Task #2857

open
SV SD

Detailed Design

Task #2857: Detailed Design

Added by Sunder Venugopal 3 months ago. Updated about 1 month ago.

Status:
Feedback
Priority:
Normal
Assignee:
Target version:
-
Start date:
11/11/2025
Due date:
19/12/2025 (about 3 months late)
% Done:

100%

Estimated time:
Spent time:

Description

Schematic Design
PCB Design
PCB Fabrication


Related issues 2 (2 open0 closed)

Precedes TPMS 2-Wheeler - Task #2867: Design Review and ApprovalFeedbackSumanth D22/12/202524/12/2025

Actions
Precedes TPMS 2-Wheeler - Task #2861: PCB Design ReviewFeedbackSumanth D22/12/202524/12/2025

Actions

SV Updated by Sunder Venugopal 3 months ago Actions #1

  • Precedes Task #2867: Design Review and Approval added

SV Updated by Sunder Venugopal 3 months ago Actions #2

SV Updated by Sunder Venugopal 3 months ago Actions #3

  • Due date changed from 02/01/2026 to 19/12/2025

SD Updated by Sumanth D 3 months ago Actions #4

  • Assignee set to Sumanth D

SD Updated by Sumanth D 2 months ago Actions #6

  • Assignee changed from Sumanth D to Bhavani M
  • % Done changed from 70 to 90

SD Updated by Sumanth D 2 months ago Actions #7

PCB power has sent 3 queries and Bhavani is working on it

BM Updated by Bhavani M 2 months ago Actions #8

1. Need to increase 0.16mm top side and decrease 0.16mm bottom
2. With 30 mils trace route VCC vias in power layer
3. Delete VCC plane and add gnd plane in vcc layer
4. Place decoupling cap as per the power in to the IC
5. Decrease solder mask length from 1.5 to 1.2mm
6. Added a pull down resistor

SD Updated by Sumanth D 2 months ago Actions #9

  • Assignee changed from Bhavani M to Resmi K.V

PCB Design

RK Updated by Resmi K.V 2 months ago Actions #10

1.As per the given inputs (mentioned above by Bhavani)updated the PCB of 2 wheeler.
2. Panel updated with the updated board file
3. Gerber Created and shared to Sumanth for reviewing.

SD Updated by Sumanth D about 2 months ago Actions #11

  • Assignee changed from Resmi K.V to Sumanth D
  • % Done changed from 90 to 100

Fabricated PCB received on 19/1/2026

SD Updated by Sumanth D about 2 months ago Actions #12

  • Status changed from In Progress to Resolved

SD Updated by Sumanth D about 1 month ago Actions #13

  • Status changed from Resolved to Feedback