Estimated time: 878:00 Spent time: 3541:07

# Project Subject Status Assignee % Done Start date Due date Target version
3749 VAS Product Release 2.0 rpm capture In Progress Shiva Leela

05/08/2026 14/08/2026 VAS Product Release 2.0 - Future Actions
3748 GW 2.2 Power Board Customisation and Testing In Progress

31/07/2026 07/08/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3747 L21 Platform Pre-Installation Visit Analysis Started Surendra Naik

07/08/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3744 L21 Platform Project Planning and Review Analysis Started Venu Krishnamurthy

01/07/2026 15/08/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3742 L21 Platform Tracker Assembly In Progress

02/08/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3741 VAS Product Release 2.0 Post Installation Service In Progress Thomas Joseph

15/06/2026 31/12/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3740 Flipkart CRM Project Planning and Review In Progress Sumanth D

28/07/2026 22/08/2026 Actions
3739 VAS Product Release 2.0 Application Software - Updates New Jiban Munda

30/07/2026 VAS Product Release 2.0 - Adani Dredger Actions
3738 VAS Product Release 2.0 Preliminary Design New Thomas Joseph

30/07/2026 VAS Product Release 2.0 - Adani Dredger Actions
3737 VAS Product Release 2.0 Customer Requirement Finalysation New Mohan Kashyap

30/07/2026 VAS Product Release 2.0 - Adani Dredger Actions
3736 Flipkart CRM Enclosure Fabrication and Screen printing New

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3735 Flipkart CRM Enclosue Design Analysis Started

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3734 Flipkart CRM Field Trial New

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3733 Flipkart CRM PCB Electrical Testing and Bring-up New

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3732 Flipkart CRM PCB Assembly New

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3731 Flipkart CRM PCB Fabrication New

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3730 Flipkart CRM PCB Design New Bhavani M

30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3729 Flipkart CRM Schematic Design New Bhavani M

30/07/2026 31/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3728 Flipkart CRM Preliminary Design In Progress Thomas Joseph

30/07/2026 30/07/2026 Flipkart CRM - NTC Converter Production Design and Development Actions
3727 Common Engineering KT Telematics Faulty Device From Customer New Sumanth D

20/07/2026 Actions
3726 Ad-Hoc Design and Development Mumbai-Expo-July-2026 Analysis Started Sumanth D

10/07/2026 17/07/2026 Actions
3719 L21 Platform Project Planning and Review Analysis Started Thomas Joseph

03/07/2026 14/08/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3718 L21 Platform System Testing New Checkpoint-Test

27/07/2026 05/08/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3717 L21 Platform Mechanical Assembly New Surendra Naik

20/07/2026 31/07/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3716 L21 Platform Procurement Analysis Started Dhanasekar T

03/07/2026 20/07/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3715 L21 Platform Parts List Analysis Started Dhanasekar T

03/07/2026 10/07/2026 L21 Platform - Checkpoint-Cutter Machine Actions
3714 GW 2.2 System Testing New Chetan Hugar

23/07/2026 24/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3713 GW 2.2 RPM and TAH Analysis Started Channamallikarjuna Mattihalli

08/07/2026 10/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3707 VAS Product Release 2.0 Post Delivery bug fixing In Progress Jagatheswaran J

24/06/2026 29/06/2026 VAS Product Release 2.0 - BSH Actions
3706 Ad-Hoc Design and Development Flipkart - Cold room monitoring In Progress Sumanth D

22/06/2026 10/07/2026 Actions
3704 VAS Product Release 2.0 Integrated Testing In Progress Jagatheswaran J

14/05/2026 24/05/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3703 VAS Product Release 2.0 Mechanical Design and Fabrication In Progress Dhanasekar T

04/05/2026 20/05/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3701 VAS Product Release 2.0 Communication reliability testing Hold Shiva Leela

22/06/2026 23/06/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3700 VAS Product Release 2.0 ES Documentation In Progress Mohan Kashyap

22/06/2026 26/06/2026 VAS Product Release 2.0 - Future Actions
3699 VAS Product Release 2.0 Python Integration New Mohan Kashyap

15/06/2026 30/06/2026 VAS Product Release 2.0 - Future Actions
3692 VAS Product Release 2.0 Onsite Installation Resolved VenuMadhav S

08/06/2026 12/06/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3691 Kardib tool chain test and flashing In Progress Gowri G

