendra Naik

@Surendra Naik ,Please do LED PCB & Mechanical assembly and integrate with enclosure.

SN Updated by Surendra Naik about 2 months ago Actions #4

shared image (13).jpg
shared image (12).jpg
shared image (11).jpg

I completed the USB PCB assembly, fixed it on the I/O PCB board, placed everything inside the full enclosure, and also arranged a separate debug port.

SN Updated by Surendra Naik about 2 months ago Actions #5

shared image (14).jpg
shared image (15).jpg

I assembled the LED PCB and fixed it to the top enclosure; the wiring is also good. I fully closed two sets of enclosures with the LED PCB and USB cable and handed them over to Devi Priya for software testing.

TJ Updated by Thomas Joseph about 2 months ago Actions #6

  • Due date changed from 16/01/2026 to 23/01/2026

Final assembly delayed due to delay in http://5.161.106.25:3000/issues/3157#note-4

TJ Updated by Thomas Joseph about 2 months ago Actions #7

  • % Done changed from 100 to 90

TJ Updated by Thomas Joseph about 1 month ago Actions #9

  • Due date changed from 23/01/2026 to 28/01/2026

TJ Updated by Thomas Joseph 28 days ago Actions #10

  • Status changed from In Progress to Resolved
  • % Done changed from 90 to 100

02/02/2026

Mech. assembly completed

Actions

Also available in: PDF Atom