Project

General

Profile

Actions

Task #2973

open

Task #2969: Assembly

Mechanical Assembly

Task #2973: Mechanical Assembly

Added by Thomas Joseph 10 months ago. Updated 9 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
-
Start date:
16/01/2026
Due date:
28/01/2026 (about 9 months late)
% Done:

100%

Estimated time:
Spent time:

Files

shared image (13).jpg (357 KB) shared image (13).jpg Surendra Naik, 22/01/2026 12:53 PM
shared image (11).jpg (423 KB) shared image (11).jpg Surendra Naik, 22/01/2026 12:53 PM
shared image (12).jpg (530 KB) shared image (12).jpg Surendra Naik, 22/01/2026 12:53 PM
shared image (15).jpg (258 KB) shared image (15).jpg Surendra Naik, 22/01/2026 12:56 PM
shared image (14).jpg (331 KB) shared image (14).jpg Surendra Naik, 22/01/2026 12:56 PM
shared image (13).jpg
shared image (11).jpg
shared image (12).jpg
shared image (15).jpg
shared image (14).jpg

Updated by Thomas Joseph 10 months ago Actions #1

  • Status changed from New to In Progress
  • % Done changed from 0 to 10

Complete IO Assembly, test USB PCB with cable and handover to S/W team for testing (w/o enclosure)

Updated by Thomas Joseph 10 months ago ยท Edited Actions #2

  • % Done changed from 10 to 70

One sample unit assembled and evaluated. Identified the issues, updated the design and informed fabricator

refer =>

a. http://5.161.106.25:3000/issues/2947#note-11
b. http://5.161.106.25:3000/issues/2938#note-11

Updated by Dhanasekar T 10 months ago Actions #3

  • Assignee changed from Dhanasekar T to Surendra Naik

@Surendra Naik ,Please do LED PCB & Mechanical assembly and integrate with enclosure.

Updated by Surendra Naik 10 months ago Actions #4

shared image (13).jpg
shared image (12).jpg
shared image (11).jpg

I completed the USB PCB assembly, fixed it on the I/O PCB board, placed everything inside the full enclosure, and also arranged a separate debug port.

Updated by Surendra Naik 10 months ago Actions #5

shared image (14).jpg
shared image (15).jpg

I assembled the LED PCB and fixed it to the top enclosure; the wiring is also good. I fully closed two sets of enclosures with the LED PCB and USB cable and handed them over to Devi Priya for software testing.

Updated by Thomas Joseph 10 months ago Actions #6

  • Due date changed from 16/01/2026 to 23/01/2026

Final assembly delayed due to delay in http://5.161.106.25:3000/issues/3157#note-4

Updated by Thomas Joseph 10 months ago Actions #7

  • % Done changed from 100 to 90

Updated by Thomas Joseph 9 months ago Actions #9

  • Due date changed from 23/01/2026 to 28/01/2026

Updated by Thomas Joseph 9 months ago Actions #10

  • Status changed from In Progress to Resolved
  • % Done changed from 90 to 100

02/02/2026

Mech. assembly completed

Actions

Also available in: PDF Atom