04/06/2026 Actions
3690 Kardib Product Requirements specification New Sumanth D

04/06/2026 Actions
3689 Kardib SW development In Progress Gowri G

04/06/2026 Actions
3688 Kardib mech enclosure design New Sumanth D

04/06/2026 Actions
3687 Kardib HW development In Progress Sumanth D

04/06/2026 Actions
3686 GW 2.2 N58 Module - B28 New Dhanasekar T

02/06/2026 12/06/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3685 GW 2.2 Procurement In Progress Dhanasekar T

02/06/2026 14/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3684 GW 2.2 Battery Charger Load-Dump Rev. Pol Protection - Design New Thomas Joseph

03/06/2026 15/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3683 GW 2.2 Integrated testing with Sensors New Channamallikarjuna Mattihalli

20/07/2026 23/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3682 mTracker(Mid Range GW)-Production ISO Documentation New VenuMadhav S

25/05/2026 03/06/2026 Actions
3681 mDAQ4-1(Mid Range mDAQ)-Production ISO Documentation New VenuMadhav S

25/05/2026 03/06/2026 Actions
3680 GW 2.2 Project Planning and Review In Progress Thomas Joseph

02/06/2026 10/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3679 GW 2.2 Preliminary Design In Progress Thomas Joseph

02/06/2026 03/06/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3678 GW 2.2 Customer requirements In Progress Thomas Joseph

02/06/2026 03/06/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3677 GW 2.2 Product Specification New Thomas Joseph

02/06/2026 02/06/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3676 GW 2.2 Device Readiness New Dhanasekar T

17/07/2026 17/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3675 GW 2.2 Panel Assembly New Dhanasekar T

15/07/2026 17/07/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3674 GW 2.2 Panel Design In Progress Dhanasekar T

02/06/2026 23/06/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3673 GW 2.2 Parts list In Progress Dhanasekar T

02/06/2026 23/06/2026 SAM E54 Platform - Zarro Integrated - mDAQ Lite Actions
3671 VAS Product Release 2.0 Cable design and assembly In Progress Surendra Naik

01/06/2026 05/06/2026 VAS Product Release 2.0 - BSH Actions
3670 VAS Product Release 2.0 Alert tone feature - Device Hold Mohan Kashyap

01/06/2026 05/06/2026 VAS Product Release 2.0 - BSH Actions
3669 VAS Product Release 2.0 mDAQ3 Device readiness In Progress VenuMadhav S

29/05/2026 05/06/2026 VAS Product Release 2.0 - BSH Actions
3668 VAS Product Release 2.0 Operating Manual In Progress Mohan Kashyap

08/06/2026 11/06/2026 VAS Product Release 2.0 - BSH Actions
3667 VAS Product Release 2.0 Mechanical Assembly In Progress Dhanasekar T

09/06/2026 11/06/2026 VAS Product Release 2.0 - BSH Actions
3666 VAS Product Release 2.0 mDAQ3 ES Flashing and debugging provisions(converter module)-Testing and Assembly In Progress Surendra Naik

29/05/2026 09/06/2026 VAS Product Release 2.0 - BSH Actions
3665 VAS Product Release 2.0 mDAQ3 ES Flashing and debugging provisions(converter module)-Design In Progress Surendra Naik

29/05/2026 29/05/2026 VAS Product Release 2.0 - BSH Actions
3663 VAS Product Release 2.0 Testing of mini PC performance Resolved Chetan Hugar

20/05/2026 03/06/2026 VAS Product Release 2.0 - BSH Actions
3662 VAS Product Release 2.0 Project Planning and Review In Progress Thomas Joseph

01/04/2026 30/06/2026 VAS Product Release 2.0 - BSH Actions
3660 VAS Product Release 2.0 Testing of GEMSD241205 (24V to 12V Buck module) In Progress VenuMadhav S

29/05/2026 02/06/2026 VAS Product Release 2.0 - BSH Actions
3659 VAS Product Release 2.0 Testing of mini UPS performance In Progress VenuMadhav S

29/05/2026 03/06/2026 VAS Product Release 2.0 - BSH Actions
3658 VAS Product Release 2.0 Testcase document preparation Resolved Jagatheswaran J

