Task #2915

open
SV NK

Task #2941: Detailed Design

Task #3053: GUI Design and Development

EREMOS Development

Task #2915: EREMOS Development

Added by Sunder Venugopal 2 months ago. Updated 29 days ago.

Status:
In Progress
Priority:
Normal
Assignee:
Target version:
-
Start date:
02/01/2026
Due date:
26/01/2026 (44 days late)
% Done:

80%

Estimated time:
Spent time:

Description

OEE Customisation Dev


Related issues 1 (1 open0 closed)

Follows Chola Turbo Machinery Pvt Ltd - Task #2957: Customer Requirements FinalisationResolvedSunder Venugopal16/12/202517/12/2025

Actions

SV Updated by Sunder Venugopal 2 months ago Actions #1

  • Precedes Task #2917: System Test Results and Reports added

TJ Updated by Thomas Joseph 2 months ago Actions #2

  • Parent task set to #2941

SV Updated by Sunder Venugopal 2 months ago Actions #4

  • Due date changed from 09/01/2026 to 25/12/2025
  • Start date changed from 02/01/2026 to 18/12/2025
  • Follows Task #2957: Customer Requirements Finalisation added

VS Updated by VenuMadhav S 2 months ago Actions #5

  • Due date changed from 25/12/2025 to 09/01/2026
  • Start date changed from 18/12/2025 to 02/01/2026

E-Remos Dashboard has to be ready with all parameters as per the customer requirement

1. Wireframes shared by chola(Refer Email).
2. GatewayV2.0 Device Integration with E-Remos.

TJ Updated by Thomas Joseph 2 months ago Actions #6

  • Parent task changed from #2941 to #3053

VS Updated by VenuMadhav S about 2 months ago Actions #7

Sunder Sir, Has to re assign to Neha.

SV Updated by Sunder Venugopal about 2 months ago Actions #8

  • Due date changed from 09/01/2026 to 21/01/2026
  • Start date changed from 02/01/2026 to 14/01/2026

SV Updated by Sunder Venugopal about 2 months ago Actions #9

  • Due date changed from 21/01/2026 to 25/12/2025
  • Start date changed from 14/01/2026 to 18/12/2025

TJ Updated by Thomas Joseph about 2 months ago Actions #10

  • Assignee changed from Sudhakar Chakravarthi to Neha K

Assigned to Neha

VS Updated by VenuMadhav S about 2 months ago · Edited Actions #11

  • % Done changed from 0 to 50

1. Neha: Due date has to update by EOD. Neha wants to discuss with Frontend team.
2. E-REMOS Screenshots has to share. which includes(Parameters, Trends, email reports selection), Discuss with front end and date has to update by EOD.

TJ Updated by Thomas Joseph about 2 months ago · Edited Actions #12

  • Due date changed from 25/12/2025 to 16/01/2026
  • Status changed from Analysis Started to In Progress
  • Start date changed from 18/12/2025 to 02/01/2026

14/01/2026

Frontend work is estimated to take 5 working days
Backend tasks are expected to be completed by Monday (first half); however, I will try to complete it by Friday EOD.

If a time-interval selection is required for the report configuration UI, it may take an additional 1–2 days, which would extend the timeline.

Due date extended to 16/01/2026 based on work progress

TJ Updated by Thomas Joseph about 2 months ago Actions #13

1. VV/Samee to share the screenshots of trends graph, dhashboard

TJ Updated by Thomas Joseph about 2 months ago Actions #15

Comments from @Sunder Venugopal over Teams

1. The parameter values 0, need some standard values
2. The grouping to be implemented as discussed with App team Samee/Neha
3. Trend graphs needs some values to depict a meaning for the customer to understand
4. Section 5.1 incomplete . need to show all the groupings in separate windows
5. Section 5.2 incomplete. All trend graphs per the requirements needs to be shown. Show with dummy trends/ simulated values
6. Section 8. pdf is a blank document.
7. The customer specifically wanted multi parameter trend graph , this is missing

TJ Updated by Thomas Joseph about 2 months ago Actions #17

Dashboard - Screens and formats => https://elpisit-my.sharepoint.com/:b:/g/personal/satish_sl_elpisitsolutions_com/IQC5I5aC4i2bTo8aQ4AdfM_6Aa5mzyk8oAuNiZ_HtkF22Q8?e=lNOHgc

Shared with customer through email:

From: Sunder Venugopal <>
Sent: Wednesday, January 21, 2026 4:02 PM
To: METHESH <>
Subject: Chola Customer Screen (Subject Modified )

TJ Updated by Thomas Joseph about 1 month ago Actions #18

  • Due date changed from 16/01/2026 to 26/01/2026
  • % Done changed from 50 to 80

Due date extended
Demo conducted on 24th. All features implemented except trend graph with multiple parameters on Y-axis

TJ Updated by Thomas Joseph about 1 month ago Actions #19

  • Precedes deleted (Task #2917: System Test Results and Reports )

TJ Updated by Thomas Joseph 29 days ago Actions #20

06/02/2026

Sample Report format shared with customer => https://elpisit-my.sharepoint.com/:b:/g/personal/satish_sl_elpisitsolutions_com/IQB08nSLrUtVQLCaJyEClhUrAc31YvNWk3e8GrahBgw8Rr0?e=2eoWAZ

From: Venu <>
Sent: Friday, February 6, 2026 2:44 PM
To: METHESH <>;
Subject: Re: New requirements and clarifications

TJ Updated by Thomas Joseph 29 days ago Actions #22

two different parameter names:

Active Energy Imported_KWH
Active Energy Exported_KWH

Additionally, the following parameters are not present in the reports:

Voltage L-N Avg
Reactive Power
Apparent Power

Clarification requested (Neha)

TJ Updated by Thomas Joseph 29 days ago Actions #23

10/02/2026

Customer recommendation
a. remove the following tags from the report and dashboard.

Voltage L-N Avg
Reactive Power
Apparent Power

b. add the two tags additional in dashboard and as well as report

Active Energy Imported_KWH
Active Energy Exported_KWH

c. Final PLC Modbus address map => https://elpisit-my.sharepoint.com/:b:/g/personal/satish_sl_elpisitsolutions_com/IQBmDb5XBJKDSIMusD4FaDHAAfIsNaUZWmtUfJ21Od3GDy4?e=4fU34H