06/05/2026 Actions
3572 SAMA5D2_XPLD BoM Analysis Started Bhavani M

01/06/2026 03/06/2026 Actions
3571 SAMA5D2_XPLD Board Brinfg-up New Bhavani M

21/06/2026 22/06/2026 Actions
3570 SAMA5D2_XPLD PCB Assembly New Dhanasekar T

17/06/2026 20/06/2026 Actions
3569 SAMA5D2_XPLD PCB Fabrication New Dhanasekar T

10/06/2026 16/06/2026 Actions
3568 SAMA5D2_XPLD Procurement New Dhanasekar T

02/06/2026 08/06/2026 Actions
3566 SAMA5D2_XPLD PCB Design Resolved Bhavani M

04/06/2026 09/06/2026 Actions
3565 SAMA5D2_XPLD Schematic Design In Progress Bhavani M

29/05/2026 03/06/2026 Actions
3564 SAMA5D2_XPLD Preliminary Design New Bhavani M

20/05/2026 20/05/2026 Actions
3563 SAMA5D2_XPLD Product Requirement Specification In Progress Bhavani M

19/05/2026 20/05/2026 Actions
3562 SAMA5D2_XPLD Project Planning and Review In Progress Thomas Joseph

19/05/2026 19/06/2026 Actions
3557 VAS Product Release 2.0 GEPSU122401 (12V Boost Module) Testing Hold VenuMadhav S

08/05/2026 12/05/2026 VAS Product Release 2.0 - BSH Actions
3555 Ad-Hoc Design and Development Software development and testing Hold Gowri G

29/04/2026 30/04/2026 Actions
3554 Ad-Hoc Design and Development Module integration with TV2.1 New Resmi K.V

29/04/2026 29/04/2026 Actions
3553 Ad-Hoc Design and Development ADXL345 testing Analysis Started Gowri G

29/04/2026 30/04/2026 Actions
3545 VAS Product Release 2.0 mDAQ3 faceplate screenprint Design New VenuMadhav S

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3544 VAS Product Release 2.0 mDAQ3 faceplate fabrication and Screenprinting New Dhanasekar T

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3543 VAS Product Release 2.0 mDAQ3 Faceplate Design New VenuMadhav S

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3542 VAS Product Release 2.0 mDAQ3 Interface PCB Assembly New Dhanasekar T

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3541 VAS Product Release 2.0 mDAQ3 Interface PCB Fabrication New Dhanasekar T

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3540 VAS Product Release 2.0 mDAQ3 Interface PCB Design New VenuMadhav S

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3528 mDAQ4-1(Mid Range mDAQ)-Pilot RTU data is not updating on the dashboard. New Greeshma Rayani

01/04/2026 Actions
3525 VAS Product Release 2.0 Communication Protocol Update In Progress Mohan Kashyap

30/03/2026 26/06/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3524 VAS Product Release 2.0 Delivery and Installation In Progress Thomas Joseph

01/05/2026 10/07/2026 VAS Product Release 2.0 - BSH Actions
3523 VAS Product Release 2.0 System Testing In Progress Jagatheswaran J

10/06/2026 12/06/2026 VAS Product Release 2.0 - BSH Actions
3521 VAS Product Release 2.0 VAS - Threshold Setting Resolved Jiban Munda

VAS Product Release 2.0 - BSH Actions
3520 VAS Product Release 2.0 Mechanical Fabrication In Progress Dhanasekar T

20/04/2026 09/06/2026 VAS Product Release 2.0 - BSH Actions
3519 VAS Product Release 2.0 Mechanical Design In Progress Dhanasekar T

18/04/2026 03/06/2026 VAS Product Release 2.0 - BSH Actions
3518 VAS Product Release 2.0 Preliminary Design Resolved VenuMadhav S

31/03/2026 02/04/2026 VAS Product Release 2.0 - BSH Actions
3517 VAS Product Release 2.0 Procurement In Progress Dhanasekar T

31/03/2026 08/06/2026 VAS Product Release 2.0 - BSH Actions
3516 VAS Product Release 2.0 Parts list In Progress Dhanasekar T

31/03/2026 29/05/2026 VAS Product Release 2.0 - BSH Actions
3515 VAS Product Release 2.0 Customer Requirement Specification In Progress Thomas Joseph

26/03/2026 30/03/2026 VAS Product Release 2.0 - BSH Actions
3460 Gateway 3.0 Gerber Release Resolved Bhavani M

02/04/2026 02/04/2026 Gateway 3.0 - GW3.0 Production Actions
3459 Gateway 3.0 Carrier board Brinfg-up Resolved Dhilip Kumar R

07/04/2026 08/04/2026 Gateway 3.0 - KT-Release 1 Actions